| 1 | Total amount of Sch 'A' Sec-I ( BUILDING WORKS ) Lump sum price worked out by the contractor for \\" BUILDING WORKS \\" as listed in schedule 'A' Part-I |
| 2 | Total amount of Sch 'A' Sec-II (SITE CLEARANCE, SITE DEVELOPEMENT & MISC. EARTH WORKS) Lump sum price worked out by the contractor for \\" SITE CLEARANCE, SITE DEVELOPEMENT & MISC. EARTH WORKS \\" as listed in schedule 'A' Part-II |
| 3 | Total amount of Sch 'A' Sec-III (INTERNAL ELECTRIFICATION WORKS) Lump sum price worked out by the contractor for \\"INTERNAL ELECTRIFICATION WORKS \\" as listed in schedule 'A' Part-III |
| 4 | Total amount of Sch 'A' Sec-IV (SEWAGE DISPOSAL WORKS ) Lump sum price worked out by the contractor for \\" SEWAGE DISPOSAL WORKS \\" as listed in schedule 'A' Part-IV |
| 5 | Total amount of Sch 'A' Sec-V (PATH WITH CHEQUERED CEMENT CONCRETE TILES ) Lump sum price worked out by the contractor for \\" PATH WITH CHEQUERED CEMENT CONCRETE TILES \\" as listed in schedule 'A' Part-V |
| 6 | Total amount of Sch 'A' Sec-VI ( AREA DRAINAGE WORKS ) Lump sum price worked out by the contractor for \\"AREA DRAINAGE WORKS \\" as listed in schedule 'A' Part-VI |
| 7 | Total amount of Sch 'A' Sec-VII (PROTECTIVE WORKS ) Lump sum price worked out by the contractor for \\"PROTECTIVE WORKS \\" as listed in schedule 'A' Part-VII |
| 8 | Total amount of Sch 'A' Sec-VIII (EXTERNAL WATER SUPPLY WORKS ) Lump sum price worked out by the contractor for \\"EXTERNAL WATER SUPPLY WORKS \\" as listed in schedule 'A' Part-VIII |
| 9 | Total amount of Sch 'A' Sec-IX (DEMOLITION / DISMANTLING WORKS) Lump sum price worked out by the contractor for \\" DEMOLITION / DISMANTLING WORKS \\" as listed in schedule 'A' Part-IX |
| 10 | Total amount of Sch 'A' Sec-X (OPEN SHED WORKS) Lump sum price worked out by the contractor for \\" OPEN SHED WORKS \\" as listed in schedule 'A' Part-XI |
| 11 | Total amount of Sch 'A' Sec-XI (INTERNAL WATER SUPPLY WORKS ) Lump sum price worked out by the contractor for \\"INTERNAL WATER SUPPLY WORKS \\" as listed in schedule 'A' Part-XI |
| 12 | Total amount of Sch 'A' Sec-XII (EXTERNAL ELECTRIC SUPPLY WORKS & LIGHTNING PROTECTION) Lump sum price worked out by the contractor for \\"EXTERNAL ELECTRIC SUPPLY WORKS & LIGHTNING PROTECTION \\" as listed in schedule 'A' Part-XII |
| 13 | Schedule 'A'Section-XIV (Misc Items of Works) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as \\"Rs 0.00\\" under Col. 6 siginifies this fact only. |
| 14 | S & F LED bulb 12 Watt, 230 volts AC 50 Hz Retrofit B22 base complete all as specified and directed by Engr-in-Charge. |
| 15 | Supply, Installing, testing and commissioning of LT distribution panel floor mounted outdoor type panel board of over all dimension suitable as per requirement fabricated with 3.15 mm thick CRCA sheet on PCC plinth, totelly enclosed type dust vermin proof, back side open able fixed with hinged shutter and from side open-able with hinged shutter and locking arrangement for individual MCCBs/MCBs powder coated finished both internally and externally suitable for 415Volt AC 50 Hz 3 Phase 4 wire system by menas of aluminium bus bar of 200 Amps Capacity (Main bus bar) and suitable size of Loop Bus bar with coloured insulating tape/sleeves mounted on porcelain or synthetic insulators with provision for fixing MCCBs/MCBs necessary inter equipments & accessories including PCC foundation of 0.5 mtrs height complete as as specified and as directed (AT Kalidhar Line)(i) Incommer MCCB 4 Pole, 415V, 100 A 25KA(ii) Outhgoing MCB SPN, 240V 63V, 10KAQ (for duty post)(iii) Outgoing MCB SPN, 240V 32V, 10KAQ (for toilet)(iv) Digital ammeter -01 Nos(v) digital volt meter-01 Nos(vi) Selector Switch for Amp/Volt Meter-02 Nos(vii) Current Transfer(CT) of ratio 100/5-01 Set(viii) Phase indicator lamp (RYB) set of three-01 Nos |
| 16 | S & F of double walled corrugated HDPE duct pipe of 63mm outer dia confirming to IS-14930 (Part-II) of approved colour with fitting for cable protection complete all as specified and directed. |
| 17 | M&L for cutting of existing GI main Distribution Pipe line 50mm dia & insertion of new tee(50x50x40)mm for new connection 40mm at Mandalay Firing Range including all necessary fittings i.e Union, nipple socket & including necessary earth work to complete all specified & directed by Engr-in-Charge.Note:-Near Sainik Aram ghar 2x10000 ltre PVC water tank main inlet pipe |
| 18 | M&L for cutting of existing GI main Distribution Pipe line 50mm dia & insertion of new tee(50x50x25)mm for new connection 25mm at Kalidhar line including all necessary fittings i.e Union, nipple socket & including necessary earth work to complete all specified & directed by Engr-in-Charge. |
| 19 | M&L for cutting of existing GI main Distribution Pipe line 100mm dia & insertion of new tee(100x100x25)mm for new connection 25mm at 5 Recruit Coy, including all necessary fittings i.e Union, nipple socket & including necessary earth work to complete all specified & directed by Engr-in-Charge. |
| 20 | Less Schedule of Credit(Minus) Please Enable Macros to View BoQ information |