| 1 | Cremation Ground - Earthwork excavation in hard soil within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge. |
| 2 | Fiilling in foundation & plinth with sand, incl. watering & ramming as per direction of Engr.-in-charge. |
| 3 | C.C (1:3:6) with 40mm CBHG metal incl. const, Conveyance & Royality of materials (unit-1 cum) |
| 4 | RCC work of M-20 grade with 20mm and down graded CBHG chips incl. hoisting and laying incl cost, Conveyance & Royalty of Materials (Unit-1 cum) |
| 5 | 2.5cm artificial stone flooring with cement concrete (1:2:4) including punning using 12 mm size hand broken granites chips. |
| 6 | 2.5cm thick grading concrete (1:2:2) on roofslab with 6mm size CBHG chips on NEW work incl. cost, Conveyance & Royalty of Materials of all materials (Unit-1 sqm) |
| 7 | 12mm thick cement plaster in CM(1:6) over brick work (Unit-1 sqm) |
| 8 | Priming 1 coat with any approved primer incl. cost of primer & labour all complete (Unit-1sqm) |
| 9 | Wall painting 1 coat with plastic emulsion paint of approved shade on old work to give an even shade including cost of labour & paint etc.(Unit-1 sqm) |
| 10 | Rest Shed - Earth work in excavation of foundation in ordinary soil within 50 mtr initial leasad 1.5 mtr intial life including rough dressing and braking clods to macimum 5cm to 7 cm and laying in layers not exceeding 0.30 mtr depths and as per direction E.I.C. |
| 11 | Supply and filling in foundation and plinth with river sand, in layers including water with cost, coneyance royalities and taxes of all materials cost of all labour carriage of water sundries T & P required for the work etc all complete as per the specification & direction of E -I -C |
| 12 | C.C (1:3:6) with 40mm CBHG metal incl. const, Conveyance & Royality of materials (unit-1 cum) |
| 13 | RCC work of M-20 grade with 20mm and down graded CBHG chips incl. hoisting and laying incl cost, Conveyance & Royalty of Materials (Unit-1 cum) |
| 14 | 12mm thick cement plaster in CM(1:6) over brick work with cement punning for skirting long side(Unit-1 sqm) |
| 15 | Labour and Materials for fixing G.C.I. Sheet in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. excluding cost of fitting (Unit-1 sqm) |
| 16 | Iron works arought and put up at trusess and purlin including fabrication abd all cost M.S. Pipe 4\\", 3\\",2\\" Square bar etc. all complete |
| 17 | Drilling screws 600 to 12mm dia at iron Flats, angles,tees, etc of 6mm to 10mm Thick with hard dri (Labour only)/ per each. |