| 1 | Excavation in trenches not exc 1.50 m wide and not exc 1.50 m deep for foundation, laying of pipe or for shafts, wells cesspits,man holes etc not exc 10 Sqm on plan and n exc 1.5m in depth and getting out in hard and dense soil complete all as specified and as directed. |
| 2 | Returning, filling, in including spreading, levelling, watering and well ramming in layers n.exc. 25cm thick complete all as specified and as directed. |
| 3 | Removing excavated soil to distance not exc. 50 m and depositing where directed at a level not exc. 1.5 m above the starting point etc complete all as specified and as directed. |
| 4 | Taking up 200mm bore GI/CI/DI water main including all fittings with any type of joint from trenches complete all as specified and as directed.Note for item No 4 to 6: Excavation and earth work will be measured and paid separately. |
| 5 | Taking up 150mm bore GI/CI/DI water main including all fittings with any type of joint from trenches complete all as specified and as directed. |
| 6 | Taking up 100mm bore GI/CI/DI water main including all fittings with any type of joint from trenches complete all as specified and as directed. |
| 7 | Supplying & laying of GI tubing 150 mm bore, ISI Marked conforming to IS1239 Part-I 2004, medium grade with all fittings, laid in trenches or floor complete all as specified and as directed. |
| 8 | Supplying & laying of GI tubing 100 mm bore, ISI Marked conforming to IS1239 Part-I 2004, medium grade with all fittings, laid in trenches or floor complete all as specified and as directed. |
| 9 | Relaying old serviceable 150mm bore GI pipes and connections as obtained from taking down including provision of new fittings, in new or old position laid in trenches after cleaning by suitable chemical complete all as specified and as directed. |
| 10 | Relaying old serviceable 100mm bore GI pipes and connections as obtained from taking down including provision of new fittings, in new or old position laid in trenches after cleaning by suitable chemical complete all as specified and as directed. |
| 11 | Cutting existing CI/GI/DI pipe line by necessary tools without damaging the existing pipe lines as required upto 150 mm dia for insertion of new tees, branches, etc complete all as directed. |
| 12 | S&F in repair for threaded GI flange of dia 100mm with rubber gasket,nuts and bolts, washer and welding, threading if required, complete all as directed. |
| 13 | S&F in repairs of threaded GI flange of dia 150mm with rubber gasket,nuts and bolts, washer and welding, threading if required, complete all as directed. |
| 14 | S&F in repairs of 100mm bore CI Double Orifice Kenectic Air Valve, Rubber Float, IS:14845, ISI marked,type DK, flanged end with necessary connection, complete all as directed. Please Enable Macros to View BoQ information |
| 15 | S&F in repairs of 100mm bore CI Double Orifice Kenectic Air Valve, Rubber Float, IS:14845, ISI marked,type DK, flanged end with necessary connection, complete all as directed. Please Enable Macros to View BoQ information |