| Sl. No. | Item Description |
| 1 | Supply |
| 2 | 33 kV Underground Cable Conversion (3C×400 sqmm XLPE) |
| 3 | Engineering, drawing & supply of 33 kV Underground Cable Conversion (3C×400 sqmm XLPE) work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 4 | 3C × 400 sqmm, 33 kV XLPE Cable (Armoured), Aluminium, A2XFY |
| 5 | Heat-shrinkable jointing kit for 3C×400 mm² 33 kV XLPE Cable (outdoor type) |
| 6 | Heat-shrinkable jointing kit for 3C×400 mm² 33 kV XLPE Cable (straight type) |
| 7 | HDPE Pipe, 200 mm dia, PE80-PN8, 10 m lengths |
| 8 | Route and joint indicating stones |
| 9 | GI Pipe 200 mm dia, 6 mm thick, ISI marked, with sockets & sealing (as per TSECL/IS specifications) |
| 10 | 40 mm nominal bore GI pipe (medium gauge) earthing device, 3 m long |
| 11 | 7/10 SWG GI stay wire, Grade-2 |
| 12 | HDPE Pipe, 20 mm size |
| 13 | Aluminium cable sockets, 95 mm² |
| 14 | Engineering, drawing & supply of 33/11 kV Power Transformer — 16 MVA (with accessories & oil) in replacement work As per IS standard , Approved Technical Specification & drawings. |
| 15 | Supply of 33/11 kV Power Transformer — 16 MVA (with accessories & oil) |
| 16 | Engineering, drawing & supply of 33/11 kV Substation Control Room Building Augmentation in replacement work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 17 | Comprehensive refrbishment of 33/11 KV Substation control room building - civil repairs, electrical renovation, plumbing, IT/comms reainess, testing, commissioning & handover Complete turnkey basis |
| 18 | 33/11 kv GIS Substaion |
| 19 | Engineering, drawing & supply of New 33/11 Kv GIS Substation as per TS & approved Drawing. |
| 20 | 33/11 kV GIS Substation with 33kV side :2 Nos incomer, 2 Nos Trafo, 1 Nos Bus coupler, 1 Nos Bus Riser & 11 KV side : 8 No outgoing, 3 Nos bus section, 2 Nos Bus coupler & 3 Nos incomer |
| 21 | New 132/33 kv GIS Substaion |
| 22 | Engineering, drawing & supply of new 132/33 kv GIS Substation with all accessories as per scope of work, approved drawings and technical specifications |
| 23 | 132/33 kV GIS Substation — complete indoor GIS switchgear bay (132 kV side): 4 bays incl. 2 line bays + 2 transformer bay + 1 bus coupler bay |
| 24 | 132/33 kV Power Transformer — 50 MVA, ONAN/ONAF, complete with accessories, oil, marshalling box, Buchholz, WTI/OTI, PRD |
| 25 | 33 kV GIS Switchgear panel — 12 bays (2 incomer + 1 bus coupler + 6 outgoing feeders + 2 bus PT) |
| 26 | Protection, metering & control panels (132 kV + 33 kV) — numerical relays, disturbance recorder, event logger, SAS per IEC 61850 |
| 27 | Station auxiliary system — 2 × 100 kVA 33/0.433 kV aux transformers, LTAC panel, DB, UPS, battery bank (110V DC + 48V DC), DG set 125 kVA |
| 28 | Earthing system — copper bonded earth rods, earth mat (25×6 Cu strip), risers, test links, touch/step potential compliant |
| 29 | SCADA/RTU integration — RTU panel, IEC 61850 gateway, managed switches, OFC termination, NMS integration |
| 30 | CCTV (16 ch IP), fire detection & suppression, access control, perimeter security, street lighting |
| 31 | 132 kV line bay outdoor termination / cable sealing end (if cable entry) or gantry + bus arrangement (if OH entry) |
| 32 | Testing, commissioning, documentation, training & warranty support |
| 33 | Engineering, drawing & supply of new 33/11 kv GIS Substation (E House Pre Fabricated) with all accessories as per scope of work, approved drawings and technical specifications |
| 34 | SITC of complete 33/11 kV Prefabricated E-House Substation (turnkey) — 2 nos. 33 kV SF6 Incomer Panels, 1 no. Bus Coupler, 6 nos. 11 kV VCB Outgoing Feeder Panels, Bus Ducts, Aux Transformer, PLC/RTU Panel, MCC/APFC, Containerized Structure, HVAC, Fire Detection (VESDA), CCTV, earthing, civil foundation, FAT/SAT, commissioning. IEC 62271/IS 13118 compliant. |
| 35 | Engineering, drawing & supply of New 33/11 kv GIS Substation (Shifting of Existing Rampur Sub Staion ) with all accessories as per scope of work, approved drawings and technical specifications |
| 36 | SITC of complete 33/11 kV — 2 nos. 33 kV SF6 Incomer Panels, 1 no. Bus Coupler, 6 nos. 11 kV VCB Outgoing Feeder Panels, Bus Ducts, Aux Transformer, PLC/RTU Panel, MCC/APFC, Containerized Structure, HVAC, Fire Detection (VESDA), CCTV, earthing, civil foundation, FAT/SAT, commissioning. IEC 62271/IS 13118 compliant. |
| 37 | 11 kV NETWORK AUGMENTATION (UG CABLE) |
| 38 | Engineering, drawing & supply of 11 kV Underground Cable Conversion (3C×300 sqmm XLPE) work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 39 | 3C × 300 sqmm, 11 kV XLPE Cable (Armoured), Aluminium, A2XFY |
| 40 | Heat-shrinkable jointing kit for 3C×300 mm² 11 kV XLPE Cable (outdoor type) |
| 41 | Heat-shrinkable jointing kit for 3C×300 mm² 11 kV XLPE Cable (Straight type) |
| 42 | HDPE Pipe, 200 mm dia, PE80-PN8 |
| 43 | Route and joint indicating stones |
| 44 | GI Pipe 100 mm dia, Heavy Class, Plain End |
| 45 | 40 mm nominal bore GI pipe (medium gauge) earthing device, 3 m long |
| 46 | 7/10 SWG GI stay wire, Grade-2 |
| 47 | HDPE Pipe, 20 mm size |
| 48 | Aluminium cable sockets, 95 mm² |
| 49 | Engineering, drawing & supply of 11 kV Smart Ring Main Units (SCADA Compatible) work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 50 | 11 kV SF6 Outdoor Smart RMU — 3-way (1 VCB + 2 LBS), motorized, SCADA compatible, with FPI, FRTU, 1 kVA Aux Transformer, DCPS, MPLS Router with 5G, earthing, foundation |
