|
| 1 | Safe carriage of 8.5/9 mtr. long PCC pole from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 10 Km. including loading & unloading at both ends. |
| 2 | Safe carriage of 9/11/13 mtr STP from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 10 Km. including loading & unloading at both ends. |
| 3 | Safe carriage of line material from store center Etah/nearest substation to pit site in distance range 0 to 10 Km. including loading & unloading at both ends. |
| 4 | Opening of binding & removal of following conductor with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. |
| 5 | Dog/ Raccoon/ Rabbit conductor |
| 6 | AAAC/ACSR weasel conductor/ GI wire. |
| 7 | ABC 3X95+1X35+1X16/3X50 |
| 8 | ABC 3X120+1X70+1X16 |
| 9 | Erection of 8.5/9 mtr. long PCC poles as single support including fixing of all HT/LT accessories etc. complete. Pole should be grouted properly as per DVVNL/RESPO norms. |
| 10 | Erection of 9/11/13 mtr.STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO norms. |
| 11 | Erection of 8.5/9 mtr. long PCC poles as Double Pole/section pole including drilling,cutting etc. and fixing of all accessories etc. complete. Pole should be grouted properly as per DVVNL/RESPO norms. |
| 12 | Erection of 9/11/13 mtr. STP as Double Pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete. Pole should be grouted properly as per DVVNL/RESPO norms. |
| 13 | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ACSR/ weasel/ Reccoon/Dog conductor including binding and nuzzling etc. complete. |
| 14 | Dog/ Raccoon/ Rabbit conductor |
| 15 | AAAC/ACSR weasel conductor/ GI wire. |
| 16 | ABC 3X95+1X35+1X16/3X50 |
| 17 | ABC 3X120+1X70+1X16 |
| 18 | Straighting of tilted PCC poles/STP/Rail single support of HT/LT line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line. |
| 19 | Straighting of tilted D/P after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete. |
| 20 | Opening of HT/LT connections & lowering of following T/F from D/P/Plinth and shifting up to in safer place. |
| 21 | 25/63 KVA T/F |
| 22 | 100 KVA T/F |
| 23 | Dismanteling of old/damage STP/RS Joist of HT/LT line and carriage to store centre Etah |
| 24 | Re-sagging of loose 33/HT/LT conductor after opening, binding, nozzling etc. |
| 25 | Dog/ Raccoon/ Rabbit conductor |
| 26 | AAAC/ACSR weasel conductor/ GI wire. |
| 27 | ABC 3X120+1X70+1X16 |
| 28 | ABC 3X95+1X35+1X16 |
| 29 | ABC 3X50+1X35+1X16 |
| 30 | Replacement of following broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 31 | 11 KV cross arms V type |
| 32 | 11 KV pin insulator |
| 33 | 11 KV pin with nut |
| 34 | 11 KV Disc insulator |
| 35 | Cross Arms holding clamps |
| 36 | F Clamps |
| 37 | LT shackle insulator |
| 38 | 33 KV cross arm. |
| 39 | 33 KV pin with nut |
| 40 | 33 KV pin insulator |
| 41 | Retightining of Stay rod. Etc. complete. |
| 42 | Providing fixing of stay rod with nuzzling etc. complete. |
| 43 | Earthing of PCC/RS Joist/STP as per RESPO norms. |
| 44 | Carriage of old material from pit site to JE store/store center, Etah in distance range 0 to 10 km including loading & unloading and proper stacking. |
| 45 | Mounting of Following Transformers on double pole/Plinth including making of the connection etc complete. |
| 46 | 25/63 KVA T/F |
| 47 | 100 KVA T/F |
| 48 | Chopping of tree branches |
| 49 | Disconnecting of LT service line of following category of consumers before dismantling of old LT line and the reconnections through distribution boxes/kiosk, supply & fixing of clamp/connectors etc. for consumer service cables after commissioning of line. |
| 50 | Single phase consumer. |
| 51 | Three phase consumer. |
| 52 | Repairing/ Resagging /New guarding of HT lines with GI wire as per RESPO norms. Please Enable Macros to View BoQ information |