| 1 | Scope under this BoQ is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signifies this fact only. |
| 2 | Schedule 'A' PART - I : This scope under this schedule is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signifies this fact only. |
| 3 | Design & Construction of New Buildings for three multi-storeyed buildings of Stilt + 6 Upper floors accommodating total of 33 Maj & above/ Type-V quarters with stilt parking and terrace tanks of 1x25,000 Litre + 1x20,000 Litre mounted on terrace, Three Single storeyed Bunglows for Maj Gen & Above including servant quarter, One Single storeyed Bunglow for Type-VI Accn including servant quarter, Officers Mess along with 3 Nos Single in-living Officers Accn, Garages for 13 cars, UG sump of 1.00 Lakh Litre capacity, Sub-station including attendant room & toilet, Pump house including duty room & toilet, Sentry post with rest room- 05 Nos, Security wall, retaining wall, compound wall, retaining cum compound wall, gates complete all as specified and as per approved drawings including internal & external B/R & E/M Services, Furniture complete as detailed in scope of work and other documents of the tender etc including Comprehensive Maintenance of entire assets and Installations for 24 months during Defect Liability Period complete all as specified. |
| 4 | Schedule \\"A\\" Part - II: |
| 5 | (a) Comprehensive maintenance of lifts for 36 months after expiry of Defect Libility Period, Manning & Operation of lifts for 60 months after completion of Phase-I of work and Manning & Operation of electrical installations & STP for 24 months after completion of Phase-I of work. |
| 6 | Outsourcing of services for operation of the following Electrically operated Lifts installed in 3 buildings by deploying 2 operators (Semi skilled) in general shift of 8 hours per day + 01 rescue operator (Semi skilled) during night shift of 08 hours complete during 1st year of Defect Liability Period:(i) 01 lift of 8 passenger (544 kg) capacity & 01 lift of 13 passenger (884 kg) capacity each in three buildings consisting Stilt + 6 upper floors (Total 6 lifts) |
| 7 | All as per Item No. 2 herein before but during 2nd year of Defect Liability Period. |
| 8 | All as per Item No. 2 herein before but during 1st year after expiry of Defect Liability Period. |
| 9 | All as per Item No. 2 herein before but during 2nd year after expiry of Defect Liability Period. |
| 10 | All as per Item No. 2 herein before but during 3rd year after expiry of Defect Liability Period. |
| 11 | Comprehensive maintenance including periodical maintenance of the following electrically operated passengers lifts during 1st year after Defect Liability Period as per OEM recommendation, repairs/ rectification of defects including renewal/ replacement of all defective parts through respective OEM of the lifts complete all as specified and as directed:(i) 01 lift of 8 passenger (544 kg) capacity & 01 lift of 13 passenger (884 kg) capacity each in three buildings consisting Stilt + 6 upper floors (Total 6 lifts) |
| 12 | All as per Item No. 7 herein before but during 2nd year after expiry of Defect Liability Period. |
| 13 | All as per Item No. 7 herein before but during 3rd year after expiry of Defect Liability Period. |
| 14 | (b) Manning & Operation of STP during Defect Liabity Period |
| 15 | Outsourcing of services for operation of 35 KLD capacity STP installed under the subject work, by deploying one skilled FGM + one un skilled helper in each shift with two shifts of 8 hours each per day complete during 1st year of Defect Liability Period complete including dozing of consumable chemicals/items, monitoring of all mechanical & electrical equipment, analyzing the treated water sample once in a month all as directed. |
| 16 | All as per Item No. 10 herein before but during 2nd year of Defect Liability Period. |
| 17 | (c) Manning & Operation of E/M Installations |
| 18 | Outsourcing of services for Manning & Operation of E/M installations viz. two pole structure, substations, Transformers/ LT Panels, Power factor panels, GODs, Drop out fuse units, DG Set and Operation of security light with directed timing and attending petty repairs of minor EM nature complaints of complex round the clock including Sundays and holidays in three shifts of 8 hours each by engaging One Skilled Electrician & One Unskilled Helper in each shift of 08 hrs duration for three shifts daily (i.e. 0600 to 1400 Hrs, 1400 to 2200 Hrs & 2200 to 0600 Hrs) complete during 1st year of Defect Liability Period all as directed. |
| 19 | All as per Item No. 12 herein before but during 2nd year of Defect Liability Period. |
| 20 | (d) Manning & Operation of Pump house and water supply installations |
| 21 | Outsourcing of services for Manning & Operation of Pump house and water distribution network including Sundays and holidays in two shifts of 8 hours each by engaging One Skilled FGM & One Semi skilled valveman in each shift of 08 hrs duration for two shifts daily (i.e. 0600 to 1400 Hrs & 1400 to 2200 Hrs) complete during 1st year of Defect Liability Period all as directed. |
| 22 | All as per Item No. 14 herein before but during 2nd year of Defect Liability Period. |
| 23 | Deduct: Amount of Schedule of Credit b/f from Sl. Page No. 110 of tender document i.e. Rs. 1,02,00,000.00 Please Enable Macros to View BoQ information |