|
| 1 | SW: Providing and laying of GI pipe line from GREF well to power house at Campbell Bay. |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 3 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 5 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc.External work : |
| 7 | 100mm dia nominal bore |
| 8 | 80 mm dia nominal bore |
| 9 | 65 mm dia. nominal bore |
| 10 | 50 mm dia. nominal bore |
| 11 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : |
| 12 | 100 mm nominal bore |
| 13 | 80 mm nominal bore |
| 14 | 65 mm nominal bore |
| 15 | 50 mm nominal bore |
| 16 | Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (New work) : |
| 17 | 100 mm nominal bore |
| 18 | 80 mm nominal bore |
| 19 | 65 mm nominal bore |
| 20 | 50mm nominal bore |
| 21 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete : |
| 22 | 50mm to 100mm nominal bore |
| 23 | SW: Construction of RCC surface tank with capacity of 20000 Ltrs At Campbell Bay Power House. |
| 24 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift up to 1.5 m, as directed by Engineer-in-Charge: |
| 25 | All kinds of soil |
| 26 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 27 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 28 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 29 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). |
| 30 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 31 | Foundations, footings, bases of columns, etc. for mass concrete |
| 32 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 33 | Suspended floors, roofs, landings, balconies and access platform |
| 34 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 35 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 36 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. |
| 37 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 38 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 39 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 40 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : |
| 41 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 42 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). |
| 43 | 12 mm cement plaster of mix : |
| 44 | 1:4 (1 cement: 4 fine sand) |
| 45 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. |
| 46 | 40 mm thick with 20 mm nominal size stone aggregate |
| 47 | Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineer-in-Charge. |
| 48 | Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI- 212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. |
| 49 | For vertical surface two coats @ 0.70 kg per sqm |
| 50 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 51 | New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) Please Enable Macros to View BoQ information |