| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 2 | All kinds of soil |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge |
| 4 | All kinds of soil |
| 5 | Providing,supplying, lowering, laying , jointing hydraulic testing and commissioning as per required specification HDPE pipes in standard lengths complete in all respects |
| 6 | 75mm dia HDPE pipes |
| 7 | 90mm dia HDPE pipes |
| 8 | 50mm dia HDPE pipes |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 10 | Making connection of G.I. distribution branch with HDPE main of following sizes by providing and fixing Tee,nipple including cutting and threading the pipe etc. complete |
| 11 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. |
| 12 | 25 mm dia G.I. pipes |
| 13 | 20 mm dia G.I. pipes |
| 14 | Providing and fixing pipe specials including cutting and threading the pipe and making long screws etc. complete (as per non avaliliblity in divisional store) |
| 15 | 20 mm dia GI union |
| 16 | 25 mm dia GI union |
| 17 | 80 mm dia GI union |
| 18 | 65 mm dia GI union |
| 19 | 50 mm dia GI union |
| 20 | Hanging of 90/75mm dia HDPE pipe using 10mm thick steel cable, locking arrangement, Steel pegs etc complete in all respects. (Subjected to actual) |
| 21 | Engagement of vehicle for carriage of departmental material from divisional store to site of work about 65KM avg lead incld loading/unloading/stacking.(subjected to actual) |
| 22 | Providing and fixing C.I. double acting 40mm dia air valve of approved quality with bolts, nuts, rubber insertions, 40mm dia MS/GI pipe (length 1.50m) etc. complete Please Enable Macros to View BoQ information |