|
| 1 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 3 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. complete in all respects but excluding GST. |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with 2% Cement (OPC) with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Techinical Speficiation Clause 401. complete in all respects but excluding GST. |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.Including 4% Cement (OPC) & Mising with rotavater) complete in all respects but excluding GST. |
| 6 | Providing & applying tack coat with V.G.-10 bitumen at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer cleaned with hydroulic broom as per Technical Specification Clause 503. |
| 7 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three whel 80-100 kN static foller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specificatio Clause 508. |
| 8 | Cleaning the premix surface and laying seal coat type C with 6.7 mm nominal size grit (passing 9.5 mm sieve & retained on 2.36 mm nomianl sieve) and bitumen including heating the paint and grit upto required temperature and mixing including cartage of material at site, and including maintenance of side patries and watering them during operation of work complete as per specification and also including all labour, material T&P etc. required for proper completion of the work as directed by the Engineer-in-charges work . |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 10 | Construction of un-reinforced, (Without dowel Bar) joined at expansion and construction joint only, plain cement concrete pavement, thickness of CC is less then 20 Cm., over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 (1:1½:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropiate weight batcher using approved mix design, laid in approved fixed side from work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clouse 1501 including Cost of Polythene Sheet and also including complete shifting of materials & Concrete etc. (M-30) S.I. No. Ch.-20 New Item 9(1) |
| 11 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. M-10 |
| 12 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 |
| 13 | Providing and laying Hume Pipe 350mm dia NP-3 class R.C.C. |
| 14 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 |
| 15 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 16 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. M-15 |
| 17 | White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915. Qty (Pointing+Plaster) |
| 18 | Supply & Fixing of Kilometer Stone Stone complete in all respects but excluding GST. |
| 19 | Supply & Fixing of hectometer Stone complete in all respects but excluding GST. |
| 20 | Supplying and fixing of foundation/inauguration granitestone of size 3'x2' including cutting, carving etc. compete as per direction of engineer in-charge. complete in all respects but excluding GST. Please Enable Macros to View BoQ information |