| 1 | Demolition of brick or stone masonry built in cement mortar including all quions, arches, pillars and angle iron fixed at top etc complete all as specified and directed. |
| 2 | Demolition of cement Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. |
| 3 | Demolition reinforced cement Concrete of any description and in any position complete all as specified and directed. |
| 4 | Dismantling of Bricks (laid flat or on edge) or brick tiles in floors, channels, kerbs, aprons, etc. (each layer) laid in Cement mortar complete all as specified and directed. |
| 5 | M&L for Brickwork with fly ash bricks, straight or curved on plan exc 6m mean radius built in cement mortar 1:6 complete all as specified and directed. |
| 6 | M&L for PCC 1:2:4 type B-2 using 20mm graded aggregate as in surface channel and drains complete all as specified and directed. |
| 7 | Material and labour for cement concrete type B-1, 1:2:4 (20mm graded stone aggregate) as in cills, steps; seismic , parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs ,water troughs and the like including weathering, slightly rounded or chamfered angles and throating and the like including necessary form work finished fair and even surface without using extra cement complete all as specified and directed. |
| 8 | M&L TMT bars 10mm dia and over, cut to length, bent to shape required including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. |
| 9 | Material and Labour for TMT bar 6 to 8mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping ,for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. |
| 10 | Material and labour for pre cast reinforced cement concrete drain cover M-25 Design Mix set in CM 1:4 complete including necessary formwork all as specified and as directed. Note : Design Mix shall be as per approved Design Mix of GE/CWE/CE's running contracts. |
| 11 | M & L for Bricks, sub class B, laid flat, in drains, old size bricks bedded and jointed in cement mortar in 1:6 and pointed in cement mortar 1:3 complete all as specified and as directed. |
| 12 | All as item No. 11 above, but except bricks complete all as specified and directed. Notes :- Serviceable bricks obtained from dismantling shall be reused |
| 13 | M & L for Bricks, sub class B, laid on edge in drains, old size bricks bedded and jointed in cement mortar in 1:6 and pointed in cement mortar 1:3 complete all as specified and directed. |
| 14 | All as per above item 13 here in before but except bricks complete all as specified and directed. Notes :- Serviceable bricks obtained from dismantling shall be reused |
| 15 | Taking down cement plaster on brick or stone masonry walls incl racking out joints hacking for key scrubbing down with water etc complete all as specified and directed. |
| 16 | M & L for rendering 15 mm thick on concrete surfaces in cement mortar (1:4) finished even and fair without using extra cement for surfaces of area Drain complete all as specified and as directed. |
| 17 | M&L for preparation of newly plastered surfaces & applying three coat of white wash on walls complete all as specified and directed. |
| 18 | Material and Labour for raking out loose brick work joints as in top horizontal surfaces of brick drain laid on edge and flush pointed in cement mortar 1:3 complete all as specified and directed. |
| 19 | Material and Labour for raking out loose brick work joints as in top horizontal surfaces of brick drain laid on edge and flush pointed in cement mortar 1:3 complete all as specified and directed. |
| 20 | Surface excavation n.exc 30 cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified and directed. |
| 21 | NOTES :-1. The amount of schedule of credit shall be deducted from the total of this BOQ for arriving at contract sum. Please Enable Macros to View BoQ information |