| 1 | Dismantaling of R.C.C.Slab , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. |
| 2 | Dismantaling of old Brick work & R.B.Slab, including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. |
| 3 | Earth work in Mar, Ranker & Kankar mixed soil for excavation foundation , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. |
| 4 | C.C. 1 : 3: 6 with Stone Grit (20-40 mm) size including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 5 | C.C. 1 : 2 : 4 with Stone Grit(10-20 mm) size , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. |
| 6 | Brick work in 1:4 cement, mortar, including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 7 | Centering & Shuttering for R.C.C. work , including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 8 | Reinforcement for R.C.C work in slab binding placing in position with G.I wire, including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 9 | R.C.C. 1 : 1.5 : 3 with Stone Grit (10-20 mm) size, including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. |
| 10 | Deep struck Pointing 1:2 Cement, Mortar including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 11 | C.C. 1 : 1.5 : 3 with Stone Grit (10-20 mm) size, including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 12 | Painting of Parapet , including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 13 | Painting letters Up to 08 cm hight anual compaction and dressing ,including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 14 | Earth work in making road bypass in Mar, Ranker and Kanker mixed soil including lead up to 30.0 M. and lift upto 1.50 M. with manual compaction and dressing , including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 15 | Earth work in Removing road bypass in Mar, Ranker and Kanker mixed soil including lead up to 30.0 M. and lift upto 1.50 M. etc , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. |
| 16 | Bolder Pitching with Stone mesonery In 1:4 in internal canal section on proper sub grade i/c all cost of material labour and T&P etc. , including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 17 | Supply of Geo textile (sheet) made of 200 gsm woven multifilament polypropyleneyarn. T&P, labour, all taxes etc complete in all respect |
| 18 | Laying of Geo textile (sheet) made of 200 gsm woven multifilament polypropylene yarn. including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 19 | Fixing of RCC Precast Boundry piller including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. ID SOR item no.13-(II) |
| 20 | Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 160 mm PE 100 pipe PN6, IS-4984 |
| 21 | Laying and fixing in position and aligment including excavation and back filling excluding cost of material. |
| 22 | Earth work in Mar, Rankar & Kankar mixed Soil in filling including lead upto 1.00.Km. and lift upto 1.50m. with manual compaction and dressing etc , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. |
| 23 | Earth work in Mar, Rankar & Kankar mixed Soil in Cutting including lead upto 30.0m. and lift upto 1.50m. , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. |
| 24 | Centering and shuttering for C.C.work. In sleeper, including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. |
| 25 | 50 MM thick moorum sub grade below C.C. lining with all cost of material, including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 26 | Preparering subgrade for C.C. lining, leveling, dressing and compaction with watering complete. ,including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 27 | Supplying / laying LDPE film 200 micron of Ist. Grade , including cost of labour, T&P, etc.,including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 28 | 75 MM thick C.C. 1 : 2 : 4 in lining including laying, ramming and curing laid in alternate pannels, iincluding cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. |
| 29 | Filling 14x27 mm jointing C.C. lining with bitumen sealing compound ,including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |