|
| 1 | Dismantling Brick / stone masonry in Cement mortarwalls under 3m high |
| 2 | Brick work in 1:6 (one cement six crushed stone sand) Cement Mortar using best quality country Brick of size 8 3/4\\" x 4 1/4\\" x 2 3/4\\" with class designation of 7.5 including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. |
| 3 | In First Floor |
| 4 | Cement Concrete 1:5:10 (One cement, Five Crushed Stone Sand (M-Sand) and Ten hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. |
| 5 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M-Sand) and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 6 | Plastering with Cement Mortar 1:5 (One cement and Five P-Sand), 12mm thick in all floors including mortar plasticizer at 100ml per 50 kg of cement use curing etc. complete complying with standard specification and as directed by thedepartmental officers. |
| 7 | Paving the floor with best quality vitrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 8 | Painting two coats of New plastered wall surface with ready mixed plastic Interior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 9 | Hire charges for supplying and fixng of weld mesh Door using 35 x 35 x 6 angle for outer frame with 25 x 5 mm flats stiffeners and weld mesh for shutters Middle support provided at required intervals and aditional hinge lockers etc., for maximum 35days |
| 10 | Double Leaf |
| 11 | Hire charge for Providng weld mesh partition arragements using weld mesh 7.5 x 2.5cm 10 Gauge with outer frames and M.S sngles of size 15 x 15 x5mm for the outer frames stiffeners with 32 x 6mm M.S flat is provided at 90 cm intervals for counting hall partition and wayparition etc., including cost of nails screws binding wire and labour charges etc., and removing the same after counting is over for maximum 35 days |
| 12 | Hire charges for supplying and fixing of plywood of 6 mm thick for closing the windows, ventilator in storage rooms including cost of nails, screws and labour charges etc., and removing the same after counting is over for maximum 35 days |
| 13 | Hire charges for providing steel Barricading arrangements of 1.20m height using 40mm x 40mm MS square pipe of 20cm centre to centre interval etc. place shown by the departmental officers for maximum 35 days |
| 14 | Hire Charges for Providing Arabian Tent including all labours charge and conveyance charge and removing the same after counting is over etc, for maximaum 35 days |
| 15 | Hire charges For providing Red carpet over platform in counting hall Inculding cost of fixing labours loading unloading charges etc., for maximum 35 days |
| 16 | Hire charges for watch tower arrangements of size 3mx3m x 20ft. Height. Including cost of fixing, labours, loading unloading charges etc. for maximum 25 days |
| 17 | Name board using flex with plywood by using hollow foam sheet of size 60cm x 30cm |
| 18 | Hire chares for supplying and fixing of plastic chairs of 1370 nos per dayfor six constituency and outer side of counting centre inculding loading unloading labour charges and coneyance charges etc., |
| 19 | Hire charges for postal vote rack box in counting hall including cost of fixing, labours,loading unloading charges etc., Complete |
| 20 | Hire charges for Country wood rack using 19mm thick ply wood with country wood scantling for storage the Ballot unit, VVPAT and control unit etc., complete. |
| 21 | Hire Charges for Providing Tin Sheet arrangements with necessary stay. Including cost of nails, screws, and labour charges etc., and removing the same after counting is over |
| 22 | For 6 days |
| 23 | For 35 days |
| 24 | Hire Charges for Providing Side view cutter arrangements with necessary stay. Including cost of nails, screws, and labour charges etc., and removing the same after counting is over |
| 25 | For 4 days |
| 26 | For 35 days |
| 27 | Hire Charges for Providing Postal bullet arrangements with necessary paste with true alingment including cost of nalis screws and labour charges etc., and removing the same after counting is over |
| 28 | Hire charges for providing ABC powder type fire Extinguisher 6.00kg capacity including cost of fixing labour loading unloading charges etc.,complete |
| 29 | Hire charges for providing carbon-di-oxide gas type fire Extinguisher 4.50kg capacity including cost of fixing labour loading unloading charges etc.,complete |
| 30 | GST Please Enable Macros to View BoQ information |