| 1 | Earth work in excavation by manual means in trenches for foundation, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not ramming of bottoms lift up to 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed within a lead of 50 mts. Allow 70 percent for all kinds of soil |
| 2 | Allow 20 percent for ordinary rock(Blasting Prohibited) |
| 3 | Allow 10 percent for hard rock(Blasting Prohibited) |
| 4 | Earth work in excavation by mechanical means in trenches for foundation, drains ,pipes, cables etc. (not exceeding 1.5 m in width ) and for shafts, wells, cesspits and the like not ramming of bottoms lift up to 1.5m, including getting out excavated earth and disposal of surplus excavated earth as Allow 70 percent for all kinds of soil |
| 5 | Allow 20 percent for ordinary rock(Blasting Prohibited) |
| 6 | Allow 10 percent for hard rock(Blasting Prohibited) |
| 7 | Circumferential cutting of MS/GI pipe rising main by welding a)100mm |
| 8 | b)125mm |
| 9 | Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked pipes as per IS-4984; 1995 (amended upto date) with necessary jointing materials like mechanical connectors i.e thred / insert joint/quick release coupler joint/compression fitting joint or flanged joint and specials jointing pipe by butt fusion welding method, including all taxes, transportation and freight charges, loading / unloading chages, stacking of pipes, including cost of labour and materials, specials (Tee, Bend ete) satisfactory hydraulic testing, disinfection, commissioning etc complete as per technical specifications and direction of Engineer in charge of following earthwork). .HDPE PE-100, PN-16. a)110mm |
| 10 | b)140mm |
| 11 | c)160mm |
| 12 | Filling available excavation earth (excluding rock) in trenches plinth sides of foundation etc. layer not exceeding 20mtr in depth. Consolidation each deposit layers by remaining waking, lead up to 50mm & lift up to 1.5m |
| 13 | Providing, Lowering laying, aligning, fixing in position in pipe line, Sluice valve of kirloskar/equivalent make of approved mark of PN16 of required size including complete labour, matching flange, testing and commissioning along with pipes lines as per technical specification and as per direction of Engineer. a)100 mm dia Sluice Valve |
| 14 | 125 mm dia Sluice Valve |
| 15 | 150 mm dia Sluice Valve |
| 16 | Providing, Lowering laying, aligning, fixing in position in pipe line, CI Non return valve of kirloskar/equivalent make of approved mark of PN16 of required size including complete labour, matching flange, testing and commissioning along with pipes lines as per technical specification and as per direction of Engineer. 100 mm dia NRV |
| 17 | 125mm dia NRV |
| 18 | 150 mm dia NRV |
| 19 | Manual Extraction of submersible pump along with riser pipes MS/HDPE/GI/ppr flanged pipe of 10 feet long depth at which pump is installed to replace the damaged motor. The job also includes complete dismantling of MS bend,sluice valve,reflex valve40/50mm |
| 20 | 100mm |
| 21 | 125mm |
| 22 | Manual lowering of submersible pump along with riser pipes MS/HDPE/GI/ppr flanged pipe of 10 feet long depth at which pump is installed to replace the damaged motor. The job also includes complete dismantling of MS bend,sluice valve,reflex valve40/50mm |
| 23 | 100mm |
| 24 | 125mm |
| 25 | Providing and fitting of sq mm submersible cable 2.5 sqm |
| 26 | 4 sqm |
| 27 | 6 sqm |
| 28 | 10 sqm |
| 29 | 16 sqm |
| 30 | Repairing of solar submersible Motor which includes repairing or replacing of wire, wooden stick, paper, Bush, oil/water seal, thrust plate, rotor size and tape rolletc, Including to-and-fro transportation.(1HP) |
| 31 | 7.5 Hp |
| 32 | 10 HP |
| 33 | 12.5 HP |
| 34 | 15 HP |
| 35 | 17.5 HP |
| 36 | 20 HP |
| 37 | 25 HP |
| 38 | 33 HP |
| 39 | 40 HP |
| 40 | Repairing of solar submersible Pump which includes repairing or replacing of Impellar,defuser,coupling,Impellar bush,shaft grinding & nut bolts etc,including to and fro transportation (1HP) |
| 41 | 7.5 HP |
| 42 | 10 HP |
| 43 | 12.5 HP |
| 44 | 15 HP |
| 45 | 17.5 HP |
| 46 | 20 HP |
| 47 | 25 HP |
| 48 | 33 HP |
| 49 | 40 HP |
| 50 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(1HP)a) MCB |
| 51 | b) Conection Terminal |
| 52 | c) Wire and Switches |
| 53 | d) Drive |
| 54 | e) Parameter Setting |
| 55 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(2 HP)a) MCB |
| 56 | b) Conection Terminal |
| 57 | c) Wire and Switches |
| 58 | d) Drive |
| 59 | e) Parameter Setting |
| 60 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.3 HP)a) MCB |
| 61 | b) Conection Terminal |
| 62 | c) Wire and Switches |
| 63 | d) Drive |
| 64 | e) Parameter Setting |
| 65 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(5HP)a) MCB |
| 66 | b) Conection Terminal |
| 67 | c) Wire and Switches |
| 68 | d) Drive |
| 69 | e) Parameter Setting |
| 70 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(7.5 HP)a) MCB |
| 71 | b) Conection Terminal |
| 72 | c) Wire and Switches |
| 73 | d) Drive |
| 74 | e) Parameter Setting |
| 75 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(10 HP)a) MCB |
| 76 | b) Conection Terminal |
| 77 | c) Wire and Switches |
| 78 | d) Drive |
| 79 | e) Parameter Setting |
| 80 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(12.5 HP)a) MCB |
| 81 | b) Conection Terminal |
| 82 | c) Wire and Switches |
| 83 | d) Drive |
| 84 | e) Parameter Setting |
| 85 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(15 HP)a) MCB |
| 86 | b) Conection Terminal |
| 87 | c) Wire and Switches |
| 88 | d) Drive |
| 89 | e) Parameter Setting |
| 90 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(17.5HP)a) MCB |
| 91 | b) Conection Terminal |
| 92 | c) Wire and Switches |
| 93 | d) Drive |
| 94 | e) Parameter Setting |
| 95 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(20 HP)a) MCB |
| 96 | b) Conection Terminal |
| 97 | c) Wire and Switches |
| 98 | d) Drive |
| 99 | e) Parameter Setting |
| 100 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(25 HP)a) MCB |
| 101 | b) Conection Terminal |
| 102 | c) Wire and Switches |
| 103 | d) Drive |
| 104 | e) Parameter Setting |
| 105 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(33 HP)a) MCB |
| 106 | b) Conection Terminal |
| 107 | c) Wire and Switches |
| 108 | d) Drive |
| 109 | e) Parameter Setting |
| 110 | Repairingand replacing the VFD/Starter panel, including to- and-fro transportation.(40 HP)a) MCB |
| 111 | b) Conection Terminal |
| 112 | c) Wire and Switches |
| 113 | d) Drive |
| 114 | e) Parameter Setting |
| 115 | Repairing/Replacement of Solar panels of 335/500W solar plate approved by MNRE,having 25-year performance warranty,including labour and transportation charges Please Enable Macros to View BoQ information |