| 1 | Design, Drawing and Construction of Pre- settling tank (pond) of capacity 3778.66 cum at Yairipok (U) |
| 2 | Supply & installation of Pump sets (Worthington/Mather Platt/ Kirloskar make) 15 HP- 3 (Three)nos. YAIRIPOK (U) |
| 3 | Providing , laying and jointing of DI distribution network with K7-class conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, anchor block,laying of DI fittings (specials)/CI fittings (specials) mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning complete as per S.S and as directed by the Engineer-in-charge etc:(a) DI 150 mm dia = 2650.00 m(b) DI 100 mm dia = 2210.00 m |
| 4 | Providing and laying of GI Distribution Pipes conforming to IS 1239/Pt(I)/2004 (with latest amendment) screwed at both ends as per IS:554/1985,socket at one end and the protected with plastic thread protector, socket conforming to IS:1239(Pt-II/1992-fourth revision)with amendment no 1 in random length of 4 to 7 m specification including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works and pipe crossing bridge, anchor block,laying of DI fittings (specials)/CI fittings (specials) mechanical type and suitable DI valves as per relevant IS Code. Design, drawing and construction of pipe crossing steel truss bridges across rivers, nallah, etc. and chambers for Air Valve, Scour Valve and Sluice Valve including testing of pipe joints, fittings, valves, and disinfection of all pipes, trial run and commissioning complete as per S.S and as directed by the Engineer-in-charge etc:(a) GI 65 mm dia =7364.00 m |
| 5 | Operation and Maintenance of the Scheme for a period of 5 years after commission of the project on turnkey basis:Operation and Maintenance of all infrastructures constructed and improved under the work, including pumping machinery, transformers, HT/LT lines, civil structures, reservoirs, treatment units, distribution and feeder mains, clear water mains, electrical and mechanical installations, valves, specials, instruments and accessories, for a period of 5 (five) years after commissioning of the project, on turnkey basis, complete as per approved design, specifications and direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |