| 1 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out soft/loose soil all as specified and as directed. |
| 2 | Excavation in trenches, not exceeding 1.5m wide and not exceeding 1.5m depth for foundation, etc., and getting out in soft/loose soil all as specified and as directed. |
| 3 | Material and Labour for Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick with soils all as specified and as directed. |
| 4 | Removing excavated soils not exceeding 1.5km but not exceeding 5km and depositing all as specified and as directed. |
| 5 | Material and Labour for Sand filling under floors or in foundations including watering and consolidation all as specified and as directed. |
| 6 | Material and Labour for Plain Cement Concrete Type D2, 1:4:8 mix (using 40 mm graded granite stone aggregate) in foundations, filling and mass concrete all as specified and as directed. |
| 7 | Material and Labour for Plain Cement Concrete Type C2, 1:3:6 mix (using 40 mm graded granite stone aggregate) in foundations, filling and mass concrete all as specified and as directed. |
| 8 | Material and Labour for providing Cement Concrete type B2, 1:2:4 mix using 40mm graded stone aggregate as in foundations, filling and mass concrete /coping complete all as specified and directed by Engineer-in -charge. |
| 9 | Material and labour for Second class hard-wood 40mm clean sawn with butt joint all as specified and as directed. |
| 10 | Material and Labour for preparation of new wood surface of any description, not otherwise described, over 10cm width or girth applying two coats of synthetic enamel paint over a coat of pink primer complete all as specified and directed. |
| 11 | Supply and Fixing of Mild steel tubular pipes, angles, Flats or chequered plates in framed work such horizontal, vertical and chinup bars etc, with end of bars shouldered or riveted or forged in to spikes including welding as necessary and similar work confirming to Fe-290Gde E-165 complete all as specified and directed. |
| 12 | Material and Labour for two coats of synthetic enamel paint over a coat of red oxide primer over steel surfaces including preparation of new surface complete all as specified. |
| 13 | Form work to sides of concrete for Footings, Foundations and base of columns, raft or etc vertical or to batter all as specified and as directed. |
| 14 | Supply and Fixing of Mild steel screw bolts (machine made) with hexagonal or square heads at one end and screwed the other, or screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut, exceeding 5cm but not exceeding10 cm long all as specified and as directed. |
| 15 | Supply and Fixing of 1200 mm diameter concertina coil (razor security coil) shall be of expanded outside diameter approximately 1200 mm and manufactured from high tensile galvanized steel (GI) having a diameter of 2.5 mm to 3.0 mm, uniformly galvanized or stainless as per grade requirement. The razor blade tape shall be manufactured from galvanized steel strip of thickness 0.50 mm to 0.60 mm (or up to 0.70 mm where specified), machine-pressed and securely crimped onto the core wire. The blade profile shall be of approved type such as BTO-10, BTO-22, CBT-60 or equivalent, with sharp barbs of uniform spacing to ensure effective deterrence and high security performance. Suitable clips shall be used for connecting the loops at attachment points. Alternate pairs of coil loops are joined around the circumference creating the concertina effect. Coil loops shall not be linked. Each coil shall be properly coiled and firmly tied before fixing. Stretch the coils and allow them to rotate naturally around their central axis. Allowing the coil to rotate will ensure that there is no mechanical stress within the obstacle before lying. Locate the coil loops uniformly at the specified coil spacing. |
| 16 | Supply and Fixing of Nylon rope of 50mm dia all as specified and as directed. |
| 17 | Supply and Fixing of Manila rope of 50mm dia all as specified and as directed Please Enable Macros to View BoQ information |