Name of Work:- Repair of sandstone footpath of Herbal garden at C-DOT c us, Delhi.
Sl. No.
Item Description
1
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipaldumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leadsincluding all lifts involved.
2
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting outand disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil
3
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
4
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
6
Replacing sand stone slabs in roofing, laid in cement mortar 1:4 (1 cement : 4 coarse sand), including necessary repairs and cement pointing with same mortar complete, including disposal of rubbish to dumping ground, all complete as perdirection of Engineer-in-Charge. Red/ white sand stone slabs 30 to 50 mm thick
7
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
8
Brick work with common burnt clay modular bricks of class designation7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand)
9
Refixing of 40 mm thick existing red stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished flush.
10
sub total
11
contingencies @ 3% Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.