| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. .2.8 |
| 2 | All kinds of soil. .2.8.1 |
| 3 | Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : .2.10 |
| 4 | Pipes cables etc. exceeding 80mm dia but not exceeding 300mm dia as per. .2.10.1.2 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : .4.1 |
| 6 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). .4.1.3 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: .6.1 |
| 8 | Cement mortar 1:4 (1 cement : 4 coarse sand) .6.1.1 |
| 9 | 12 mm cement plaster finished with a floating coat of neat cement of mix : .13.7 |
| 10 | 1:4 (1 cement: 4 fine sand) .13.7.2 |
| 11 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work .18.12 |
| 12 | 50 mm dia nominal bore .18.12.6 |
| 13 | Providing lead caulked joints to spun iron or C.I. pipes and specials, including testing of joints but excluding the cost of pig lead : .18.28 |
| 14 | 100 mm diameter pipe .18.28.1 |
| 15 | 150 mm diameter pipe .18.28.3 |
| 16 | Supplying pig lead at site of work. .18.29 |
| 17 | Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : .18.31 |
| 18 | 100 mm diameter .18.31.1 |
| 19 | Class II .18.31.1.2 |
| 20 | 150 mm diameter .18.31.3 |
| 21 | Class II .18.31.3.2 |
| 22 | Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (New work) : .18.46 |
| 23 | 50 mm nominal bore .18.46.6 |
| 24 | Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS :8329: .18.72 |
| 25 | 100 mm dia Ductile Iron Class K-9 pipes .18.72.15 |
| 26 | 150 mm dia Ductile Iron Class K-9 pipes .18.72.16 |
| 27 | Providing and fixing of repair clamps for various kinds of pipes leakage made of SS 304, EPDM rubber nuts & bolts complete in all respects make VAG/L&T/kirloskar/IVC of following sizes for repairing the leakages of all kind of pipes. .NSR |
| 28 | 100mm dia length 300mm . |
| 29 | 150mm dia length 300mm . |
| 30 | Plugging of leakage/repair of CI lead caulked joints, including excavation, dewatering, backfilling, and diversion board for traffic signal watch & ward, complete in all respects. (Pig lead will be supplied by the department on an actual consumption basis) .NSR |
| 31 | 80mm dia . |
| 32 | 100mm dia . |
| 33 | 150mm dia . |
| 34 | Providing the services of JCB excavator for locating the buried line, excavation, backfilling etc. complete in all respects. .NSR |
| 35 | Providing and fixing of repair clamps for PVC Pipe leakage Tertiary water line complete in all respects. .NSR |
| 36 | 90mm o/d UPVC Pipe .i |
| 37 | Providing and fixing of PVC pipe 6 kg/cm2 including cost of jointing & stringing complete in all respects .NSR |
| 38 | 90mm o/d . |
| 39 | 110mm o/d . |
| 40 | Providing and fixing of SFRC Inspection chamber cover 600x600x35 mm thick made out of M.S. angle iron size 35x35x5 mm and TMT bars 10 mm i/d both sides including cutting welding and fixing with Cement concrete 1: 1 1/2 : 3. .NSR Please Enable Macros to View BoQ information |