| 1 | Safe carriage of 8.5 mtr. Long PCC pole from store center Etah 33/11 KV S/S to direct pit site in distance range 0 to 60 Km including loading & unloading at both ends. |
| 2 | Safe carriage of 11/13 mtr. long STP pole from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. |
| 3 | Safe carriage of 9 mtr. long STP pole from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. |
| 4 | Safe carriage of line material from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 5 | Safe carriage of following T/F from store center, Etah JE store to different pit site in distance range 0 to 60 Km including loading & unloading at both ends. |
| 6 | 10/16 KVA |
| 7 | 25/63 KVA |
| 8 | 100 KVA |
| 9 | Erection of 8.5 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 10 | Erection of 11/13 mtr long ST Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 11 | Erection of 9 mtr long ST Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 12 | Erection of 8.5 mtr. long PCC poles as D/P or section pole including fixing of HT/LT accessories with TPMO etc. complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 13 | Erection of 11/13 mtr. long ST poles as D/P including fixing of HT/LT accessories with TPMO etc. complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 14 | Dismentalling of old ACSR Weseal/Dog Conductor stacking of proper place. |
| 15 | Laying sagging, stringing, binding and jumpering etc of following conductor as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc required for proper completion of work. |
| 16 | Dog/Racuen Conductor |
| 17 | ACSR weasel |
| 18 | HT 11 KV XLPE Cable 3x70 sq mm |
| 19 | 11 KV XLPE Cable size 3x185 sq mm |
| 20 | 11 KV XLPE Cable size 3x120 sq mm |
| 21 | AB Cable of size 3X50/3x95 sq mm |
| 22 | AB Cable of size 1x25+1x16 sq mm |
| 23 | LT Cable 4x16/2x4/2x6 sq. mm |
| 24 | Fixing of stay rod with nozzling etc complete. |
| 25 | Fixing of Single/Three Phase Distribution Box with clamp |
| 26 | Providing and fixing of suspension clamp for PCC/ST pole |
| 27 | Providing and fixing of Nut Bolts off size |
| 28 | Providing and fixing of LT Shackle Insulator/LT Pin Clamp/Double Pole Clamp for PCC/ST pole |
| 29 | Providing and fixing of Dead End Clamp/Piercing Connector for AB Cable |
| 30 | Providing and fixing of Stone Pad 300x300x75 mm |
| 31 | Providing and fixing of Danger Board with Clamp |
| 32 | Providing and fixing of Barbed Wire as per norrms |
| 33 | Providing and fixing of Number Plate as per norrms |
| 34 | Fixing of Outdoor Jointing Kit suitable for 11 KV 3x185 sq mm XLPE Cable |
| 35 | Fixing of Indoor Jointing Kit suitable for 11 KV 3x185 sq mm XLPE Cable |
| 36 | Fixing of Outdoor Jointing Kit suitable for 11 KV 3x70 sq mm XLPE Cable |
| 37 | Fixing of Indoor Jointing Kit suitable for 11 KV 3x70 sq mm XLPE Cable |
| 38 | Mounting of following transformers at double/Single pole of PCC/ST Pole supports including connections with LT line etc. complete. |
| 39 | 10/16 KVA |
| 40 | 25/63 KVA |
| 41 | 100 KVA |
| 42 | Earthing of PCC Pole/STP/DT with MS earth rod as per RESPO norms/specification. |
| 43 | New guarding of HT lines with GI wire as per RESPO norms/specification. |
| 44 | Carriage of following old material from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking. |
| 45 | ACSR Dog/Weseal Conductor (Scrap) |
| 46 | Line Material (Scrap) Please Enable Macros to View BoQ information |