| 1 | A) Erection Part |
| 2 | ERECTION PART for Augmentation 1-Phase LT Line and new 3-Phase LT Line at Village new 3-Phase LT Line at Village Chaproh to proposed 11/0.4KV-63 KVA at chaproh and Augmentation 2-Phase to 3-Phase LT Line from 11/0.4KV-100 KVA Sub-Station Balh WSS village Balh and village Kuwari from existing 11/0.4KV-100 KVA Sub-Station kuwari and proposed 1-Phase LT line to LOH at village Badela from existing 11/0.4KV-25 KVA Sub-Station Badla under ESD, HPSEB Ltd., Thanakalan. TS. N0-308/2023-24 WBS NO- 32100261-001-Una-Una-LT-338 |
| 3 | Erection of LT line. Digging of pit, erection of PCC Pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. |
| 4 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 5 | Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect. |
| 6 | Laying of conductor :- Laying of conductor, striging, sagging and biding with insulator with 7/2.50mm/7/3.15 mm Conductor aug. of New 3-Ph. Re-cond, 7/3.15 mm for 1-Ph. LT complete in all respect., |
| 7 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. |
| 8 | Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site |
| 9 | SUPPLY PART for Augmentation 1-Phase LT Line and new 3-Phase LT Line at Village new 3-Phase LT Line at Village Chaproh to proposed 11/0.4KV-63 KVA at chaproh and Augmentation 2-Phase to 3-Phase LT Line from 11/0.4KV-100 KVA Sub-Station Balh WSS village Balh and village Kuwari from existing 11/0.4KV-100 KVA Sub-Station kuwari and proposed 1-Phase LT line to LOH at village Badela from existing 11/0.4KV-25 KVA Sub-Station Badla under ESD, HPSEB Ltd., Thanakalan. TS. N0-308/2023-24 WBS NO- 32100261-001-Una-Una-LT-338 |
| 10 | PCC Pole 8 mtr. Long. |
| 11 | AAAC 7/3.15 mm2 Conductor |
| 12 | GI Wire |
| 13 | Channel Iron (75x40x5) [Length-1.50 Mtr + 0.2 Mtr] |
| 14 | Full Clamp |
| 15 | Half Clamp for Cross Arm |
| 16 | Nut and Bolts |
| 17 | Shackle Insulator with D-Iron |
| 18 | Earth Hook/Eye Hook Bolt |
| 19 | Stay Set Complete (i/c stay clamp) |
| 20 | Stay Wire (7/3.15mm) (6.0 kg per stay set) |
| 21 | Earthing Set Complete (preferbly coil earthing) |
| 22 | ERECTION PART for replacements of lengthy services with 1-PHASE LT Line with bare conductor AAC 7/3.15 mm2 at Village Parion from existing 11/0.4KV-63KVA Sub-Station (Parioan) and 1-Phase LT Line at Village Raipur Maidan from existing 11/0.4KV-25KVA Sub-Station Raipur under ESD, HPSEB Ltd., Thanakalan . TS. N0-313/2025-26 WBS NO- 32100261-001-Una-Una-LT-837 |
| 23 | Erection of LT line. Digging of pit, erection of PCC Pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. |
| 24 | Erection of LT line. Digging of pit, erection of ST Pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. |
| 25 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 26 | Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect. |
| 27 | Laying of conductor :- Laying of conductor, striging, sagging and biding with insulator with 7/2.50mm/7/3.15 mm Conductor aug. of New 3-Ph. Re-cond, 7/3.15 mm for 1-Ph. LT complete in all respect., |
| 28 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. |
| 29 | Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site |
| 30 | SUPPLY PART for replacements of lengthy services with 1-PHASE LT Line with bare conductor AAC 7/3.15 mm2 at Village Parion from existing 11/0.4KV-63KVA Sub-Station (Parioan) and 1-Phase LT Line at Village Raipur Maidan from existing 11/0.4KV-25KVA Sub-Station Raipur under ESD, HPSEB Ltd., Thanakalan . TS. N0-313/2025-26 WBS NO- 32100261-001-Una-Una-LT-837 |
| 31 | PCC Pole 8 mtr. Long. Provided by HPSEBL |
| 32 | ST Pole 8 mtr. Long. Provided by HPSEBL |
| 33 | AAAC 7/3.15 mm2 Conductor Provided by HPSEBL |
| 34 | GI Wire Provided by HPSEBL |
| 35 | RCC Muff |
| 36 | Channel Iron (75x40x5) [Length-1.50 Mtr + 0.2 Mtr] |
| 37 | Full Clamp |
| 38 | Half Clamp for Cross Arm |
| 39 | Nut and Bolts |
| 40 | Shackle Insulator with D-Iron |
| 41 | Earth Hook/Eye Hook Bolt |
| 42 | Stay Set Complete (i/c stay clamp) |
| 43 | Stay Wire (7/3.15mm) (6.0 kg per stay set) |
| 44 | Earthing Set Complete (preferbly coil earthing) |
| 45 | Aluminium Paint |
| 46 | Red Oxide |
