| 1 | Annexure-A (LABOUR CHARGES) |
| 2 | Repairing of damage light & Fan wiring. |
| 3 | Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual. |
| 4 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. |
| 5 | Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual. |
| 6 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8(1 cement:4 graded stone20 mm niminal size: 8 coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, levelling as per RESPO cnstruction manual |
| 7 | Muffing of poles size 0.45x0.60 cm radius with 1:3:6(1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement, stone and sand etc. |
| 8 | Painting of SP-55 pole with angle and channel and all steel part by one coat of Red Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level. |
| 9 | Laying of LT service Cable (Overhead) alongwith supporting GI wire. |
| 10 | Digging of trench of size 0.60x0.15 x1.5 mtr. and laying of underground 11 KV XLPE cable with making of brick housing and filling of sand including filling of earth with ramming. & repairing of road including cost of cement sand and stone blast. |
| 11 | Jointing and fixing of cable jointing kit indoor/outdoor 11 KV XLPE heat shrinkable cable boxes |
| 12 | Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km) |
| 13 | Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 21-50 Km) |
| 14 | Headload cartage of SP-55 Pole from road to site (distance 0-1 Km) |
| 15 | Headload cartage of small material(distance 0-1 Km) |
| 16 | Cartage of 11 KV XLPE Cable, 0-20 Km. |
| 17 | Installation of MCCB with Box on the Angle frame including grouting of Angle with plinth upto the height of 20cm and connection of cable with MCCB including supply of Lugs,Tapes and other required materials. |
| 18 | Installation of ACB LT Distribution Box |
| 19 | Dismantling of Fencing by Gas Cutter. |
| 20 | Making of Trench cover with 40x40x5 mm angle frame, 10 mm ironbars inside for strengthning at 90-100 mm apart, also in crossing with cement concrete ratio 1:2:4, providing both side handles for lifting. |
| 21 | Cartage & head load cartage of of MCCB Etc. |
| 22 | Earthing of MCCB by earth rod |
| 23 | Laying of 11 KV XLPE Cable & Control Cable |
| 24 | Painting work on pale fencing after removing the rust by sand/emery paper then applying two coats of industrial paint (green). |
| 25 | Laying of 11 KV Cable. |
| 26 | Laying and Connecting of PVC insulated wire of size 1.5 to 10 sqmm including end termination using thimbles of suitable size as per side requirement. |
| 27 | Painting of Isolator. |
| 28 | Painting of 33 KV CT Structure. |
| 29 | Painting of 33 KV PT Structure. |
| 30 | Painting of Bus Gantry. |
| 31 | Replacement of silica gel of breather with container. |
| 32 | 33 KV Breaker Overhauling & Setting |
| 33 | Filling mixture of earth and sludge or manure in the desired proportion in trenches, flooding with water and leveling (cost of supplying earth andsludge or manure and mixing excluded). |
| 34 | Earth filling under floor and in sub-station area including cost of earth. Earth to be obtained from outside the corporation area in cluding its cartage and ramming, watering, dressing in 20 cm's thick layers including cost of earth with all lead and lift etc. |
| 35 | Supply of Gravel & spreading in switch yard area with 20mm nominal size in required thickness as directed by Engineer-In-Charge. |
| 36 | Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. |
| 37 | Cleaning, Dressing & labling of Switch yard & carry out from yard to out side all complete as per direction of Engineer-in-charge. |
| 38 | Brick Work With Common Burnt Clap Bricks With Cement Mortar 1:4 |
| 39 | Cement Plaster Work all complete as per direction of Engineer-in-charge. |
| 40 | Reinforcement For RCC Work including Straightening, Cutting, Bending, Placing in Position and Binding all complete. (I) Reinforcement For RCC work using Cold Twisted Bars as per direction of Engineer-in-charge. |
| 41 | Charges of Plinth of Power T/F 2x2x1.5 Mtr as per direction of Engineer-in-charge. |