| 51 | 11 kV SF6 Outdoor Smart RMU — 4-way (2 VCB + 2 LBS), motorized, SCADA compatible, with FPI, FRTU, 1 kVA Aux Transformer, DCPS, MPLS Router with 5G, earthing, foundation |
| 52 | 11 kV SF6 Outdoor Smart RMU — 5-way (3 VCB + 2 LBS), motorized, SCADA compatible, with FPI, FRTU, 1 kVA Aux Transformer, DCPS, MPLS Router with 5G, earthing, foundation |
| 53 | Engineering, drawing & supply of Specialized Equipment & Critical Infrastructure Power Supply Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 54 | Vehicle-mounted UG Cable Fault Locating System (11 kV & 33 kV XLPE) — TDR, surge generator, acoustic/EM receiver, route tracer, sheath fault locator, vehicle fitment, DG/UPS, documentation & training |
| 55 | Additional DT & Backup DG arrangement for Pump House & STP — complete with UG cabling, RMU, flood-proof foundation (Lump Sum) |
| 56 | Engineering, drawing & supply of LT (0.433 kV) NETWORK AUGMENTATION (UG + Hybrid AB Cable) work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 57 | LT XLPE Armoured Cable 3.5C × 300 sqmm (0.6/1.1 kV, Al) |
| 58 | LT XLPE Armoured Cable 3.5C × 240 sqmm (0.6/1.1 kV, Al) |
| 59 | LT XLPE Armoured Cable 3.5C × 185 sqmm (0.6/1.1 kV, Al) |
| 60 | LT XLPE Armoured Cable 3.5C × 120 sqmm (0.6/1.1 kV, Al) |
| 61 | Heat-shrink straight-through joint kit for 3.5C × 300 sqmm (1.1 kV) |
| 62 | Heat-shrink straight-through joint kit for 3.5C × 240 sqmm (1.1 kV) |
| 63 | Heat-shrink straight-through joint kit for 3.5C × 185 sqmm (1.1 kV) |
| 64 | Heat-shrink straight-through joint kit for 3.5C × 120 sqmm (1.1 kV) |
| 65 | Cable route marker/indicator (stone/FRP) |
| 66 | Warning/caution tape (ELECTRIC CABLE BELOW) |
| 67 | HDPE Duct/Pipe (160/200 mm as per design) |
| 68 | GI / RCC Hume pipe for special crossings |
| 69 | AB Cable (Aerial Bunched) 1.1 kV for service connection where UG not possible |
| 70 | AB Cable accessories — suspension/dead-end clamps, IPC, lugs etc. (lump sum per km) |
| 71 | Feeder Pillar arrangement — incomer MCCB, outgoing ways, busbars, neutral link, earthing, foundation |
| 72 | Any materials, works, or services required to be supplied and executed for completion of the project activity. |
| 73 | Engineering, drawing & supply of COMMUNICATION NETWORK (96F OFC DUAL RING) work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 74 | 96-Core Single Mode Armoured OFC (ITU-T G.652D/G.657A1) |
| 75 | HDPE PLB Duct (40/32 mm) including end caps |
| 76 | Entry/Exit pit excavation & reinstatement for HDD bores |
| 77 | Duct couplers/joints (for PLB duct) |
| 78 | Handholes / Chambers (RCC/brick, covers) incl. civil works |
| 79 | Straight splicing incl. fusion splicing, protection sleeves, testing |
| 80 | 96F Splice closure (heat shrink/mechanical) with accessories |
| 81 | Splice trays (12F) for closures |
| 82 | ODF/Patch panel 96F with accessories (rack/wall mount) |
| 83 | Fiber pigtails (SC/LC, SM, 1–2 m) |
| 84 | Patch cords (SM) for commissioning |
| 85 | Termination at ODF (splicing pigtails, dressing, labeling) |
| 86 | Route marker posts/stones with numbering |
| 87 | Warning/caution tape (OFC) |
| 88 | As-built drawing, route survey/GPS chainage, labeling schedule |
| 89 | Restoration / reinstatement allowance |
| 90 | Engineering, drawing, Supply of Hardware & Software for Main Control Centre and Backup Control Centre as per TS & approved Drawing. |
| 91 | Main Control Centre |
| 92 | SCADA Server (with all necessary accessories) |
| 93 | DMS Server (with all necessary accessories) |
| 94 | OMS Server (with all necessary accessories) |
| 95 | FEP server with interface switches (with all necessary accessories) |
| 96 | ISR server (with all necessary accessories) |
| 97 | NMS server (with all necessary accessories) |
| 98 | DTS server (with all necessary accessories) |
| 99 | Developmental server (with all necessary accessories) |
| 100 | Commnunication Server incl ICCP (with all necessary accessories) |
| 101 | Web/Directory server (with all necessary accessories) |
| 102 | SMS Gateway (with all necessary accessories) |
| 103 | Workstation with dual TFT Monitors ( S/S monitoring) (with all necessary accessories) |
| 104 | Workstation with dual TFT Monitors (Network monitoring) (with all necessary accessories) |
| 105 | Remote VDUs with one TFT Monitors (with all necessary accessories) |
| 106 | UPS (2 kVA ) (with all necessary accessories) |
| 107 | Developmental console with one TFT (with all necessary accessories) |
| 108 | DTS/Workstation Console with dual TFTs (with all necessary accessories) |
| 109 | LED based Video Projection system with 3x4 Module configuration with each module at least 76\\" diagonal with common projector (1080- resolution) (with all necessary accessories) |
| 110 | External RAID Mass storage device ( for 24 months online backup) (with all necessary accessories) |
| 111 | Layer III switch (SCADA/DMS LAN) (with all necessary accessories) |
| 112 | Layer III switch ( Planning & Development system LAN) (with all necessary accessories) |
| 113 | Router for interfacing IT system & SCADA/DMS DR centre (with all necessary accessories) |
| 114 | Web server with load balancing (with all necessary accessories) |
| 115 | Mail server (with all necessary accessories) |
