| 1 | Earth work in excavation for roadway, including trimming bottom andside slopes in accordance with requirement of line, grades and crosssections, including disposal of surplus material with all lift and leadupto 1000 metre as per MoRT&H specification clause 301 |
| 2 | Dismantling of existing structures like culverts, bridges, retainingwalls, CC road and other structure comprising of masonry, cementconcrete, wood work, steel work, including T&P and scaffoldingwherever necessary, sorting the dismantled material, disposal ofunserviceable material and stacking the serviceable material with alllifts and lead of 50 metres as directed by Engineer |
| 3 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 4 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel 1:3:6 (1 Cement : 3 fine/ coarse sand : 6 graded stone aggregate 40mm nominal size). |
| 5 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded20mm nominal size stone aggregate) finished with a floating coat ofneat cement including cement slurry, but excluding the cost ofnosing of steps etc. complete. including Providing /mixing ofsynthetic fibers compulsorily complying with IS 16481:2022 of 06mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.125 gms per 50 kg Cement up to 900 gms per cum of Concrete/mortar |
| 6 | Random rubble masonry with hard stone in foundation and plinthincluding levelling up with cement concrete 1:6:12 (1 cement : 6coarse sand : 12 graded stone aggregate 20 mm nominal size) uptoplinth level with Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 7 | Brick work with FPS bricks of class designation 75 in foundationand plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 8 | Cement plastering including T&P, scaffolding, material and completelabour, including cost of water, curing, racking of joints etc. with 12mm cement plaster of mix : including Providing /mixing of syntheticfibers compulsorily complying with IS 16481:2022 of 06 mm/12 mmlength to be mixed @ 0.25% by weight of Cement i.e. 125 gms per50 kg Cement up to 900 gms per cum of Concrete/ mortar |
| 9 | Construction of embankment with approved material obtained fromborrow pit with all lifts and leads, transporting to site, spreading,grading to required slope and compacting by vibratory roller 8-10tonne to meet requirement of table 300-2 including cost ofcompensation for earth taken from private land complete as perMoRT&H specification clause 305. (Lead taken upto 5 km |
| 10 | Providing, laying and spreading of granular sub-base by providingcoarse graded Material (Table 400-2), spreading in uniform layerswith motor grader on prepared surface, mixing BY MIX IN PLACEMETHOD with rotavator at OMC, and compacting with vibratoryroller to achieve the desired density, complete as per MoRT&Hspecification clause - 401 including all material, labour, machinery,lighting, guarding and maintenance of diversion |
| 11 | Distempering with dry distemper of approved brand andmanufacture (two or more coats) and of required shade on newwork, over and including priming coat of whiting to give an evenshade Please Enable Macros to View BoQ information |