| 1 | [1.PM026] PM026. Tractor with trolley [Rate] |
| 2 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) [Through Rate] |
| 3 | [11.52]Cement rendering on plaster 1 mm thick [Through Rate] |
| 4 | [14.51.2]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 2. Hire Charges for excavator 0.40 to 0.75 cum bucket capacity [Through rate] |
| 5 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] |
| 6 | [20.62.3]Providing, lowering, laying, cutting (cut surface to be uniformly finished), jointing with rubber rings marked with IS : 5382 and testing of SPIGOT AND SOCKETTED RCC, NP2 MARKED WITH IS : 458-1988 and specials into trenches for all depths including carriage, loading, unloading, stacking, handling, re-handling etc. complete is all respects to the satisfaction to the Engineer - in -charge. 3. 300 mm i/d [Through Rate] |
| 7 | [21.103.10]Job work for cleaning of sewer lines by bucket type sewer machine including cost of diesel/lubricants complete in all respects. Only sewer machines will be provided by the department for the following sizes of sewer: 10. 900 mm i/d [Through Rate] |
| 8 | [21.103.11]Job work for cleaning of sewer lines by bucket type sewer machine including cost of diesel/lubricants complete in all respects. Only sewer machines will be provided by the department for the following sizes of sewer: 11. 1050 mm i/d [Through Rate] |
| 9 | [21.103.6]Job work for cleaning of sewer lines by bucket type sewer machine including cost of diesel/lubricants complete in all respects. Only sewer machines will be provided by the department for the following sizes of sewer: 6. 450 mm i/d [Through Rate] |
| 10 | [21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge [Through Rate] |
| 11 | [21.43]Extra over the rate laid down in this schedule for cement concrete work more making and finishing benching and complicated floor work in manholes, including formation of channels and bulldozing and smooth finishing the surface accurately to template. [Through Rate] |
| 12 | [21.57.1.11]Providing masonry plugs to ends of sewers of all types with 11.43 cm thick brick wall in cement sand mortar 1:7 with 12 mm thick cement plaster 1:6 (as required by the engineer-in-charge). 1.11. For Circular sewers having internal diameter - 450 mm [Through Rate] |
| 13 | [21.87.1.1]Constructing brick masonry road gully chambers as per standard drawings (as per sizes given below) including dressing of beds and sides of chambers to exact profiles, 15cm thick lime concrete 16:24:100 (as per specified in item No.10.6) in foundations 1st class brick work laid in cement sand mortar 1:5, 40 mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of 1.5mm thick neat cement laid in one operation to the topping, the entire inner surface of the chamber rendered with neat cement not less than 12mm in thickness of 1:2 cement sand plaster and finished with floating coat of neat cement 1 mm thick left absolutely smooth polished and correct to templates including labour for fixing the C.I. road gully grating and frame including painting with coal tar (as Specified in item No. Item 21.48) complete to the requirement of the Engineer in-charge 1.1. Single road gully chamber - Size: 610mm x 457mm x 800mm [Through Rate] |
| 14 | [21.87.2.1]Constructing brick masonry road gully chambers as per standard drawings (as per sizes given below) including dressing of beds and sides of chambers to exact profiles, 15cm thick lime concrete 16:24:100 (as per specified in item No.10.6) in foundations 1st class brick work laid in cement sand mortar 1:5, 40 mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of 1.5mm thick neat cement laid in one operation to the topping, the entire inner surface of the chamber rendered with neat cement not less than 12mm in thickness of 1:2 cement sand plaster and finished with floating coat of neat cement 1 mm thick left absolutely smooth polished and correct to templates including labour for fixing the C.I. road gully grating and frame including painting with coal tar (as Specified in item No. Item 21.48) complete to the requirement of the Engineer in-charge 2.1. Double Road Gully Chamber - Size 1448mm x 457mm x 800mm [Through Rate] |
| 15 | [21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening [Through Rate] |
| 16 | [21.95.3]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 3. 450 mm [Through Rate] |
| 17 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] |
| 18 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] |
| 19 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 20 | [6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 21 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] |
| 22 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] |
| 23 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate] |
| 24 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] |
| 25 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] |
| 26 | Providing and laying of new water supply connection on new pipeline including cost of excavation 20mm i/d CPVC pipe, union elbow etc. complete inall respect and to the entire satisfaction of Engineer-In-Charge . |
| 27 | Dismantling and set right of old sewer connection during laying of sewerage line including cost of 160mm PVC pipe of 6 Kg pressure, coupler etc.. complete in all respect to the satisfaction of Engineer-in-Charge. |
| 28 | Dismantling of old water connection set right for drinking purpose, including cost of CPVC pipe, nipple, union and elbow, cleaning of lines and excavation etc.. complete with the satisfaction of Engineer-in-Charge... |
| 29 | Providing and fixing SFRC road gully cover frame and including cost of material and labour complete in all respect. ( Double Road Gully ) |
| 30 | Providing and fixing SFRC road gully cover frame and including cost of material and labour complete in all respect. ( Single Road Gully ) |
| 31 | Cleaning of silt/ sullage from sewer manholes with average silt 0.60m and more, with clearance of silt / sludge by mechanical suction pressure sewer cleaning machine including P.O.L, lubricants and operating staff, sewer helper for opening and refixing manhole covers, safety equipment, insurance of workers, machinery disposal of malba/sullage to suitable place complete to the entire satisfaction of the Engineer-in-charge. Please Enable Macros to View BoQ information |