| 116 | Next Gen Router (with all necessary accessories) |
| 117 | Firewall & network IDS/IPS (with all necessary accessories) |
| 118 | Layer III switch (with all necessary accessories) |
| 119 | GPS Time synchronisation system (with all necessary accessories) |
| 120 | Time, day & date digital displays (with all necessary accessories) |
| 121 | Color inkjet printer (with all necessary accessories) |
| 122 | B/W Laser printer (with all necessary accessories) |
| 123 | BACK UP CONTROL CENTRE |
| 124 | Engineering, drawing, Supply Software for Backup Control Centre as per TS & approved Drawing. |
| 125 | SCADA software (with all necessary accessories) |
| 126 | ISR Software (with all necessary accessories) |
| 127 | DMS software (with all necessary accessories) |
| 128 | OMS Software (with all necessary accessories) |
| 129 | ICCP Software (with all necessary accessories) |
| 130 | DTS software (with all necessary accessories) |
| 131 | Developmental software (with all necessary accessories) |
| 132 | Network Management Software (with all necessary accessories) |
| 133 | WEB /Network security software (INCL IN WEBSERVER) (with all necessary accessories) |
| 134 | RDBMS package (with all necessary accessories) |
| 135 | GIS Software for AMC Area ( 7.5 Lac Consumers) |
| 136 | GIS Adaptor/Engine for importing data from GIS system under IT system (with all necessary accessories) |
| 137 | Any other software to meet functional /performance requirement of MTS (GIS Sw ) (with all necessary accessories) |
| 138 | Mandatory Spares 5% of Control Centre Hardware (with all necessary accessories) |
| 139 | Engineering, drawing, Supply Software & Hardware for Backup Control Centre as per TS & approved Drawing. |
| 140 | SCADA Server (with all necessary accessories) |
| 141 | DMS Server (with all necessary accessories) |
| 142 | OMS Server (with all necessary accessories) |
| 143 | FEP server with interface switches (with all necessary accessories) |
| 144 | ISR server (with all necessary accessories) |
| 145 | NMS server (with all necessary accessories) |
| 146 | DTS server (with all necessary accessories) |
| 147 | Developmental server (with all necessary accessories) |
| 148 | Commnunication Server incl ICCP (with all necessary accessories) |
| 149 | Web/Directory server (with all necessary accessories) |
| 150 | SMS Gateway (with all necessary accessories) |
| 151 | Workstation with dual TFT Monitors ( S/S monitoring) (with all necessary accessories) |
| 152 | Workstation with dual TFT Monitors (Network monitoring) (with all necessary accessories) |
| 153 | Developmental console with one TFT (with all necessary accessories) |
| 154 | DTS/Workstation Console with dual TFTs (with all necessary accessories) |
| 155 | LED based Video Projection system with 3x4 Module configuration with each module at least 76\\" diagonal with common projector (1080- resolution) (with all necessary accessories) |
| 156 | External RAID Mass storage device ( for 24 months online backup) (with all necessary accessories) |
| 157 | Exteranl DAT drive (with all necessary accessories) |
| 158 | Layer III switch (SCADA/DMS LAN) (with all necessary accessories) |
| 159 | Layer III switch ( Planning & Development system LAN) (with all necessary accessories) |
| 160 | Router for interfacing IT system & SCADA/DMS DR centre (with all necessary accessories) |
| 161 | Web server with load balancing (with all necessary accessories) |
| 162 | Mail server (with all necessary accessories) |
| 163 | Router (with all necessary accessories) |
| 164 | Firewall & network IDS/IPS (with all necessary accessories) |
| 165 | Layer III switch (with all necessary accessories) |
| 166 | GPS Time synchronisation system (with all necessary accessories) |
| 167 | Time, day & date digital displays (with all necessary accessories) |
| 168 | Color inkjet printer (with all necessary accessories) |
| 169 | B/W Laser printer (with all necessary accessories) |
| 170 | Engineering, drawing, Supply Software for Control Centre as per TS & approved Drawing. |
| 171 | SCADA software (with all necessary accessories) |
| 172 | ISR Software (with all necessary accessories) |
| 173 | DMS software (with all necessary accessories) |
| 174 | OMS Software (with all necessary accessories) |
| 175 | DTS software (with all necessary accessories) |
| 176 | ICCP Software (with all necessary accessories) |
| 177 | Developmental software (with all necessary accessories) |
| 178 | Network Management Software (with all necessary accessories) |
| 179 | WEB /Network security software (incl in web server) (with all necessary accessories) |
| 180 | RDBMS package (with all necessary accessories) |
| 181 | GIS Adaptor/Engine for importing data from GIS system under IT system (with all necessary accessories) |
| 182 | Mandatory Spares 5% of DR Center Hardware (with all necessary accessories) |
| 183 | Engineering, drawing, Supply Advance Analytics Platform (AI & ML Based) software as per TS & approved Drawing. |
| 184 | Platform & Application to be developed For Predictive, Preventive & Descriptive Analysis and Demand Forecast |
| 185 | Engineering, drawing, Supply Asset Management & Maintenance Management System Software for Agartala Distribution as per TS & approved Drawing. |
| 186 | Software Platform for AMS & MMS for Agartala Distribution (AMC) |
