In The Works Approved Under The Business Plan 2024-25 (Part-1 And Part-2) Under The Electricity Urban Distribution Division, Bulandshahr, Due To The Non-Availability Of 11 Meter Long Stp Poles In The Storage Center, The Pending Work Was Completed By Procu, Bulandshahr-Uttar Pradesh
TDR : 54851789
Tender Notice
BOQ
5 Days Left
Bulandshahr
Uttar Pradesh
In The Works Approved Under The Business Plan 2024-25 (Part-1 And Part-2) Under The Electricity Urban Distribution Division, Bulandshahr, Due To The Non-Availability Of 11 Meter Long Stp Poles In The Storage Center, The Pending Work Was Completed By Procu
Safe carriage of 11 mtr long pcc pole from store center to site store with loading & unloading at both ends respectively distance within-0 to 50 Kms.
4
Erection of single pole PCC Pole 11 mtr long as per RESPO
5
Erection of double pole PCC Pole 11 mtr long as per RESPO
6
Excavation of For Each and grouting of PCC Pole 11 MTR as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Stone Ballast, Stone Pad etc. as per actual site requirement Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.