| 1 | Rewinding of ceiling fan motor (starting and running winding) including all necessary material. The motor is to be wound taking no. of coils, turns and pitch as it was originally wound with required size super enamelled wire with 'E' class insulation material and making connections etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. (New model ceiling fan)900/1200 mm sweep (New model ceiling fan) |
| 2 | 1400 mm sweep (New model ceiling fan) |
| 3 | All sizes (Old model ceiling fan) |
| 4 | Labour charges for removing and refixing of Ceiling fan/ Exaust fan from site |
| 5 | Charges for oiling, overhauling of ceiling fan, table fan, pedestal fan irrespect to the size of fan including removing,refixing of fan from site and testing etc. as required.Fans w/o Removing & Refixing |
| 6 | Fans with Removing & Refixing at Suitable Location |
| 7 | Providing and Replacement of ball bearing of ceiling/ exhaust fan and refixing the same at suitable location as requiredand as per OEM recommendations. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 8 | Provinding & Replacement of M.S. Shaft of ceiling fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 9 | P & Replacement of cover/ bearing seat of ceiling/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 10 | P & F Aluminium Blades (a set of 3 blades) duly painted and well finished 900/ 1200 mm. The material of the fan blade shall be of designation 31500B with condition HX6 aluminium alloy sheet confirming to IS 737/2008 |
| 11 | P & F Aluminium Blades (a set of 3 blades) duly painted/ powder coated. ( 1400/ 1500 mm) The material of the fan blade shall be of designation 31500B with condition HX6 aluminium alloy sheet confirming to IS 737/2008 |
| 12 | P & F of rubber gromet (fan insulator) |
| 13 | Providing and Replacement of Gun metal bush of ceiling/exhaust/cooler fan/ as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 14 | P & F 3 Speed rotary switch for Desert Cooler complete with testing etc as required. |
| 15 | P & Replacement of M.S. Shaft of fan motor for Desert Cooler/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 16 | P & replacement of supporting legs(4 no.) of vertical pump of desert cooler as required for Desert Cooler/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 17 | P & F of stud with nuts and washer for Desert Cooler/ exhaust fan.All the scrap material should be retained by the contractor. |
| 18 | Servicing and overhauling of 20\\" sweep desert cooler including oiling, greasing, painting of tank from inside with rubber paint after properly desmantling each assembly and refixing the same as required. |
| 19 | Painting of desert cooler with two coats of rubber paint inside of water tank and two coat of synthetic enamelled paint on both side of cooler body, fan body, grills etc.after cleaning with sand paper, complete in all respect as required. |
| 20 | Replacement of cooler pads (heavy) set of 3 no. of size 25\\" x 27\\" |
| 21 | P & F Brass float valve of weighing approx. 250 gm, 8\\" long rod,PVC ball of 4\\" dia. For desert coler as required. |
| 22 | P & F adjustable M.S.grill 20/22 gauge of size approx. 24\\" x 26\\" including painting etc. as required. |
| 23 | P & F aluminiun blade for 20'' desert cooler fan as required. |
| 24 | P & F outer/inner threaded PVC nipple 1/2\\" dia and 2\\" long |
| 25 | P & Replacement of pvc pipe of 1/2\\" size for vertical pump of desert cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 26 | P & replacement of shaft for vertical pump of desert cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 27 | Spray painting of ceiling fan of size 900/1200/ 1400/ 1500 mm with two coats of white/ brown enamelled paint after cleaning with sand paper. Filling etc. as required. |
| 28 | P & replacement of 4 nos. supporting legs of 20'' fan motor with rubber pads of desert cooler as required.Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor |
| 29 | P & replacement of high quality pvc distribution ' T 'and 3 no. elbow for cooler |
| 30 | P & F ISI marked commercial plywood 4.0 mm thick including cutting, hardwares etc. as required. |
| 31 | Labour Charges for fixing of desert cooler in windows including handling of cooler upto desired location, making electrical/water connections, testing etc. as required. Ground floor |
| 32 | First floor |
| 33 | Second floor |
| 34 | P & F of ISI marked vertical pump suitable for 20\\" desert cooler including making connection testing etc. as required. ISI marked vertical pump |
| 35 | P & F of submercible pump set suitable for 18/24 \\"Desert coolers. |
| 36 | P & F of submercible pump set suitable for 36 \\"Desert coolers. |
| 37 | P & F fan motor suitable for 20\\" desert cooler including making connection testing etc. as required.with copper winding Motor ISI Marked |
| 38 | with Aluminium winding Motor ISI Marked |
| 39 | Rewinding of Heavy duty Exhaust fan motor including all necessary material,The motor is to be wound taking no. of coils,turns and pitch as it was originally wound with required size super enamelled wire with 'E' class insulation material and making connections etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.300/ 380 mm sweep |
| 40 | 450 mm sweep |
| 41 | 600 mm sweep |
| 42 | Rewinding of 400 mm table fan/pedestal fan motor including all necessary material,The motor is to be wound taking no. of coils,turns and pitch as it was originally wound with required size super enamelled wire with 'E' class insulation material and making connections etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 43 | Rewinding of single phase motor of 1400 RPM including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 0.25 H.P. To 0.50 H.P. |