| 187 | Engineering, drawing, Supply RTU (Remote Terminal Unit)/ CCTV, Battery Banks & Fire Fighting as per TS & approved Drawing. |
| 188 | RTU base equipment comprising panels, racks, sub-racks, Power Supply modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned in Technical Specification |
| 189 | CCTV along with all mandatory accessories including DVR and Power Supply as per Technical Specification |
| 190 | 48V DC Power Supply (DCPS) system based on SMPS with ( Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup ) (with all necessary accessories) |
| 191 | Fire Fighting System at 33/11kV Control Room Building along with all necessary Accessories with Power Supply as per Technical Specification |
| 192 | Multifunction transducers (with all necessary accessories) |
| 193 | Contact Multiplying Relays (CMRs) (with all necessary accessories) |
| 194 | Heavy duty relays for Control (with all necessary accessories) |
| 195 | Dummy Breaker Latching Relays (with all necessary accessories) |
| 196 | Transformer Transducers (with all necessary accessories) |
| 197 | Single TFT PC for LDMS with 2 KVA UPS with 4 hrs. battery backup. (with all necessary accessories) |
| 198 | Managed Layer II Switch for integration of Numerical Relay with RTU ( 24 Port CU +4 FO) ( Industrial grade ) IEC 61850 (with all necessary accessories) |
| 199 | Engineering, drawing, Supply Software For LDMS as per TS & approved Drawing. |
| 200 | LDMS software (with all necessary accessories) |
| 201 | Engineering, drawing, Supply TEST EQUIPMENTS for RTU as per TS & approved Drawing. |
| 202 | RTU Database Configuration & Maintenance Software tool (with all necessary accessories) |
| 203 | Master Station cum RTU Simulator & Protocol analyser software tool (with all necessary accessories) |
| 204 | Laptop (Min. Intel Core i7 12th Gen, 12 GB RAM/ 1 TB SSD/ window 11 / 15.6 inch Laptop) for above software tools along with interfacing hardware including Hub (with all necessary accessories) |
| 205 | Mandatory Spares 5% of RTU Hardware (with all necessary accessories) |
| 206 | Engineering, drawing, Supply EV Charging Provisioning as per TS & approved Drawing. |
| 207 | EV Charging provisioning at 5 places -Pilot Case |
| 208 | Engineering, drawing, Supply DT Health Management ( DTHM) Installation, commissioning, testing, Integration, cable Laying Including all the necessary hardware, software, and other accessories as per TS & approved Drawing. |
| 209 | Supply & Installation of Lug temperature Sensors (with all necessary accessories) |
| 210 | Supply & Installation of Oil Level Sensor (with all necessary accessories) |
| 211 | 4G/5G Gateway (with all necessary accessories) |
| 212 | Any other sensor (with all necessary accessories) |
| 213 | Software as a Service (SaaS) based web-dash board( 36 Month) (with all necessary accessories) |
| 214 | Annual Maintenance ( 36 month) (with all necessary accessories) |
| 215 | Engineering, drawing & supply of Voltage Regulation and Harmonics ManagementInstallation, commissioning, testing, Integration, cable Laying Including all the necessary hardware, software, and other accessories. As per technical Specification & Approved drawing |
| 216 | Power Quality Meter/ Analyser (with all necessary accessories) |
| 217 | Active Harmonics Filter (with all necessary accessories) |
| 218 | Smart Inverter (Pilot) (with all necessary accessories) |
| 219 | Engineering, drawing & supply Resource Capacity Building - Training Infrastructure & Equipment and other accessories. As per technical Specification & Approved drawing |
| 220 | SCADA + Distribution Automation training lab (RTU/FTU, FPI, comms systems) |
| 221 | ADMS/OMS/DMS operator training simulator (OTS) |
| 222 | AMI / Smart metering lab (HES/MDMS training + meter bench) |
| 223 | Protection & substation automation lab (IEC 61850 demo + relay test set) |
| 224 | OT Cybersecurity lab (OT firewall/IDS + cyber range) |
| 225 | Telecom & OFC lab (splicer, OTDR, patching, instruments) |
| 226 | Power quality & DER integration lab (PQ analyzers, inverter/battery demo) |
| 227 | EV charging & load management demo lab |
| 228 | UG cable jointing & fault management lab (tools + diagnostic instruments) |
| 229 | OH line practical training set (mock poles, stringing tools) |
| 230 | Distribution equipment demo set (RMU, recloser, sectionalizer, feeder pillar) |
| 231 | One set of RMU, Sectionalizers, Auto-reclosers & FPIs |
| 232 | Distribution Network Planning Tool |
| 233 | Network Protocol Simulator |
| 234 | DC Power Supplies & other tools |
| 235 | GIS Demo Software |
| 236 | Furniture & Fixtures |
| 237 | Servers, Monitors & Other IT items |
| 238 | Microgrid Training Module along with BESS |
| 239 | Erection |
| 240 | 33 kV Underground Cable Conversion (3C×400 sqmm XLPE) |
| 241 | Erection, testing & commissioning of 33 kV Underground Cable Conversion (3C×400 sqmm XLPE) work Along with accessories As per IS standard & approved drawings. |
| 242 | 3C × 400 sqmm, 33 kV XLPE Cable (Armoured), Aluminium, A2XFY |
| 243 | Heat-shrinkable jointing kit for 3C×400 mm² 33 kV XLPE Cable (outdoor type) |
| 244 | Heat-shrinkable jointing kit for 3C×400 mm² 33 kV XLPE Cable (straight type) |
| 245 | HDPE Pipe, 200 mm dia, PE80-PN8, 10 m lengths |
| 246 | Route and joint indicating stones |
| 247 | GI Pipe 200 mm dia, 6 mm thick, ISI marked, with sockets & sealing (as per TSECL/IS specifications) |
