| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish lead up to 50 m and lift up to 1.5 m; from plot no.T1 to T4 etc., complete as directed by site-in-Charge. |
| 2 | Trenching in ordinary soil up to a depth of 30 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure) etc., complete as directed by the site in charge. |
| 3 | Supplying and stacking of good earth at site including royalty and carriage up to 5 km lead complete (earth measured in stacks will be reduced by 20% for payment) rate etc., complete as directed by the site in-charge. |
| 4 | Supplying of Vermi compost for lawn area etc., complete as directed by the site in-charge. |
| 5 | Rough dressing the trenched ground including breaking clods etc., complete as directed by the site in-charge. |
| 6 | Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation etc., complete as directed by the site in-charge. |
| 7 | Spreading of manure and good earth in required thickness etc. complete as directed by the site in-charge. |
| 8 | Fine dressing the ground etc., complete as directed by the site in-charge. |
| 9 | Supplying & Stacking of Selection No.1/ doob /Bermuda grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc., complete as directed by the site in-charge. |
| 10 | Grassing with selection No. 1 doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth etc., complete as directed by the site in charge. |
| 11 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, levelling etc., including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50 m, lift up to 1.5 m (cost of sludge, manure or extra earth to be paid separately) etc., complete as directed by the site in charge. |
| 12 | Purchase of Dung manure for preparation of shrubbery etc., complete as directed by the site in charge. |
| 13 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, with all leads and lifts (cost of manure, sludge or extra good earth) etc., complete as directed by the site in charge. |
| 14 | Requirement of dung manure for preparation of flowering dot shrubs and temple related trees etc., complete as directed by the site in charge. |
| 15 | Purchase of Flowering dot plants, shrubbery plants and temple related flowering trees etc., complete as directed by the site in charge |
| 16 | Nerium oleander |
| 17 | Thecoma Stan |
| 18 | Tabernaemontana divaricata |
| 19 | Plumeria sps. |
| 20 | Cassia fistula |
| 21 | Hibiscus Dwarf |
| 22 | Ixora sps.Dwarf |
| 23 | Jasmium |
| 24 | Coconut trees |
| 25 | Gardenia |
| 26 | Artabotrys hexapetalus |
| 27 | Nyctanthes arbor-tristis |
| 28 | Hedge Plants Hibiscus/Cloredendron (581 x 7=4067) |
| 29 | Catctus Plants |
| 30 | Transport and including loading , unloading supply at site |
| 31 | Purchase of garden Tools and Implements etc., complete as directed by the site in charge. |
| 32 | Spade with handle |
| 33 | Crow bar |
| 34 | Bamboo/plant basket |
| 35 | 1.5 inch Transparent hose |
| 36 | Double Wheel barrow |
| 37 | Plastic or Iron Pans |
| 38 | Pick axe |
| 39 | Brush Cutter |
| 40 | Lawn mower |
| 41 | Hedge trimmer petrol |
| 42 | Drilling of suitable size borewell in soil and rochy soil, up to 300 feet’s depth by suitable method, including Cost of 6 inch dia casing pipe, other required materials like mud, jelly , lime , water etc., complete as directed by the site in charge. |
| 43 | 2 inch UPVC column pipes ISI standard for erection of the suitable submersible pumpset in the borewell for watering and erection charge etc., complete as directed by the site in charge. |
| 44 | Supply and installation of 2.5 inch PVC pipes (ISI) standard, Cost, loading, unloading, transport supply at site etc., complete as directed by the site in charge. |
| 45 | Laying and fitting labour charge of 2.5 inch PVC pipe for water pipe line including Trenching, Hydrants i.e., 1.5 Inch 2 feet G.I pipe threaded, G.I Bend, Coupling, PVC Tee, FTA, MTA & Solvent etc., complete as directed by the site in charge. |
| 46 | Excavation of trench for pipeline (avg. 0.6 m depth) 350 RMT X 0.6 X 0.5=105 Cu.m |
| 47 | Labour for laying & jointing PVC pipe |
| 48 | Hydrant arrangement (1.5\\" × 2 ft G.I pipe threaded) |
| 49 | G.I Bend |
| 50 | G.I Coupling |
| 51 | PVC Tee |
| 52 | FTA / MTA |
| 53 | Solvent cement & jointing material |
| 54 | Refilling and finishing trench |
| 55 | Supply and installation of suitable sub mersible motor pumping set 3 phase 5/7.5 HP (Texmo/ Crompton/Kirlosker or any other equivalent ISI marked brand) with required head and discharge suitable for bore well with starter, main switch, amphere meter, volt meter fixed on 18 mm ply board of suitable size including cost of labour for lowering into bore well. cost of fitting required for connection with main line: plumbing and electrician charge for complete installation at site etc., complete as directed by the site in charge |
| 56 | Submersible motor 5/7.5 HP Branded |
| 57 | Automatic 3 phase motor starter for submersible pump set |
| 58 | Main switch |
| 59 | Ampere Meter |
| 60 | Ampere Meter |
| 61 | volt meter |
| 62 | Cost of 3-phase power cable for the garden irrigation by motor pump etc., complete as directed by the site in charge. |
| 63 | Purchase of suitable indoor unit and outdoor box including fixed charge etc., complete as directed by the site in charge. |
| 64 | Cost and Service of cable for electricity supply to the Motor from Electricity pole to Bore Point (3 Phase electrical Line) etc., complete as directed by the site in charge. |
| 65 | Edging with bricks laid dry length wise, including required excavation, refilling, consolidating with hand packing and spreading surplus earth neatly within a lead of 50 common burnt clay F.P.S. (non modular) bricks of class etc., complete as directed by the site in charge. |
| 66 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared from plot no.1 & 2 to maintain pure Lawn etc., complete as directed by the site in charge. Please Enable Macros to View BoQ information |