| 1 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). (S.I. No. 692) |
| 2 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50M. and lead upto 30M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. S.I. No. 251 (a) |
| 3 | Plain Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (M-15) |
| 4 | Reinforced Cement Concrete in Super Structure complete as per Drawing and Technical Specifications. (RCC Grade M30) |
| 5 | Providing and laying Cement concrete Wearing Coat M-30 grade excluding reinforcement complete as per drawing and as per Technical Specifications No. 2702 |
| 6 | Supplying, fitting and placing HYSD bar reinforcement in Super-structure complete as per drawing and technical specifications |
| 7 | Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight as per Technical Specifications No. 2605 (14.18) |
| 8 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M. distance as directed by the Engineer incharge. (1.0 Km cartage) |
| 9 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 10 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 11 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. |
| 12 | Providing and applying tack coat with bitumen using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 13 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using Viscocity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity not less than 120 tonnes/hour, laying and rolling with a smooth wheeled roller, finished to required level and grades. |
| 14 | Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 200 tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade. |
| 15 | Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. |
| 16 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications |
| 17 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification |
| 18 | Supply and fixing of 1000mm dia NP-3 hume pipe Please Enable Macros to View BoQ information |