| 248 | 40 mm nominal bore GI pipe (medium gauge) earthing device, 3 m long |
| 249 | 7/10 SWG GI stay wire, Grade-2 |
| 250 | HDPE Pipe, 20 mm size |
| 251 | Aluminium cable sockets, 95 mm² |
| 252 | Erection, testing & commissioning of 33/11 kV Power Transformer — 16 MVA (with accessories & oil) in replacement work As per IS standard , Approved Technical Specification & drawings. |
| 253 | 33/11 kV Power Transformer — 16 MVA (with accessories & oil) |
| 254 | Erection, testing & commissioning of 33/11 kV Substation Control Room Building Augmentation in replacement work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 255 | Comprehensive refrbishment of 33/11 KV Substation control room building - civil repairs, electrical renovation, plumbing, IT/comms reainess, testing, commissioning & handover Complete turnkey basis |
| 256 | 33/11 kv GIS Substaion |
| 257 | Erection, testing & commissioning of New 33/11 Kv GIS Substation as per TS & approved Drawing. |
| 258 | 33/11 kV GIS Substation with 33kV side :2 Nos incomer, 2 Nos Trafo, 1 Nos Bus coupler, 1 Nos Bus Riser & 11 KV side : 8 No outgoing, 3 Nos bus section, 2 Nos Bus coupler & 3 Nos incomer |
| 259 | New 132/33 kv GIS Substaion |
| 260 | Erection, Testing & Commissioning of new 132/33 kv GIS Substation with all accessories as per scope of work, approved drawings and technical specifications |
| 261 | 132/33 kV GIS Substation — complete indoor GIS switchgear bay (132 kV side): 4 bays incl. 2 line bays + 2 transformer bay + 1 bus coupler bay |
| 262 | 132/33 kV Power Transformer — 50 MVA, ONAN/ONAF, complete with accessories, oil, marshalling box, Buchholz, WTI/OTI, PRD |
| 263 | 33 kV GIS Switchgear panel — 12 bays (2 incomer + 1 bus coupler + 6 outgoing feeders + 2 bus PT) |
| 264 | Protection, metering & control panels (132 kV + 33 kV) — numerical relays, disturbance recorder, event logger, SAS per IEC 61850 |
| 265 | Station auxiliary system — 2 × 100 kVA 33/0.433 kV aux transformers, LTAC panel, DB, UPS, battery bank (110V DC + 48V DC), DG set 125 kVA |
| 266 | Earthing system — copper bonded earth rods, earth mat (25×6 Cu strip), risers, test links, touch/step potential compliant |
| 267 | SCADA/RTU integration — RTU panel, IEC 61850 gateway, managed switches, OFC termination, NMS integration |
| 268 | CCTV (16 ch IP), fire detection & suppression, access control, perimeter security, street lighting |
| 269 | 132 kV line bay outdoor termination / cable sealing end (if cable entry) or gantry + bus arrangement (if OH entry) |
| 270 | Testing, commissioning, documentation, training & warranty support |
| 271 | Substation building — civil construction for indoor GIS, control room, battery room, relay room, store, office (approx. 600 sqm built-up) |
| 272 | Cable trenches, ducts, cable laying (132 kV + 33 kV + control + OFC) within substation premises |
| 273 | Erection, Testing & Commissioning of new 33/11 kv GIS Substation (E House Pre Fabricated) with all accessories as per scope of work, approved drawings and technical specifications |
| 274 | ETC of complete 33/11 kV Prefabricated E-House Substation (turnkey) — 2 nos. 33 kV SF6 Incomer Panels, 1 no. Bus Coupler, 6 nos. 11 kV VCB Outgoing Feeder Panels, Bus Ducts, Aux Transformer, PLC/RTU Panel, MCC/APFC, Containerized Structure, HVAC, Fire Detection (VESDA), CCTV, earthing, civil foundation, FAT/SAT, commissioning. IEC 62271/IS 13118 compliant. |
| 275 | Erection, Testing & Commissioning of New 33/11 kv GIS Substation (Shifting of Existing Rampur Sub Staion ) with all accessories as per scope of work, approved drawings and technical specifications |
| 276 | ETC of complete 33/11 kV — 2 nos. 33 kV SF6 Incomer Panels, 1 no. Bus Coupler, 6 nos. 11 kV VCB Outgoing Feeder Panels, Bus Ducts, Aux Transformer, PLC/RTU Panel, MCC/APFC, Containerized Structure, HVAC, Fire Detection (VESDA), CCTV, earthing, civil foundation, FAT/SAT, commissioning. IEC 62271/IS 13118 compliant. |
| 277 | 11 kV NETWORK AUGMENTATION (UG CABLE) |
| 278 | Erection, Testing & Commissioningof 11 kV Underground Cable Conversion (3C×300 sqmm XLPE) work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 279 | 3C × 300 sqmm, 11 kV XLPE Cable (Armoured), Aluminium, A2XFY |
| 280 | Heat-shrinkable jointing kit for 3C×300 mm² 11 kV XLPE Cable (outdoor type) |
| 281 | Heat-shrinkable jointing kit for 3C×300 mm² 11 kV XLPE Cable (Straight type) |
| 282 | HDPE Pipe, 200 mm dia, PE80-PN8 |
| 283 | Route and joint indicating stones |
| 284 | GI Pipe 100 mm dia, Heavy Class, Plain End |
| 285 | 40 mm nominal bore GI pipe (medium gauge) earthing device, 3 m long |
| 286 | 7/10 SWG GI stay wire, Grade-2 |
| 287 | HDPE Pipe, 20 mm size |
| 288 | Aluminium cable sockets, 95 mm² |
| 289 | Erection, Testing & Commissioningof of 11 kV Smart Ring Main Units (SCADA Compatible) work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 290 | 11 kV SF6 Outdoor Smart RMU — 3-way (1 VCB + 2 LBS), motorized, SCADA compatible, with FPI, FRTU, 1 kVA Aux Transformer, DCPS, MPLS Router with 5G, earthing, foundation |
| 291 | 11 kV SF6 Outdoor Smart RMU — 4-way (2 VCB + 2 LBS), motorized, SCADA compatible, with FPI, FRTU, 1 kVA Aux Transformer, DCPS, MPLS Router with 5G, earthing, foundation |
