| 1 | Earthwork in foundation in hard soil or gravelly soil within 50m intial lead and 1.50m intial lift including dressing and bracking clods to maximum 5 cm to 7 cm and laying in layers not exxceeding 0.30m in depth and as per direction of EIC. |
| 2 | Filling in foundation and plinth with sand watered and rammed as per OPWD specification including all cost of materials, labour,conveyance,royality,cess,Tools and plants etc. all complete. |
| 3 | Cement concrete (1:3:6) with 40mm size crusher broken hard granite metal including all cost of materials,labour,conveyance,royality,cess T&P water for curing etc. all complete. |
| 4 | Fly ash bricks 25cmx12cmx8cm size having crushing strength not less than 75kg/cm2 in cement mortar (1:6) in foundation and plinth including cost of materials, labour, royality, conveyance, Tools and plants, water for curing etc. all complete. |
| 5 | Fly ash bricks 25cmx12cmx8cm size having crushing strength not less than 75kg/cm2 in cement mortar (1:6) in super structure including cost of materials, labour, royality, conveyance, Tools and plants, water for curing etc. all complete. |
| 6 | 12mm thick cement plaster (1:4) for brick work |
| 7 | 6mm thick cement plaster (1:4) finishe smooth |
| 8 | Priming one coat with wall cement primer water bound on plaster surface. |
| 9 | Finishing wall with water proofing weather coat paint of approved make including cost of caffolding staging charges with cost of all materials taxes,labour T&P etc. complete. |
| 10 | Cement concrete work of M20 grade with 20mm and down grade crusher broken hard granite chips including hoisting and laying all cost of materials,labour,conveyance,royality,cess,Tools & plants water for curing etc. all complete |
| 11 | Requirement of HYSD/MS rod & labour for cutting,binding,straghting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 guage etc. complete. |
| 12 | Rigid and smooth centring and shuttering for CC/RCC works in foundation, plinth band and footing bases of columns mass concrete pre-cast slabs etc including false work and dismentalling then after casting including cost of materials,cess complete in ground floor. |
| 13 | Fixing vertified tiles in floor treads or step and landing on 25mm thick bed of cement mortar (1:1) joined with pigments to match the shade wall. |
| 14 | Fixing vertified tiles in dados skriting and risers of steps on 12mm thick bed of cement mortar (1:1) joined with near cement slurry mixed with pigments to match the shade wall. |
| 15 | Cost of primer, paint, painting & letter writing over display board (paid as per actual observation) Please Enable Macros to View BoQ information |