| 1 | Name of dept.Water Resources Department, Punjab Division: Barnala Canal and Groundwater Division,Barnala Name of the work: Estimate for Laying Underground Pipeline of outlet RD 19485-R of Handiaya Minor Name of Firm Sr.No Description Unit Qty. Rate (in figures) Rate (in Words) |
| 2 | Excavation by mechanical Means(jcb or hydraulic excavator) in trenches for pipelines with straight or open cutting in streets or open area including dressing sides levelling of bed of trenches to correct grade, cutting joints holes, refilling consolidation including the cost of diversion for traffic crossing over trenches for access to the houses, watching fencing etc and removal of surplus soil out side/inside the town involving lead upto 15 mtr complete in all respects |
| 3 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. |
| 4 | First class brick masonary 229 mm thick laid in cement sand mortar 1:6 in foundation and plinth including supply recarriage of bricks cement . |
| 5 | 10mm thick cement plaster 1:4 on sides walls |
| 6 | 10mm thick cement plaster 1:4 on bed and top. |
| 7 | Reinforced cement concrete 1:2:4 hand mixed |
| 8 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle(mechanical mixing) |
| 9 | Cement concrete 1:4:8 with stone ballast 40mm gauge by Mechanicaly means |
| 10 | Lowering, jointing of RCC NP-2 plain end pipes 350 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. (committee labour rate) |
| 11 | jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No) (committee labour rate) |
| 12 | Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cementconcrete 1:2:4 |
| 13 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) |
| 14 | Centreing &shuttering for Concerte faces |
| 15 | Providing & Fixing of Steel Shutter Gate Assembly in Main Pipeline complete in all respect |
| 16 | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete |
| 17 | Any Other Item |