| 292 | 11 kV SF6 Outdoor Smart RMU — 5-way (3 VCB + 2 LBS), motorized, SCADA compatible, with FPI, FRTU, 1 kVA Aux Transformer, DCPS, MPLS Router with 5G, earthing, foundation |
| 293 | Erection, Testing & Commissioning of Specialized Equipment & Critical Infrastructure Power Supply Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 294 | Vehicle-mounted UG Cable Fault Locating System (11 kV & 33 kV XLPE) — TDR, surge generator, acoustic/EM receiver, route tracer, sheath fault locator, vehicle fitment, DG/UPS, documentation & training |
| 295 | Additional DT & Backup DG arrangement for Pump House & STP — complete with UG cabling, RMU, flood-proof foundation (Lump Sum) |
| 296 | Erection, Testing & Commissioning of LT (0.433 kV) NETWORK AUGMENTATION (UG + Hybrid AB Cable) work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 297 | LT XLPE Armoured Cable 3.5C × 300 sqmm (0.6/1.1 kV, Al) |
| 298 | LT XLPE Armoured Cable 3.5C × 240 sqmm (0.6/1.1 kV, Al) |
| 299 | LT XLPE Armoured Cable 3.5C × 185 sqmm (0.6/1.1 kV, Al) |
| 300 | LT XLPE Armoured Cable 3.5C × 120 sqmm (0.6/1.1 kV, Al) |
| 301 | Heat-shrink straight-through joint kit for 3.5C × 300 sqmm (1.1 kV) |
| 302 | Heat-shrink straight-through joint kit for 3.5C × 240 sqmm (1.1 kV) |
| 303 | Heat-shrink straight-through joint kit for 3.5C × 185 sqmm (1.1 kV) |
| 304 | Heat-shrink straight-through joint kit for 3.5C × 120 sqmm (1.1 kV) |
| 305 | Cable route marker/indicator (stone/FRP) |
| 306 | Warning/caution tape (ELECTRIC CABLE BELOW) |
| 307 | HDPE Duct/Pipe (160/200 mm as per design) |
| 308 | GI / RCC Hume pipe for special crossings |
| 309 | AB Cable (Aerial Bunched) 1.1 kV for service connection where UG not possible |
| 310 | AB Cable accessories — suspension/dead-end clamps, IPC, lugs etc. (lump sum per km) |
| 311 | Feeder Pillar arrangement — incomer MCCB, outgoing ways, busbars, neutral link, earthing, foundation |
| 312 | Any materials, works, or services required to be supplied and executed for completion of the project activity. |
| 313 | Testing, identification, commissioning documentation |
| 314 | Erection, Testing & Commissioning of COMMUNICATION NETWORK (96F OFC DUAL RING) work Along with accessories As per IS standard , Approved Technical Specification & drawings. |
| 315 | 96-Core Single Mode Armoured OFC (ITU-T G.652D/G.657A1) |
| 316 | HDPE PLB Duct (40/32 mm) including end caps |
| 317 | Entry/Exit pit excavation & reinstatement for HDD bores |
| 318 | Duct couplers/joints (for PLB duct) |
| 319 | Handholes / Chambers (RCC/brick, covers) incl. civil works |
| 320 | Straight splicing incl. fusion splicing, protection sleeves, testing |
| 321 | 96F Splice closure (heat shrink/mechanical) with accessories |
| 322 | Splice trays (12F) for closures |
| 323 | ODF/Patch panel 96F with accessories (rack/wall mount) |
| 324 | Fiber pigtails (SC/LC, SM, 1–2 m) |
| 325 | Patch cords (SM) for commissioning |
| 326 | Termination at ODF (splicing pigtails, dressing, labeling) |
| 327 | Route marker posts/stones with numbering |
| 328 | Warning/caution tape (OFC) |
| 329 | As-built drawing, route survey/GPS chainage, labeling schedule |
| 330 | Restoration / reinstatement allowance |
| 331 | HDD Drilling & pulling for duct (incl. pilot bore, reaming, drilling fluid) |
| 332 | OTDR testing, end-to-end (bi-directional) & documentation |
| 333 | Erection, Testing & Commissioning of Hardware & Software for Main Control Centre and Backup Control Centre as per TS & approved Drawing. |
| 334 | Main Control Centre |
| 335 | SCADA Server (with all necessary accessories) |
| 336 | DMS Server (with all necessary accessories) |
| 337 | OMS Server (with all necessary accessories) |
| 338 | FEP server with interface switches (with all necessary accessories) |
| 339 | ISR server (with all necessary accessories) |
| 340 | NMS server (with all necessary accessories) |
| 341 | DTS server (with all necessary accessories) |
| 342 | Developmental server (with all necessary accessories) |
| 343 | Commnunication Server incl ICCP (with all necessary accessories) |
| 344 | Web/Directory server (with all necessary accessories) |
| 345 | SMS Gateway (with all necessary accessories) |
| 346 | Workstation with dual TFT Monitors ( S/S monitoring) (with all necessary accessories) |
| 347 | Workstation with dual TFT Monitors (Network monitoring) (with all necessary accessories) |
| 348 | Remote VDUs with one TFT Monitors (with all necessary accessories) |
| 349 | UPS (2 kVA ) (with all necessary accessories) |
| 350 | Developmental console with one TFT (with all necessary accessories) |
| 351 | DTS/Workstation Console with dual TFTs (with all necessary accessories) |
| 352 | LED based Video Projection system with 3x4 Module configuration with each module at least 76\\" diagonal with common projector (1080- resolution) (with all necessary accessories) |
| 353 | External RAID Mass storage device ( for 24 months online backup) (with all necessary accessories) |
| 354 | Layer III switch (SCADA/DMS LAN) (with all necessary accessories) |
| 355 | Layer III switch ( Planning & Development system LAN) (with all necessary accessories) |
| 356 | Router for interfacing IT system & SCADA/DMS DR centre (with all necessary accessories) |
| 357 | Web server with load balancing (with all necessary accessories) |
| 358 | Mail server (with all necessary accessories) |
| 359 | Next Gen Router (with all necessary accessories) |
