| 1 | Excavation in foundation and trenches etc. (including pipes and pits upto all depths) in all kinds of soil such as pick work, jumper work, blasting and chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming and dressing of sides, levelling of bed to correct grade stacking the excavated soil clear from the edge of excavation and returning the excavated soil after laying, jointing and testing of GI pipes in trenches in 15cm layers including consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting and trimming dressing where ever required including restoration of un-metalled surface to its original condition including cost of diversion for traffic night signals fixing caution board, crossing over trenches for access to houses and fencing etc. complete in all respect. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying cement concrete 1:1.5:3(1cement:1.5 sand:3 crushed stone agg.20mm nominal size )& curing complete excluding the cost of form work and reinforcement for reinforced concrete work in: |
| 4 | In foundation and plinth in all leads and lifts. |
| 5 | Walls (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level in all leads and lifts |
| 6 | Suspended floors, roofs,landings and shelves and their supports, balconies, beams, girders, bressumers and cantilivers up to floor two level in all leads and lifts. |
| 7 | Providing form work with steel plates 3.15mm thick welded with angle iron in frames 30x30x5mm, so as to give a fair finish including centring, shuttering ,strutting and propping etc.with wooden battens and ballies,height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for in situ reinforced concrete and plain concrete work in:- |
| 8 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillaster,buttresses, plinth and string courses and the like in all leads and lifts. |
| 9 | Flat surfaces such as soffits of suspended floors, roofs landings and the like: floors etc. up to 200 mm in thickness in all leads and lifts. |
| 10 | Edges of slabs and breaks in floors and walls in all leads and lifts. |
| 11 | Providing tor steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two level in all leads and lifts. |
| 12 | Brick work using common burunt clay building bricks in super structure above plinth level upto floor two level in cement mortor 1:6 (1cement : 6 sand) 2nd class bricks in all leads and lifts. |
| 13 | Providing and laying cement concrete 1:2:4 (1cement:2 sand:4 crushed stone agg.20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work:- Column,Pillars, post and struts upto floor two lvel with in all lead and lifts as per direction of Engineer-in-charge. |
| 14 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3coarse sand) : 6 graded stone aggregate 40 mm nominal size) |
| 15 | White washing with lime on undecorated wall surfaces two coats to give an even shade including thoroughly brooming the surface to remove all dirt , dust and other foreign matters in all leads and lifts. |
| 16 | Providing and fixing MS grating including all leads and lifts. |
| 17 | Providing and fixing MS ISMB 200 including all leads and lifts. |
| 18 | Providing and fixing Exhaust Fan of reputed make including all leads and lifts. |
| 19 | Providing and fixing Pannel Door (Aluminium) i/c frame etc. complete in all respect and as per the direction of Engineer-in-charge. |
| 20 | Providing and fixing Non clog type submersible sewage pumps with suitable motor of reputed make & model for following duty condition with guide rail system, lifting chain and protection system complete in all respects and to the entire satisfation of Engineer-in-Charge. Intermittent Pumping Station at Khaliyar |
| 21 | Discharge 1.04 LPS and Head 19.53 meter and length of Rising Main 100 mm dia =1370 Meter |
| 22 | Discharge 2.08 LPS and Head 19.53 meter and length of Rising Main 100 mm dia=1370 |
| 23 | Discharge 5.21 LPS and Head 19.53 meter and length of Rising Main 100 mm dia=1370 Meter |
| 24 | Intermittent Pumping Station at Indira Market |
| 25 | Discharge 1.62 LPS and Head 7.91 meter and length of Rising Main 100 mm dia=300 Meter |
| 26 | Discharge 0.8 LPS and Head 7.91 meter and length of Rising Main 100 mm dia=300 Meter |
| 27 | Discharge 4.05 LPS and Head 7.91 meter and length of Rising Main 100 mm dia=300 Meter |
| 28 | Automatic Control Pannel with starter, main MCB, Voltmeter, Amp meter, Power Capacitor, Control MCb, Supply & Motor Side Cable/NRV/ Sluice valve/Common Header Job/Earthing and the all other required components as per the relevant IS code ( latest edition & CPHEEO Mannual) in all respects and to the entire satisfation of Engineer-in-Charge. |
| 29 | Providing, Laying & Jointing of (100 mm dia) Duticle Iron Pipe (flanged Joint) i/c all types of bends and EPDM Rubber Gasket as per CPHEEO mannual (Lastest Editions)as per the site requiremnt and as per the direction of Engineer - In Charge. |
| 30 | Providing & Fixing Screen Size Bar (10x50 mm) i/c all respect and as per direction of the Engineer In Charge |
| 31 | Manufacturing & Supplying of fencing panel of size 2.40m x 1.20m fixed on all sides with ISA 40x40x5mm as per drawing. Three pieces of similar section of 0.25m long be fixed at the bottom frame & two pieces of 20x4mm flat on both the vertical sides be fixed as hold fast. The operation of manufacturing shall including cutting of Hard-drawn steel wire fabric square mesh of 3.0mm wire and 25mm pitch, Angle Section & welding of wire mesh, angle with 20x4mm flats on all four sides and applying a priming coat of steel primer after pretreatment of surface to the entire satisfaction of the Engineer-in-Charge. |
| 32 | Providing and fixing Oxidised MS sliding door bolts with bolts and nuts screws etc.complete 250 x 16 mm in all leads and lifts. |
| 33 | Providing and fixing Cleats with nuts to rest a pintless complete in all leads and lifts. sliding door bolts with bolts and nuts screws etc.complete 250 x 16 mm in all leads and lifts. |
