|
| 1 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately) |
| 2 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (Manure measured in stacks will be reduced by 8% for payment.) |
| 3 | Supply of Plants |
| 4 | Tecoma gaudichaudi of height 45-60 cm. in earthen pots of size 20 cm |
| 5 | Providing and stacking of Calliandra, emarginata of height 45-60 cm. in earthen pot of size 20 cm as per direction of the officer-in-charge |
| 6 | Nerium oleander (Kaner) of height 45-60 cm. with 3-4 branches in poly bag of size 20 cm |
| 7 | Bougainvillea named variety, Sobhra, Thima, Marry palmar, Cherry Blossom etc. well developed with fresh & healthy bushy plant in full bloom 75 to 90 cm ht. plant in 40 cm Cement Pot |
| 8 | Himelia patens of height 60-75 cm. with 6-8 branches in poly bag of size 25 cm. |
| 9 | Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water).A. Shrubs Plant |
| 10 | Maintenance Green Belt |
| 11 | Complete maintenance of Shrub, jobs like making of basin at regular interval,application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T & P material/articles shall be provided by the contractor) as per direction of officer incharge(RSP)Cost of 1200 Nos53332 x 12 month= 639984 |
| 12 | Providing and wartering of plants through water tanker of Horticulture features i.e. tree, shrubs, hedge/edge, ground cover, Road Side Plantation ,Centrell Verge etc. at the site of work. Water tanker having 5000 lit. capacitywith one labour for watering i/c cost of water, filling of tanker, wartering at site with all leads and lifts as per direction of officer-in-charge. (5000 Ltr. for 1 Trip) |
| 13 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (Manure measured in stacks will be reduced by 8% for payment.) |
| 14 | Tractor with trolley including P.O.L. & Driver GST extra as per aplicable Please Enable Macros to View BoQ information |