| 360 | Firewall & network IDS/IPS (with all necessary accessories) |
| 361 | Layer III switch (with all necessary accessories) |
| 362 | GPS Time synchronisation system (with all necessary accessories) |
| 363 | Time, day & date digital displays (with all necessary accessories) |
| 364 | Color inkjet printer (with all necessary accessories) |
| 365 | B/W Laser printer (with all necessary accessories) |
| 366 | BACK UP CONTROL CENTRE |
| 367 | Erection, Testing & Commissioning of Software for Backup Control Centre as per TS & approved Drawing. |
| 368 | SCADA software (with all necessary accessories) |
| 369 | ISR Software (with all necessary accessories) |
| 370 | DMS software (with all necessary accessories) |
| 371 | OMS Software (with all necessary accessories) |
| 372 | ICCP Software (with all necessary accessories) |
| 373 | DTS software (with all necessary accessories) |
| 374 | Developmental software (with all necessary accessories) |
| 375 | Network Management Software (with all necessary accessories) |
| 376 | WEB /Network security software (INCL IN WEBSERVER) (with all necessary accessories) |
| 377 | RDBMS package (with all necessary accessories) |
| 378 | GIS Software for AMC Area ( 7.5 Lac Consumers) |
| 379 | GIS Adaptor/Engine for importing data from GIS system under IT system (with all necessary accessories) |
| 380 | Any other software to meet functional /performance requirement of MTS (GIS Sw ) (with all necessary accessories) |
| 381 | Erection, Testing & Commissioning Software & Hardware for Backup Control Centre as per TS & approved Drawing. |
| 382 | SCADA Server (with all necessary accessories) |
| 383 | DMS Server (with all necessary accessories) |
| 384 | OMS Server (with all necessary accessories) |
| 385 | FEP server with interface switches (with all necessary accessories) |
| 386 | ISR server (with all necessary accessories) |
| 387 | NMS server (with all necessary accessories) |
| 388 | DTS server (with all necessary accessories) |
| 389 | Developmental server (with all necessary accessories) |
| 390 | Commnunication Server incl ICCP (with all necessary accessories) |
| 391 | Web/Directory server (with all necessary accessories) |
| 392 | SMS Gateway (with all necessary accessories) |
| 393 | Workstation with dual TFT Monitors ( S/S monitoring) (with all necessary accessories) |
| 394 | Workstation with dual TFT Monitors (Network monitoring) (with all necessary accessories) |
| 395 | Developmental console with one TFT (with all necessary accessories) |
| 396 | DTS/Workstation Console with dual TFTs (with all necessary accessories) |
| 397 | LED based Video Projection system with 3x4 Module configuration with each module at least 76\\" diagonal with common projector (1080- resolution) (with all necessary accessories) |
| 398 | External RAID Mass storage device ( for 24 months online backup) (with all necessary accessories) |
| 399 | Exteranl DAT drive (with all necessary accessories) |
| 400 | Layer III switch (SCADA/DMS LAN) (with all necessary accessories) |
| 401 | Layer III switch ( Planning & Development system LAN) (with all necessary accessories) |
| 402 | Router for interfacing IT system & SCADA/DMS DR centre (with all necessary accessories) |
| 403 | Web server with load balancing (with all necessary accessories) |
| 404 | Mail server (with all necessary accessories) |
| 405 | Router (with all necessary accessories) |
| 406 | Firewall & network IDS/IPS (with all necessary accessories) |
| 407 | Layer III switch (with all necessary accessories) |
| 408 | GPS Time synchronisation system (with all necessary accessories) |
| 409 | Time, day & date digital displays (with all necessary accessories) |
| 410 | Color inkjet printer (with all necessary accessories) |
| 411 | B/W Laser printer (with all necessary accessories) |
| 412 | Erection, Testing & Commissioning Software for Control Centre as per TS & approved Drawing. |
| 413 | SCADA software (with all necessary accessories) |
| 414 | ISR Software (with all necessary accessories) |
| 415 | DMS software (with all necessary accessories) |
| 416 | OMS Software (with all necessary accessories) |
| 417 | DTS software (with all necessary accessories) |
| 418 | ICCP Software (with all necessary accessories) |
| 419 | Developmental software (with all necessary accessories) |
| 420 | Network Management Software (with all necessary accessories) |
| 421 | WEB /Network security software (incl in web server) (with all necessary accessories) |
| 422 | RDBMS package (with all necessary accessories) |
| 423 | GIS Adaptor/Engine for importing data from GIS system under IT system (with all necessary accessories) |
| 424 | Erection, Testing & Commissioning Advance Analytics Platform (AI & ML Based) software as per TS & approved Drawing. |
| 425 | Platform & Application to be developed For Predictive, Preventive & Descriptive Analysis and Demand Forecast |
| 426 | Erection, Testing & Commissioning Asset Management & Maintenance Management System Software for Agartala Distribution as per TS & approved Drawing. |
| 427 | Software Platform for AMS & MMS for Agartala Distribution (AMC) |
| 428 | Erection, Testing & Commissioning (Remote Terminal Unit)/ CCTV, Battery Banks & Fire Fighting as per TS & approved Drawing. |
