| 1 | Design, Drawing, Construction, Testing and Commissioning of RCC Step type Intake for WTP (0.558 MLD) with suitable pile foundation, having 3 nos. of landing of size (2 x 2)m, 3 nos. of flight of 3m with necessary mechanical & electrical works including connecting walkway cum pipe carrying girder from Intake to river bund and construction of pump house with suitable pump foundation for 2 nos. of pumpset in brickwall with column, lintel and ramp including providing ,fixing trusses, frames with CGI roofing sheet of superior quality, doors, windows, electrification and its accessories complete with and finishing the same with good quality of paint. i/c manually operated travelling crane with girder for lifting the pumps for Mutum Phibou at Imphal River. |
| 2 | Design, Drawing and Construction of Impounding Raw Water Storage Pond (3417.00 m2 of 3 m depth at the lowest) |
| 3 | Providing, Laying and Jointing of DI K7 pipe 100 mm diameter (3000 Rm) and 150 mm diameter (2500 Rm) in Thongkhong Laxmi Bazar including trench excavation, lowering, laying, jointing, testing of pipes, refilling of trench, gate valves with chambers, necessary anchor blocks etc. and road restoration of excavated trenches complete as per S.S and as directed by the Engineer-in-charge etc. |
| 4 | Providing, Laying and Jointing of medium GI pipe 80 mm diameter (700 Rm) in Thongkhong Laxmi Bazar including trench excavation, lowering, laying, jointing, testing of pipes, refilling of trench, gate valves with chambers, necessary anchor blocks etc. and road restoration of excavated trenches complete as per S.S and as directed by the Engineer-in-charge etc. |
| 5 | Design, Drawing, Energisation, Procurement and Installation of suitable Transformer for Thongkhong Laxmi bazar zonal (For pumping requirement for 0.1 ML Reservoir) including erection and stringing of necessary HT & LT lines for providing power supply of adequate capacity to operate pumping machineries for the Scheme/Intake/Zonal Station, including internal and external lighting, testing with submission of all test reports, civil foundation, earthing, cabling, and allied accessories, with necessary tying up with the Electricity Department for all technical and mandatory requirements/formalities for installation and energisation of transformers and HT/LT lines, complete as per detailed specifications and direction of Engineer-in-Charge. The Transformer shall be designed and manufactured conforming to Energy Efficiency Level–2 at basic insulation level as per IS:2026 (Part I & II) with latest amendments and IS:1180 (Part I–2014) with latest amendments, fitted with On-Load Tap Changer (OCTC), initial filling of oil conforming to IS:335–1993, and all necessary fittings and protection devices. |
| 6 | Providing, Transportation, Installation, Erection & stringing of necessary LT line on 9.0 Mtr Supports (Distance of 700 Rm approx.) for power supply having capacity enough to operate the pumping machineries at Lamdeng Intake, including internal and external lighting at Lamdeng WTP as well, testing etc. all complete. |
| 7 | Design, Drawing and Construction of R.C.C. Clear Water Underground Reservoir of capacity 0.20 ML with R.C.C. slab roofing, including inlet, outlet, overflow and scour pipe connections with all necessary specials and fittings, provision of manholes with covers, air vents, internal access arrangements, installation of disinfection dosing unit and suitable water level indicator, smooth finishing of all surfaces, curing, satisfactory water-tightness test, and all allied civil, mechanical and electrical works, complete at Zonal Station Thongkhong Laxmi Bazar as per approved design and direction of Engineer-in-Charge. |
| 8 | Design, Drawing and Construction of Pump House having plinth area 6.00m X 4.50m with suitable pump foundations for 2 (two) pump sets, brick masonry walls with R.C.C. columns, lintel and ramp, providing and fixing of steel trusses and frames with superior quality CGI roofing sheets, doors and windows, complete internal and external electrification with necessary fittings and accessories, finishing with good quality paint on steel and wall surfaces, and all allied civil, mechanical and electrical works, complete at Zonal Station Thongkhong Laxmi Bazar.Treatment Site as per approved design and direction of Engineer-in-Charge. |
| 9 | Design, Drawing and Construction of angle iron fencing (300 Rm) with 1.8 meters high GI barbed wire fencing with 2.4 m angle iron posts 50mm x 50mm x 6mm placed every 3 meters center to center founded in M15 grade cement concrete, 0.6 meter below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete with steel gate of 2 shutter of length 1.80m and height 1.80m with necessary mechanical fittings complete around the Zonal Station Thongkhong Laxmi Bazar. |
| 10 | Supply, Delivery, Installation, Testing and Commissioning of Horizontal Split Casing Centrifugal Pump sets (Worthington/Mather Platt/Kirloskar make) having Individual discharge of against total driving head pipe arrangement pipes, valves, dismantling joints, gates accessories and cost of jointing materials, etc complete as per detailed specifications as directed by the Engineer-in-charge. |
| 11 | Providing, Laying and Jointing of Internal Pipe Fittings at Thongkjong Laxmi Bazar WSS and Zonal Station Thongkhong Laxmi Bazar wherever necessary with DI K9 pipe of 100mmdia and 150mm diameter including trench excavation, lowering, laying, jointing, testing of pipes, refilling of trench, gate valves with chambers, necessary anchor blocks etc. and restoration of excavated trenches complete as per S.S and as directed by the Engineer-in-charge etc. |
| 12 | Operation and Maintenance for a period of 5 years aftercommission of the project on turnkey basis:Operation and Maintenance of all infrastructures created under the above works, including pumping machinery, transformers, HT/LT lines, civil structures, reservoirs, treatment units, distribution and pumping mains, electrical and mechanical installations, valves, instruments and accessories, for a period of 5 (five) years after commissioning of the project, on turnkey basis, including deployment of required manpower, routine maintenance, preventive and corrective repairs, supply of consumables, chemicals, lubricants, record keeping, submission of O&M reports, and necessary coordination with the Electricity Department and other statutory authorities for uninterrupted operation and compliance, complete as per specifications and direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |