| 1 | Earth work in Mar, Ranker and Kanker mixed soil in digging or in embankment including lead up to 30.0.0 m and lift upto 1.50 m with manual compaction and dressing. |
| 2 | Earth work in Mar, Rankar and Kankar mixed soil in filling for Strengthening of Bank & Service Road i/c extra for lead up to 195 mtr. |
| 3 | Earth work in Mar, Rankar and Kankar mixed soil in filling for Strengthening of Bank & Service Road i/c extra for lead up to 1.00 Km. |
| 4 | Cutting heavy under growth Bushes upto 7.50cm dia, including removal. |
| 5 | Removal Of thick beshram with uprooting from internal section |
| 6 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar for proper completion of work as per direction of Engineer-in-Charge. |
| 7 | Earth work in Mar Rankar and Kankar mixed soil for excavation foundation i/c all cost of labour materials and T&Pf or proper completion of work as per direction of Engineer-in-Charge. |
| 8 | Laying & spreading of Local sand in foundationfor proper completion of work as per direction of Engineer-in-Charge. |
| 9 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. |
| 10 | Brick work (M-150) with 1:4 cement motar including all cost material labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 11 | Random rubble stone masonry in lime or cement mortar |
| 12 | Struck pointing 1:2 cement mortar including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 13 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 Itr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 14 | Centering & Shuttering for C.C. & R.C.C.work with all lead & lift required for proper completion of work including cost of materials and scafolding labours, T&P, etc. |
| 15 | Reinforcement of steel with cutting bending and binding and palcingin position with i/c all cost of labour materials and T.&P. |
| 16 | R.C.C. 1: 1.5: 3 with stone grit (10-20mm) size i/c all cost of labour and T & P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 17 | Providing and Laying C.C. 1 : 2 : 4 with coarse sand F.M. not less than 2.2 ,stone Grit (20-40 mm) size in Foundation i/c all cost of labour and T&P etc. |
| 18 | Providing and Laying Non Pressure NP-3Pipe (Medium duty) RCC Pipe Including collars/Spigot Jointed with stiff mixture of cement mortar in proportion of 1:2(1cement : 2 Fine sand) including testing of Joint etc complete. 600 MM Dia. RCC Pipe(For Dy.) |
| 19 | Providing and Laying Non Pressure NP-3Pipe (Medium duty) RCC Pipe Including collars/Spigot Jointed with stiff mixture of cement mortar in proportion of 1:2(1cement : 2 Fine sand) including testing of Joint etc complete. 1000 MM Dia. RCC Pipe(For Dy.) |
| 20 | Dewatering by pump. (10hp) I.D. SOR item no 4.2 |
| 21 | Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 110 mm PE 100 pipe PN4, IS-4984 |
| 22 | Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 160 mm PE 100 pipe PN6, IS-4984. |
| 23 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredFabrication and fixing of canal gate shutter including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works etc all complete. |
| 24 | Supply and fixing of canal gate threaded shaft including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge. |
| 25 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade on old rusted steel surface of gatesto give an even shade One or more coats on old work Please Enable Macros to View BoQ information |