| 1 | SUPPLY OF HIGH LIGHT MAST |
| 2 | Supply of 45Mtr high mast complete set |
| 3 | Supply of Foundation Bolt for 45Mtr Mast |
| 4 | Supply of 500W LED Flood Lights (30 deg) |
| 5 | Supply of 500W LED Flood Lights (15 deg) |
| 6 | Supply of 50mm dia DWC HDPE pipe |
| 7 | Supply of 65mm dia DWC HDPE pipe |
| 8 | Supply of 100mm dia DWC HDPE pipe |
| 9 | Supply of standard LM Feeder pillar |
| 10 | Supply of MLDB (I/C- 125A, O/G- 32&63A) |
| 11 | Supply of End Termination 3.5Cx35 cable |
| 12 | Supply of End Termination 3.5Cx70 cable |
| 13 | Supply of End Termination 3.5Cx120 cable |
| 14 | Supply of End Termination 4Cx6 CABLE |
| 15 | ERECTION & COMMISSIONING |
| 16 | Construction of foundation for 45M Mast |
| 17 | Shifting, Eerct., Test. & Commg 45M Mast |
| 18 | Shift, ETC of 500W LED Flood Light (30d) |
| 19 | Shift, ETC of 500W LED Flood Light (15d) |
| 20 | Shifting & Laying of 50mm dia DWC pipe |
| 21 | Shifting & Laying of 65mm dia DWC pipe |
| 22 | Shifting & Laying of 100mm dia DWC pipe |
| 23 | Cable Trench 750mm deep x 300mm wide |
| 24 | Laying of 1.1KV Cable: 3.5Cx35 |
| 25 | Laying of 1.1KV Cable: 3.5Cx70 |
| 26 | Laying of 1.1KV Cable: 3.5Cx120 |
| 27 | Laying of 1.1KV Cable: 4Cx6 |
| 28 | Shifting ET&C of High Mast Feeder Pillar |
| 29 | Shifting ET&C of MLDBs |
| 30 | Making Cable End Termination: 3.5Cx35 |
| 31 | Making Cable End Termination: 3.5Cx70 |
| 32 | Making Cable End Termination: 3.5Cx120 |
| 33 | Making Cable End Termination: 4Cx6 |
| 34 | Earthing with GI Pipe as per IS 3043 |
| 35 | Earthing with 25x3 GI Flat (incl supply) Please Enable Macros to View BoQ information |