|
| 1 | Sub Est. No.01 Annual Maintenance of street lights in Taloja Industrial Area |
| 2 | Item No.01 Comprehensive maintenance ofstreet lights including providinglicenced electrician ,wireman andlabour for day to daychecking ,identifying ,reporting, andrectifying the faults in the street lightsystem,including replacingof burntaccessoriesof poles, cable ,wires ,pipes, brackets, feeder pillar anddirectedbyEngineer-incharge .Therateof the itemincludes cost of alllabours and spares such as wires,pipe, trench,cablesFPetccompleteduring the maintenance period |
| 3 | Sub Est. No.02 Replacement of damaged street light poles & accessories in Taloja Indl Area Item no.01 Hot Dipped Galvanized Poles &High-Mast (OH-HM) 1.1 Providing&erecting7mhigh(clear height) galvanised octagonal polewith foundationboltshavingbottomof 130mmA/F, top70mmA/Fonprovided foundation as perspecification no. OH-PL/OPL |
| 4 | 1.2 Providing and erecting galvanised 1000mm single arm sword type bracket with FRP dome and ball as per specification no. OH-PL/BKT |
| 5 | Item No.02 Outdoor Fittings (FG-ODF) 2.1 Supplying and erecting integrated LED street light fitting 100-110W IP65 & IK08 class having single piece pressure die-cast aluminium housing, having system lumens output of Min. 11000 Lumens, min. efficacy of 110 lumen/W, CRI>70, CCT upto 6500K, THD<10%, p.f. >0.95, operating range of 140-270V, inbuilt surge protection of 10 kV, Life class of 50,000 Hrs at L70B50 including driver complete with minimum 2 Years warranty as per specification No. FG-ODF/SL. |
| 6 | Item No.03 Plate, Pipe type Earthing (EA-EP) 3.1 Supplying, installing and testing pipe type earthing with 40mm. dia. G.l. pipe or 20 mm dia. G.I. Rod complete with all accessories of GI materials & recording the results as per specification no. EA-EP |
| 7 | Item No.04 C.C. Foundation 4.1 Making M-20 grade reinforced cement concrete foundation by considering the safe soil bearing capacity at site as 10 T/sq.m at 1.5m depth including supply of steel, concrete, excavation and fixing provided nut bolts with the help of template, duly plastered as per design complete (for 6m to 8m high octagonal/conical GI pole). |
| 8 | Item No.05 LT Cables (Aluminum) (CB-LT/AL) 5.1 Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable, 1100 V 4 core 10 sq. mm. aluminium conductor complete erected with glands & lugs on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL |
| 9 | Item No.06 Cable Enclosures (CB-CE) 6.1 Supplying and laying (including excavation of suitable width & depth up to 90 cm) 50 mm outside dia. double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, complete. |
| 10 | Item No.07 Bunch of Wires (WG-MA/BW) 7.1 Supplying & erecting mains with 3x2.5 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/bus bars or any other places as per specification no. WG-MA/BW |
| 11 | Item No.08 Credit for Dismantled Material 8.1 PVC armoured/unarmoured cables and wires (Aluminium) |
| 12 | 8.2 H.G. / M.S. / G.I. Materials / Poles etc. |
| 13 | 8.3 Street/flood light fittings. Please Enable Macros to View BoQ information |