|
| 1 | fo|qr forj.k [k.M&[kqtkZ] ds vUrZxr fofHkUu 33@11dsoh fo|qr midsUnzksa ds dk;Z{ks= esa vkdfLed@vkikrdkyhu esa czsdMkmu ds dkj.k {kfrxzLr lkexzh dks cnyus ,oa LFkkfir djus laca/kh dk;ZA |
| 2 | Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 40Kms. |
| 3 | PCC POLE 8.5 Mtr. Long |
| 4 | PCC POLE 9 Mtr. Long |
| 5 | PCC POLE 11 Mtr. Long |
| 6 | S.T/P 11 Mtr long. |
| 7 | Carriage of All line Material from store to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
| 8 | Erection of Single support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 9 | PCC POLE 8.5 Mtr. Long |
| 10 | PCC POLE 9 Mtr. Long |
| 11 | PCC POLE 11 Mtr. Long |
| 12 | S.T/P 11 Mtr long. |
| 13 | Erection of duble pole support including complete fittings & with instulation T/F on D/P including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 14 | PCC POLE 8.5 Mtr. Long |
| 15 | PCC POLE 9 Mtr. Long |
| 16 | PCC POLE 11 Mtr. Long |
| 17 | S.T/P 11 Mtr long. |
| 18 | Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 19 | PCC POLE 8.5 Mtr. Long |
| 20 | PCC POLE 9 Mtr. Long |
| 21 | PCC POLE 11 Mtr. Long |
| 22 | S.T/P 11 Mtr long. |
| 23 | Grouting ofduble pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 24 | PCC POLE 8.5 Mtr. Long |
| 25 | PCC POLE 9 Mtr. Long |
| 26 | PCC POLE 11 Mtr. Long |
| 27 | S.T/P 11 Mtr long. |
| 28 | Carriage of All line Material from j.e store Sub station to pit Site as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
| 29 | Laying, sagging. Stringing and binding and jumpering of ACSR Weasel conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 30 | ACSR Weasel |
| 31 | ABC 3*50 |
| 32 | ABC 3*95 |
| 33 | ABC 3*120 |
| 34 | fixing of Stay rod with Stay wire in proper way with Nozelling. |
| 35 | Grouting of Stay rods . |
| 36 | Resagging of loose and bad sag of L.T./H.T. line. |
| 37 | Chopping of Tree branches.. |
| 38 | Tightening of Stay |
| 39 | Grouting of PCC/STP Pole Old. |
| 40 | Change of broken/Damaged/Missing following Items :- |
| 41 | XLPE CABLE 3X70 & 3X120 sq. mm. |
| 42 | Pin Insulator |
| 43 | Disc Insulator |
| 44 | Bended X-Arm/Angle/Channel |
| 45 | Ailment of PCC/STP Pole |
| 46 | F Clamps |
| 47 | Stay Insulator |
| 48 | Making of Plinth of the Damaged/Broken STP of the welded 03 Nos. Angle Iron piece with the Pole. |
| 49 | Dismantling of ST/PCc Poles. |
| 50 | Removal of ST/PCc Poles. |
| 51 | The folloing material is required to be supplied by the contractor. |
| 52 | Stay insulator. |
| 53 | F bracket |
| 54 | L T Insulators |
| 55 | L T Clamps. |
| 56 | X Arm Holding clamp. |
| 57 | F Clamps. |
| 58 | Bolt & nut off size. Please Enable Macros to View BoQ information |