| 44 | 0.75 H.P. To 1.0 H.P. |
| 45 | 2.0 H.P. |
| 46 | Rewinding of three phase squirrel cage induction motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.3.0 H.P. |
| 47 | 5.0 H.P. |
| 48 | 7.5 H.P. |
| 49 | 10.0 H.P. |
| 50 | 12.5 H.P. |
| 51 | 15.0 H.P. |
| 52 | Rewinding of motor of desert cooler pump with super enamelled copper wire, 'E ' class insulation material including removing,refixing,testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 53 | Rewinding of motor of desert cooler fan with super enamelled copper wire, 'E ' class insulation material including removing,refixing,testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 54 | Providing and replacement of heating element of blower type heat convector as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 55 | Providing and replacement of heating element rod of radiation type heat convector as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor |
| 56 | Providing and replacement of Superior quality Chrome plated reflector of radiation type heat convector as required.Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.single rod |
| 57 | double rod |
| 58 | Supplying and charging of fresh refrigerant and testing of performance of air conditioner/ fridge/ water cooler of following capacity including capillary and strainer/ filter.1.0 TR Window/ Split A.C. |
| 59 | 1.5 TR Window/ Split A.C. |
| 60 | 2.0 TR Window/ Split A.C. |
| 61 | 25/50 / 40/80 Ltr. Water cooler |
| 62 | 60/120 Ltr. Water cooler |
| 63 | 150/150 Ltr. Water cooler |
| 64 | 165 Ltr Refrigerator |
| 65 | 200/210 Ltr Refrigerator |
| 66 | 280/310 Ltr Refrigerator |
| 67 | Replacement of defective compressor by company repaired compressor as per OEM recommendations of following gadgets including testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.1.0 TR A.C. |
| 68 | 1.5 TR Window/ Split A.C. |
| 69 | 2.0 TR Window/ Split A.C. |
| 70 | 25/50 / 40/80 Ltr. Water cooler |
| 71 | 60/120 Ltr. Water cooler |
| 72 | 150/150 Ltr. Water cooler |
| 73 | 165 Ltr Refrigerator |
| 74 | 200/210 Ltr Refrigerator |
| 75 | 280/310 Ltr Refrigerator |
| 76 | P & Replacement of condensing/ cooling coil of copper fins for following capacity A.C./ Water cooler/ Fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.1.0 TR A.C. |
| 77 | 1.5 TR Window/ Split A.C. |
| 78 | 2.0 TR Window/ Split A.C. |
| 79 | 25/50 / 40/80 Ltr. Water cooler |
| 80 | 60/120 Ltr. Water cooler |
| 81 | 150/150 Ltr. Water cooler |
| 82 | 165 Ltr Refrigerator |
| 83 | 200/210 Ltr Refrigerator |
| 84 | 280/310 Ltr Refrigerator |
| 85 | Servicing of 1.0/1.5/2.0 TR capacity Split/ Window type air conditioner |
| 86 | P & Replacement of overload protection of A.C./ Water cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 87 | P & Replacement of thermostat of A.C./ Water cooler/fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 88 | P & Replacement of selector switch of 1.0/1.5/2.0 TR A.C Fan as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 89 | P & Replacement of starting relay of A.C/water cooler/fridge compressor as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 90 | P & Replacement of fan motor of evaporator/ condensor complete as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 91 | S & F of capacitor of 230V/ 275V, 50Hz rating of plastic casing and terminals -Lugs or copper wire.Starting capacitor 20-30 micro farad |
| 92 | 40-60 micro farad |
| 93 | 60-80 micro farad |
| 94 | 80-100 micro farad |
| 95 | 100-120 micro farad |
| 96 | 120-150 micro farad |
| 97 | S & F of capacitor of 230V/ 275V, 50Hz rating of plastic casing and terminals -Lugs or copper wire.Running capacitor 2.5/3.15 micro farad |
| 98 | 4.0 micro farad |
| 99 | 6.0 micro farad |
| 100 | 8.0 micro farad |
| 101 | 10.0 micro farad |
| 102 | 15.0 micro farad |
| 103 | 20.0 micro farad |
| 104 | 25.0 micro farad |
| 105 | P & Replacement of plastic/metallic sheet condensor holder suitable for ceiling fan/ exhaust fan /motor etc complete as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 106 | Rewinding of single phase/3phase submersible motor including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.0.5 H.P. To 1.0 H.P. |
| 107 | 2.0 H.P.to 3.0 HP |
| 108 | Above 3.0 HP to 5.0 HP |
| 109 | From7. 5 HP to 10.0 HP |
| 110 | Repairing of submersible pump of with replacement of broken impellers ,diffuser,bush/bearing set , oil seal complete with testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.0.5 H.P. To 1.0 H.P. |
| 111 | 2.0 H.P.to 3.0 HP |
| 112 | Above 3.0 HP to 5.0 HP |
| 113 | From7. 5 HP to 10.0 HP |
| 114 | Labour charges for installation of submersible motor pump set including lowering/ delowering of pipes, cables, accessories etc. in tube-well/ open well complete including T&P, transportation of tripod, chain pulley block & any other material required for this purpose complete in all respect.Delowering and Lowering |
| 115 | P/Laying ISI marked P.V.C. insulated submersible cable confirming to(IS:694) and as per IS 8130 : 2013 of 1.1 kV grade . Wire should be made from 99.90 % purity copper, stranding in acc. to IS:8130/IEC 60228 for lower watt loss , oxygen free for less chances of oxidization, insulation PVC type A/C/D , flame retardant as per IS 10810-53, better amperage rating as per IS:3961 part 5, existing pipe / open trench / Cable tray / on surface including making connection etc. as required. For additional technical parameters of product / work refer Annexure 'A' attached with this BSR 6.0 Sq.mm 3 core flat / Round |
| 116 | 10.0 Sq.mm 3 core flat / Round Please Enable Macros to View BoQ information |