|
| 1 | Dismentaling of flexibal pavement and disposal of dismentled material upto lead off 100 mtrs stacking serviceable material and disposal of all unserviceable material etc complete as as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect. The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government. |
| 2 | Steel work Welded in built up sections, trusses and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint in trusses and trussed purlins in building, as per specification, approved drawing, design, to the entire satisfaction and direction of the Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkhana, toll tax, GST or any other taxes imposed by the Government. |
| 3 | Providng and applying primer coat with bitumen emulsion (SS-I) on the prepared surface of granular base including cleaning of road surface with hydraulic broom and spraying primer 0.85kg per sqm using mechanical means per M.O.R.D. technical specification Clauses 802 and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect. The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government. |
| 4 | P/A tackk coat with bitumen emulsion (RS-I) on prepared surfact of granular base including cleaning of road surface and spraying primer at the rate of 0.275 kg/using mechanical means as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect. The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government. |
| 5 | P/L and Siling of open graded premix carpet of 20mm completed thickness compassed of 3.2mm to 5.6mm aggrigate for wearing course including loading of aggregate with front and loader heating binder and aggregate in hot mix plant 30/40 tone per hour capacity transporting mixed material with tipper to the site of work and laying with payver fifnisher to the required grade and camber and rolling with power road roller 8-10 tonne using 0.27 cum of graded stone aggregate mixed with 14.60 kg of bitumen binder using VG-10 per 10 sqm of road sufrfcae to requied line and grage and level but excluding the cost of tack coat seal coat inclusive of all corrective mears such as laying of profile corrective corase for all depth filling of depration of super elivaiton and camber where requred as per drawing and technical specification clause 702, 704,1202 and 1204 and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect. |
| 6 | P/L seal coat for selaing the voids in a bitumens surface alid to specified level grade and grass fall using type-B manual meaning as per MORD technical specifcation section 500 using VG-10 at the salt of 6.80 kg 1 cum of the fine aggreagte spread uniformally per 10sqm of road surface in cluding neated in hot mix plant 30/40 tonne and laying of mixed material and salling with power road 80-100 KN static road roller as per drawings and M.O.R.D. technical specification Clauses 802,803,1202 and 1203 and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect. The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government. |
| 7 | Applying priming coat over new steen and other metal surfaces after and including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter sand papering and knotting. Ready mixed paint brushing with white lead for priming wood primer. as per HPPWD specifications,approved Drawing,design as per the entire satisfaction and direction of Engieer in charge including carriage of material within all leads lifts and other incidentals the rate inclusive of octri,royalty,malkana and all type of texes imposed by the Govt. |
| 8 | Painting two coats on new steel and other metal surface under coat with ready mixed paint brusing to give an even shade including cleaning the surface all dirt, dust and other foreign matter.as per HPPWD specifications,approved Drawing,designas to the entire satisfaction and direction of Engieer in charge including hauling carriage of materials to various location through all modes of transporation within all leads, lifts and other incidental complete in all respect. The rate inclusive of GST,octri,royalty,malkana and all type of texes imposed by the Govt. Please Enable Macros to View BoQ information |