| 1 | Excavation in Soil using Hydraulic Excavator CK 90; Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections. Sr. No. 3.6A Morth Sp-301 (All complete as per E/I) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 2 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A)By Manual Means Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 4 | Supply & Fixing 80 mm thick Precast cement concrete 1-Shape interlocking paver block a with top layer of minimum 8mm thickness having pllan dimension 200x(160+120mm) of O.P. cement. Smooth high gloss finish, skid reditant manufactured from rubber moulds through vibro-compression. The compressive strength of concrere pave block shall not be less than 30MPA (M-30) and wight 5kg per no confiming to IS. 15658-2006 with a 4 cm thick layer of fine and including cost of material, labour, T & P TAXES etc. required for proper completion of the work as directed by Engineer-in-charge.(1) Grey Color.(2) Red Color (High Quality Pigment/Lanxess, Bayer Chamicals) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 5 | Construction of 600x600 drain both side Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specifications including premixing the material with water at OMC in mechanical mix (Plant), carriage of mixed material by tipper to site laying in uniform layers With grader in sub-base/base course on well prepared under base and compacting with vibratory-roller to achieve the desired density. as per MoRTH specification no. 406B(4.14) Laying using grader Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 7 | Providing and laying dense graded bituminous macadam grading-2 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (All complete as per E/I) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 8 | Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared granular surfaces treated with primer/Bituminous surface as per Technical Specification Clause 503. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 9 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Including all T&P, Labour, Material, Royalty Tax but excluding GST Please Enable Macros to View BoQ information |