| 429 | RTU base equipment comprising panels, racks, sub-racks, Power Supply modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned in Technical Specification |
| 430 | CCTV along with all mandatory accessories including DVR and Power Supply as per Technical Specification |
| 431 | 48V DC Power Supply (DCPS) system based on SMPS with ( Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup ) (with all necessary accessories) |
| 432 | Fire Fighting System at 33/11kV Control Room Building along with all necessary Accessories with Power Supply as per Technical Specification |
| 433 | Multifunction transducers (with all necessary accessories) |
| 434 | Contact Multiplying Relays (CMRs) (with all necessary accessories) |
| 435 | Heavy duty relays for Control (with all necessary accessories) |
| 436 | Dummy Breaker Latching Relays (with all necessary accessories) |
| 437 | Transformer Transducers (with all necessary accessories) |
| 438 | Single TFT PC for LDMS with 2 KVA UPS with 4 hrs. battery backup. (with all necessary accessories) |
| 439 | Managed Layer II Switch for integration of Numerical Relay with RTU ( 24 Port CU +4 FO) ( Industrial grade ) IEC 61850 (with all necessary accessories) |
| 440 | Erection, Testing & Commissioning Software For LDMS as per TS & approved Drawing. |
| 441 | LDMS software (with all necessary accessories) |
| 442 | Erection, Testing & Commissioning TEST EQUIPMENTS for RTU as per TS & approved Drawing. |
| 443 | RTU Database Configuration & Maintenance Software tool (with all necessary accessories) |
| 444 | Master Station cum RTU Simulator & Protocol analyser software tool (with all necessary accessories) |
| 445 | Laptop (Min. Intel Core i7 12th Gen, 12 GB RAM/ 1 TB SSD/ window 11 / 15.6 inch Laptop) for above software tools along with interfacing hardware including Hub (with all necessary accessories) |
| 446 | Mandatory Spares 5% of RTU Hardware (with all necessary accessories) |
| 447 | Erection, Testing & Commissioning EV Charging Provisioning as per TS & approved Drawing. |
| 448 | EV Charging provisioning at 5 places -Pilot Case |
| 449 | Erection, Testing & Commissioning DT Health Management ( DTHM) Installation, commissioning, testing, Integration, cable Laying Including all the necessary hardware, software, and other accessories as per TS & approved Drawing. |
| 450 | Supply & Installation of Lug temperature Sensors (with all necessary accessories) |
| 451 | Supply & Installation of Oil Level Sensor (with all necessary accessories) |
| 452 | 4G/5G Gateway (with all necessary accessories) |
| 453 | Any other sensor (with all necessary accessories) |
| 454 | Software as a Service (SaaS) based web-dash board( 36 Month) (with all necessary accessories) |
| 455 | Engineering, drawing & supply of Voltage Regulation and Harmonics ManagementInstallation, commissioning, testing, Integration, cable Laying Including all the necessary hardware, software, and other accessories. As per technical Specification & Approved drawing |
| 456 | Power Quality Meter/ Analyser (with all necessary accessories) |
| 457 | Active Harmonics Filter (with all necessary accessories) |
| 458 | Smart Inverter (Pilot) (with all necessary accessories) |
| 459 | Engineering, drawing & supply Resource Capacity Building - Training Infrastructure & Equipment and other accessories. As per technical Specification & Approved drawing |
| 460 | SCADA + Distribution Automation training lab (RTU/FTU, FPI, comms systems) |
| 461 | ADMS/OMS/DMS operator training simulator (OTS) |
| 462 | AMI / Smart metering lab (HES/MDMS training + meter bench) |
| 463 | Protection & substation automation lab (IEC 61850 demo + relay test set) |
| 464 | OT Cybersecurity lab (OT firewall/IDS + cyber range) |
| 465 | Telecom & OFC lab (splicer, OTDR, patching, instruments) |
| 466 | Power quality & DER integration lab (PQ analyzers, inverter/battery demo) |
| 467 | EV charging & load management demo lab |
| 468 | UG cable jointing & fault management lab (tools + diagnostic instruments) |
| 469 | OH line practical training set (mock poles, stringing tools) |
| 470 | Distribution equipment demo set (RMU, recloser, sectionalizer, feeder pillar) |
| 471 | One set of RMU, Sectionalizers, Auto-reclosers & FPIs |
| 472 | Distribution Network Planning Tool |
| 473 | Network Protocol Simulator |
| 474 | DC Power Supplies & other tools |
| 475 | GIS Demo Software |
| 476 | Furniture & Fixtures |
| 477 | Servers, Monitors & Other IT items |
| 478 | Microgrid Training Module along with BESS |
| 479 | OTHERS |
| 480 | Construction of MCC & BCC |
| 481 | Main Control Centre (MCC) Building — civil construction, finishing, MEP, structured cabling, access control, HVAC, DG set, furniture, signage (approx. 3040 sqm built-up) |
| 482 | Backup Control Centre (BCC) Building — civil construction at separate location, finishing, MEP, HVAC, DG (approx. 300 sqm) |
| 483 | DLP, FMS , O&M |
| 484 | Facility Management , Operation & Maintenace of System for 7 Years as per Technical Specification |
| 485 | Resource Augmentation During Implementation |
| 486 | External Training Budget for Engineers & Resources |
| 487 | SCADA, ADMS & OMS Expert — Man Months |
| 488 | GIS Expert — Man Months |
| 489 | Power System Expert — Man Months |
| 490 | Protection & Control Expert — Man Months |
| 491 | Cyber Security Expert — Man Months Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail