| 1 | Dismantaling of BOE soiling/Old interlocking work including stocking of materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) etc all complete |
| 2 | Dismantaling brick work or stone work in lime or cement mortar and including stocking of materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) etc all complete Ch-175R-2, (692) |
| 3 | Sale of material to contractor old brick etc all complete Ch-1 (1a) |
| 4 | Sale of material to contractor brick bats etc all complete Ch-1(2c) |
| 5 | Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet). Ch-17 (697) |
| 6 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m, as per directed by engineer-in-charge:2.1.1 all kind soil |
| 7 | Earth work in excavation in by mechanical means (hydraulic excavator) trenches for foundation pipe cable etc in o ordinary soil (Loan clay or sand)including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m. Ch-4.2.8.1 |
| 8 | Laying of base concrete 1:6:12 with cement C.Sand & 40mm Brick ballast including mat.Lab.T&P,etc all complete.) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors. |
| 9 | Brick work with common burnt clay (non modular) bricks of brick 150 in foundation and plinth in 1:4 cement & coarse sand mortar in supply of all materials, labour and tools and plants etc. required for proper completion of the work. Etc all complete.Ch-6,6.1.1 |
| 10 | 12 mm cement plaster of mix 1:4 (1 cement :4 fine sand) including material all complete. |
| 11 | Reinforced cement concrete work 1:1.5:3 in walls (any thickness), including attached pilaters, butteres, plinth and string courses fillets, colums (1 cement : 1.5 coarse sand :3 graded stone aggregate 20mm nominal size) centering shuttering including material all complete. |
| 12 | Steel reinforcement for R.C.C. work including straighting, cutting, bending, placing in position and binding all complete up to plinth level,ch-5,SR-20,5.22.6 |
| 13 | construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface complete as per mort&h etc all complete |
| 14 | Providing & Laying of Rubber moulded interlocking Concrete Block with 80mm thick ICBP(75% Gray & 25% Red/Yellow coloured) having strength not less than 30KN/m2 complete as per Technical Specification Clause 1500. |
| 15 | Relaying of old interlocking tile incleding material all complete. |
| 16 | cartage of earth upto 3km including loading and unloading incl mat all complete. |
| 17 | S/F of sign board with padestal inci mat all com. |
| 18 | TAX18% Please Enable Macros to View BoQ information |