| 47 | ERECTION PART for replacement of existing cracked/rusted/rotten HT Pole at Village Amdroli, Raipur, Lidkot, Khalberi and Porian in Raipur & Talai Section on existing 11KV Raipur Feeder under ESD, HPSEB Ltd., ThanaKalan for the year 2025-2026. TS. N0-144/2025-26 WBS NO- 32100261-001-Una-Una-HT-141 |
| 48 | Erection of S.T Single Pole Str. 9 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit ,G.O. Switch, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 49 | Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 50 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 51 | SUPPLY PART for replacement of existing cracked/rusted/rotten HT Pole at Village Amdroli, Raipur, Lidkot, Khalberi and Porian in Raipur & Talai Section on existing 11KV Raipur Feeder under ESD, HPSEB Ltd., ThanaKalan for the year 2025-2026. TS. N0-144/2025-26 WBS NO- 32100261-001-Una-Una-HT-141 |
| 52 | Prov. Steel Tublar 9 mtr long with cap. (Provided By HPSEBL) |
| 53 | Prov. RCC Muff |
| 54 | Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm |
| 55 | Prov. Angle Iron (50x50x6mm) Leggth 750 mmx2 |
| 56 | Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm |
| 57 | Prov.Nuts and Bolts of Various Sizes |
| 58 | Prov.MS Half Clamp (Provided By HPSEBL) |
| 59 | Prov.Barbed Wire |
| 60 | Prov.Eye/Earth Hook |
| 61 | Prov.11kv Pin Insulator with pin complete in all respect |
| 62 | Prov.11kv Earthing set complete in all respect. |
| 63 | Prov.Red Oxide (1.5 Ltr. Per Pole) |
| 64 | Prov.Alluminum Paint |
| 65 | Prov.11kv Danger Plate (250x200x1.6 mm) |
| 66 | ERECTION PART for Proposed 11/0.4kv- 63kva Sub-Station along with aug of 1ph to 3ph LT Line and new 3ph LT Line at Village Chhaproh under Electrical Sub-Division HPSEB Ltd., Thanakalan TS. N0-337/2023-24 WBS NO- 32100261-001-Una-Una-DTR-133 |
| 67 | Erection of63 kva S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. |
| 68 | SUPPLY PART for Proposed 11/0.4kv- 63kva Sub-Station along with aug of 1ph to 3ph LT Line and new 3ph LT Line at Village Chhaproh under Electrical Sub-Division HPSEB Ltd., Thanakalan TS. N0-337/2023-24 WBS NO- 32100261-001-Una-Una-DTR-133 |
| 69 | Distribution Transformer (Ordinary) 11/0.4 KV, 63KVA (Provided By HPSEBL) |
| 70 | Steel Tubular Poles (9 m, Working load>200Kgf/m2) (Provided By HPSEBL) |
| 71 | Muffs with concrete filling |
| 72 | X-Arm (Channel Iron (100X50X6mm) Length 2800mm X 2 No's) for incomer Line. Provided by HPSEBL |
| 73 | MS Angle Iron (50X50X5mm) Length 2800mm x1 No's for LA's . |
| 74 | X-Arm (Channel Iron (75X40X6mm) Length: ( 2800mm x 4 No's) for supporting DO fuse unit & GO switch (Provided By HPSEBL) |
| 75 | Transformer Belting & Knee Bracing |
| 76 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed Provided by HPSEBL |
| 77 | X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer] |
| 78 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 79 | MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos |
| 80 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 81 | Transformer LT Distribution Box and GO Switch fixing Assembly |
| 82 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x 2 Nos |
| 83 | MS Angle Iron (50X50x6 mm), Length: (450 mm) x 1 Nos |
| 84 | GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length: 460 mm |
| 85 | GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type |
| 86 | D.O Fuse Unit |
| 87 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 88 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) (Provided By HPSEBL) |
| 89 | Stay set complete |
| 90 | Stay Wire (7/3.15 mm) (7.0 kg per Stay Set) |
| 91 | Pipe Earthing Set |
| 92 | LT Distribution Panel Box with MCCB (40A, 25 kA, 4P) and SFU (16A, 4No, rewirable) Provided by HPSEBL |
| 93 | Half Clamp (M.S. Flat 50X6 mm) |
| 94 | Full Clamps (M.S. Flat 50X6 mm) |
| 95 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 96 | Aluminium Thimble |
| 97 | Thimble copper 200 amps |
| 98 | Danger Plate |
| 99 | Barbed Wire |
| 100 | LT Cable (3.5 Core) 70 mm² |
| 101 | Energy Meter (3-Phase, 4-Wire) DLMS compliant 50 A CT Type for 63KVA Transformer Provided by HPSEBL |
| 102 | Aluminium Paint. |
| 103 | Prov.Red Oxide (1.5 Ltr. Per Pole) Please Enable Macros to View BoQ information |