| 42 | Repairing of Control Cable Trench as per direction of Engineer-in-charge. |
| 43 | Brick work 1:6 super structure as per direction of Engineer-in-charge. |
| 44 | Cement Plaster on side walls on DTR Plinths in 1:4 ratio as per direction of Engineer-in-charge. |
| 45 | Mounting and Fixing of Lightning arrestor set (3 Nos.) on double pole structure including making all connections by G.I. strip size 35x6 mm to earth point complete work (excluding cost of G.I.Strip) |
| 46 | Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Panther as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and sagging chart. |
| 47 | Cartage of the 33/11 CT/PT/Isolator from store center to construction site with loading and unloading at both points.(Distance 21-50 Km) |
| 48 | Dismantling of cable stand, neutral stand including fabrication cutting and welding works at 33/11 KV Sub Station. |
| 49 | Dismantalling of Power T/F 5/8 MVA at transformer plinth & dismantling of all accessories i.e. radiators, conservator tank, vent pipe etc., with the help of special type of T&P / crane etc. fitting cable etc. and draning of T/F oil from radiator and conservator filling in drums. |
| 50 | Erection of (8,5) MVA T/F at transformer plinth & erection of all accessories i.e. radiators, conservator tank, vent pipee etc., with the help of special type of T&P / crane etc. fitting cable etc. and refilling the fresh oil in radiator and conservator. |
| 51 | Erection of cable stand neutral stand including fabrication cutting and welding work. |
| 52 | Grouting of structure in CC 1:3:6 in size (2x1.1x0.3x0.3) mtr . |
| 53 | Erection charges of structure as per direction of Engineer-in-charge. |
| 54 | Earthing of T/F LA & Body with 2 nos MS Earth Rod GI strip and Earth Wire separate. |
| 55 | Final Testing of Cable, Panel and other Accessories before Energizing as per direction of Engineer-in-charge. |
| 56 | Headload Cartage of 33 KV Bus Isolator. |
| 57 | Making of T/F base : Fabrication of MS Channel Angle iron etc. in required sizes with dirlling of holes upto good finish of Top channel, Bracing and special type bracket etc. as per RESPO schedule and local approved drawing. |
| 58 | Erection of GI Earth Strip 50x6 Mm. including disconnection Link. |
| 59 | Replacement of 11 KV Disc Fitting as per direction of Engineer-in-charge. |
| 60 | Installation / Fixing of 33 KV Isolator on structure at 33 KV switchyard with proper alignment & Connections with busbar complete. |
| 61 | Charges of making of Trench Cover as per direction of Engineer-in-charge. |
| 62 | Laying, Spreading and Stringing Control Cable with making all connections. |
| 63 | Installation of C-Wedge Connector of Busbar (Jumps / Taps Panther to Panther) |
| 64 | Filling of Fresh oil in Power T/F as per direction of Engineer-in-charge. |
| 65 | Complete wiring of Breaker by providing Ferule etc. as per direction of Engineer-in-charge. |
| 66 | Annexure-B (SUPPLY ITEMS) (As per UPCL Specifications) |
| 67 | Supply of 70 Watt LED with all Accessories. |
| 68 | Supply of Jointing Kit for 3x400Sq.MM 11 KV XLPE Cable I/D-D |
| 69 | Supply of Cable Copper 1x4 Sq.MM |
| 70 | Supply of 11 KV XLPE Cable Box x400 Sq.MM (O/D)-D |
| 71 | Supply of MCB 1Ph 63 Amp. |
| 72 | Supply of MCCB Box with LT D/B for 250 A |
| 73 | Supply of Aluminium Lug different size. |
| 74 | Supply of SILICA GEL |
| 75 | Supply of Fire Extinguisher |
| 76 | Supply of Ace Chemrod DIA60MM length 3000MM. |
| 77 | Supply of Fluid Compound for Chemical Earthing Rod. |
| 78 | Supply of Nut & Bolt off size. |
| 79 | Supply of PT Clamp for Panther Conductor |
| 80 | Supply of 33 KV Isolator Conn. Clamp for Panther with N/B. |
| 81 | Supply of 33 KV CT Clamp for Panther Conductor with N/B. |
| 82 | Supply of PG Clamp for ACSR Panther to ACSR Dog. |
| 83 | Supply of PG Clamp for Panther. |
| 84 | Supply of GI Strip 50x6 MM. |
| 85 | Supply of connector suitable Panther for VC Please Enable Macros to View BoQ information |