Tender For Construction Of A Gabion Structure For Retaining Earth On The Downhill Side Of Assam Type Building Nos. 1 And 2 At The Temporary Colony, Tato-Ii H.E. Project, Tato, Shi-Yomi District, Arunachal Pradesh
Name of Work:- Construction of a gabion structure for retaining earth on the downhill side of Assam Type Building Nos. 1 and 2 at the temporary colony, Tato-II H.E. Project, Tato, Shi-Yomi District, Arunachal Pradesh
Sl. No.
Item Description
1
Items
2
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)(i) Ordinary soil.(A)Manual Means (Depth upto 3 m)
3
Dry rubble Flooring / Stone Soling.
4
Gabian Structure for Retaining Earth (Providing and construction of a gabain structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire)
5
Carriage for Hill Roads: Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle /Surki/ Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip
6
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
7
Cost of Haulage Excluding Loading and Unloading on hill roads . Haulage of materials by tipper excluding cost of loading, unloading and stacking.i) Surfaced Road Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.