| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared etc., complete as directed by the site in-charge |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc., complete as directed by the site in-charge. |
| 3 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material etc., complete as directed by the site in-charge. |
| 4 | Trenching in ordinary soil up to a depth of 45 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure) etc., complete as directed by the site in-charge. |
| 5 | Rough dressing the trenched ground including breaking clods etc., complete as directed by the site in-charge. |
| 6 | Removing of Malba Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50 m and lift up to 1.5 m, disposed material to be neatly dressed. etc., complete as directed by the site in-charge. |
| 7 | Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation. etc., complete as directed by the site in-charge |
| 8 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment) etc., complete as directed by the site in-charge |
| 9 | Supplying of Vermicompost at site with properties such as dark brown color, lack of odor, fine & uniform texture in complete etc., complete as directed by the site in-charge. |
| 10 | Spreading of vermicompost and/or good earth in required thickness as per direction of officer-in-charge (cost of vermicompost and/ or good earth to be paid separately). etc., complete as directed by the site in-charge |
| 11 | Mixing earth and vermicompost in the required proportion specified or directed by the officer-in-charge etc., complete as directed by the site in-charge |
| 12 | Fine dressing of the ground. etc., complete as directed by the site in-charge |
| 13 | Supplying & Stacking of Selection No.1 grass turf at site fresh & free from weeds having proper roots, lush green including loading, unloading, carriage and all taxes paid etc. and as per direction of the officer-in-charge. etc., complete as directed by the site in-charge |
| 14 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying of good earth, if needed (the grass and good earth shall be paid separately) etc., complete as directed by the site in-charge |
| 15 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid separately) etc., complete as directed by the site in-charge |
| 16 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid separately) etc., complete as directed by the site in-charge |
| 17 | Provision for purchase of Flowering dot plants, shrubbery plants and temple related flowering trees. etc., complete as directed by the site in-charge |
| 18 | Nerium oleander |
| 19 | Tecoma Stans |
| 20 | Tabernaemontana divaricata |
| 21 | Hedge Plants Hibiscus/Cloredendron |
| 22 | Trees (ficus fistulosa, butea monosperma, ficus religiosa, saraca ashoka etcc.) |
| 23 | Plantation of Trees, Shrubs, Hedge, ground covers and seasonal plants at site i/c watering and removal of unsaverieable materialls as per direction of officer in charge (excluding cost of plant & water). etc., complete as directed by the site in-charge |
| 24 | Trees plant |
| 25 | Shrubs Plant |
| 26 | Hedge Plant |
| 27 | Shaping and dressing of the existing land for garden development in the naturally sloping and undulated area, utilizing the natural terrain formation without disturbing the existing slope, including leveling, and preparation of the ground suitable for landscape development, complete as per site requirement etc., complete as directed by the site in-charge. |
| 28 | Shaping of the ground to provide proper water drainage towards designated outlets within the site area, ensuring smooth flow of rainwater and preventing stagnation and soil erosion, including necessary leveling, dressing, and formation of gentle slopes as per site requirements etc., complete as directed by the site in-charge. |
| 29 | Drilling of 8/6 inch Dia borewell in soil and rocky soil, up to 300 rmt depth by suitable method, including Cost of 8/6 inch Dia casing pipe with other required materials like mud , jelly , lime , water etc. etc., complete as directed by the site in-charge. |
| 30 | 8 inch Drilling Charge up to 300 rmt |
| 31 | Cost of 8 inch Casin pipe 90 Mtrs |
| 32 | Compressor |
| 33 | Supply and installation of suitable submersible motor pumping set 3phase (Crompton/Kirloskar or any other equalling ISI marked brand) with required head and discharge suitable for borewell with starter, main switch, ampere meter, volt meter fixed on 18 mm ply board of suitable size including cost of labour for lowering into bore well. Cost of fitting required for connection with main line: plumbing and electrician charge for complete installation at site. The rate are based on local prevailing rate. etc., complete as directed by the site in-charge. |
| 34 | Suitable submersiable motor7.5/5 HP for watering |
| 35 | HDPE / Colum Pipe 2.5 inch for erection of Motor at 70 meter depth |
| 36 | 3 core 4 Square mm flat cable |
| 37 | Indoor control unit |
| 38 | Outdoor panel box 1 no |
| 39 | Automatic 3 phase motor starter for submersible pump set |
| 40 | Supplying of 2.5 inch PVC pipes ( ISI) standard, Cost , loading, unloading , transport supply at site. The rates are based on local prevailing market rate etc., complete as directed by the site in-charge. |
| 41 | Supply of 2.5 inch PVC pipe (ISI marked) |
| 42 | Handling, carriage &loading, unloading |
| 43 | Transport |
| 44 | Laying and fitting labour charge of 2.5 inch pvc pipe for water pipe line. The rate are based on local prevailing Including Trenching , Hydrants i.e. 1.5 Inch 2 feet G.I pipe threaded, G.I Bend ,Coupling, PVC Tee, FTA MTA & Solvent. The rate are based on local prevailing rate etc., complete as directed by the site in-charge. |
| 45 | Excavation of trench for pipeline |
| 46 | Labour for laying & jointing PVC pipe |
| 47 | Hydrant arrangement (1.5\\" × 2 ft G.I pipe threaded) |
| 48 | G.I Bend |
| 49 | G.I Coupling |
| 50 | PVC Tee |
| 51 | FTA / MTA |
| 52 | Solvent cement & jointing material |
| 53 | Refilling and finishing trench Please Enable Macros to View BoQ information |