| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto 1000m lead including cost of all labour, machinery etc complete as per Technical Specifications and Clause - 201 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 2 | Excavation for road work in soil with hydraulic excavator including cutting, trimming bottom & side slopes and transporting to the embankment locations upto 1000m lead with cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause - 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 3 | Loosening, leveling and Compacting original ground to facilitate placement of first layer of embankment, scarified to a depth of 150mm, compacted at OMC to achieve minimum dry density conforming to Table 300-2 with cost of all labour, machinery etc complete as per Technical Specifications and Clause - 305.3.4 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 4 | Sand filling in Road work & foundation of structure including cost, conveyance, royality of sand & cost of all labour etc complete as as per approved Drawing & Technical Specifications and Section - 2100 & Clause -304 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 5 | Providing compacted granular materials in shoulder by using moorum having required P.I. value with sand admixture if required, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause - 401 & 408 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 6 | Providing GSB Gr-vi materials, spreading in uniform layers with motor grader, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause - 401 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 7 | Providing, laying, spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the material at OMC in mechanical mix plant, carriage of mixed material to site, laying in uniform layers on well prepared surface & compacting to achieve the desired density including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -406 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 8 | Providing Primer Coat with bitumen emulsion on prepared granular surface, spreading @ 0.60kg / sqm using mechanical means including cost, conveyance of of bitumen emulsion & cost of all labour, machinery etc complete as & cost of all labour, machinery etc complete as per Technical Specifications and Clause -501 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 9 | Providing Tack coat with bitumen emulsion on prepared bituminous surface, spreading @ 0.20kg / sqm using mechanical means including cost, conveyance of bitumen emulsion & cost of all labour, machinery etc complete as per Technical Specifications and Clause -501 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 10 | Providing Bituminous Macadam of grading -2 using crushed stone Gr.-2 materials & 60/70 penetration grade of bitumen, preparing preemixed materials with hot mix plant, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per clauses 501 and 504 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 11 | Providing & laying Semi Dence Bituminous Concrete of grading -2 using crushed stone Gr.-2 materials & 60/70 penetration grade of bitumen, preparing preemixed materials with hot mix plant, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per clauses 501, 503 and 508 of MoRT&H Specifications for Road & Bridge works (4th Revision). |
| 12 | Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in Table 500-29, prepared by using mastic cooker and laid to required level and slope after cooking the surface,including providing anti-skid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10 sqm and an approximate spacing of 10 cm center to center in both directio, pressed into surface when the temperature of surfaces is not less than 100° C ,protruding 1 mm to 4 mm over mastic surface including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per Clause 516 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 13 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes as per Technical Specifications and Section- 800, 1600 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision). Please Enable Macros to View BoQ information |