| 34 | Steel work built up section,trusses and framed work ,including cutting hoisting and fixing in position and applying a priming coat of red lead paint:- In gratings framed guard bars,ladders ,railing brackets and similar works in all leads and lifts. |
| 35 | Providing, supplying, installation, testing and commissioning of submersible sewage pump set (Non clog) with suitable motor of reputed make & model having discharge capacity of 3.00 LPS against 15 mtr. head for emptying domestic septic tanks complete in all respects i/c electrical and machenical allied accessories and to the entire satisfation of Engineer-in-Charge. |
| 36 | Providing, lowering, laying and jointing HDPE pipe (confirming to IS 4984-2016) in proper position by butt fusion joining procedure including hydraulic testing as per relevant IS Code, complete with all material for joining procedure like butt fusion welding machine with hydraulic jack, top loading clamp etc. pump and accessories for hydraulic testing and all labours as directed by engineer in charge (50 mm HDPE for House connection (14 No. HH) 60-meter per HH) |
| 37 | Annual comprehensive maintenance contract of sewage pumping station located at Indira Market 0.18 MLD cap. for 3 years i/c pumps, motors, panel,volves and associated electro mechenical equipment complete in all respects and to the entire satisfation of Engineer-in-Charge. |
| 38 | For 1st Year |
| 39 | For 2nd Year |
| 40 | For 3rd Year |
| 41 | Annual comprehensive maintenance contract of sewage pumping station located at Bijani 3.00 MLD cap. for 3 years i/c pumps, motors, panel,volves and associated electro mechenical equipment complete in all respects and to the entire satisfation of Engineer-in-Charge. |
| 42 | For 1st Year |
| 43 | For 2nd Year |
| 44 | For 3rd Year |
| 45 | Providing and installation of DG Set Three Phase 15 Kva for Wet well Bijni & Indira Market complete in all respects and to the entire satisfation of Engineer-in-Charge. |
| 46 | Providing, Supplying, Testing & Commissioning of Trailer mounted Sewer Jetting Machine equipped with jetting pump of repeted make having discharge of 50 LPM and pressure range 120-150 Base mounted with 10 HP petrol engine, jetting hose pipe of suitable dia and 80m length, spported by Pneumatic tyres completed in all respects and to the entire satisfation of Engineer-in-Charge. Please Enable Macros to View BoQ information Terms and conditions |
| 47 | The work shall be executed as per HPIPH specifications, CPHEEO manual with latest amendments on sewerage and sewage treatment, relevant IS codes and to the entire specification of the Engineer-in-Charge. |
| 48 | All rates should be inclusive of all taxes i/c G.S.T. |
| 49 | Security, Income tax ,G.S.T, labour cess and surcharge as applicable under various clauses of form PWD 6&12 will be deducted from the each running bill of the contractor by Executive Engineer under building and other construction for workers welfare cess act 1996. |
| 50 | The Cement & steel shall be issued by the department from JSV Divisional Store Raghunath Ka Padhar Mandi Cement @ 354/- per bag, Steel Rs.7320/-only per qtl. against proper indent thereafter carriage of material to the site of work and storage/ watch and ward of issued material shall be responsibility of the contractor in all leads and lifts by all means of transport shall be born by the contractor. |
| 51 | The DI Pipe Shall be provided by the Contractor at their own Cost. |
| 52 | All machineries/equipments required for laying/hoisting of pipe line will be arranged by the contractor/firm at its own cost and nothing extra shall be paid on this account. |
| 53 | The firm shall make all the arrangement for working during night hours at its own cost. |
| 54 | The rates of all the items shall be inclusive of the carriage of all the materials to charged all leads and lifts to the site of work. |
| 55 | Only crushed well graded stone aggregate shall be allowed in concrete |
| 56 | The final payment will be made to the contractor after testing/completion of work. |
| 57 | The firm/contractors has to submit its working schedule of various components by proposing/completion target dates of each component and adhered to these target strictly. also get it approved from Engineer-in-charge. before start of the work. |
| 58 | Nothing shall be paid for rejected work/material |
| 59 | The firm/ contractor will test run the wet well for one month free of cost after completion of same before start of O & M period. |
| 60 | No deviation shall be allowed without the prior permission of the Engineer-in-charge. |
| 61 | The firms shall carry out testing and commissioning of wet well as per the direction of Engineer-in-Charge and after commissioning , the firm/contractor shall run the system before handing over to the department. |
| 62 | In case sewage is not available for test running and commissioning of wet well with in three months after the completion then the firm/contractor shall test the structures/pipes for water tightness in the presence of Executive Engineer In-charge and work shall deemed to be complete. |
| 63 | After the award of work the firm shall submit the detailed structural design of wet well and panel room along with drawings for approval by the department. |
| 64 | To provide D.I. pipe \\"HP JSV\\" engraved on each pipe after every one meter of Jindal / Tata/ Electro steel make as per NIT specifications and to the entire satisfaction of the Engineer-in-Charge. |
| 65 | To carry out the third party inspection from approved agencies ie. RITES, DNV, BUREAU VARITAS, QSS, EDLIPSE, Engineering Global Private Ltd. in the presence of representative of Vibhag within my quoted rates and nothing shall be claimed extra. (Other Terms Conditions Attached Separately). |
| 66 | The firm shall forward a copy of supply order/indent placed by it for the supply of pumps and motors on the manufactures/authorized dealers of the pump and motors to the consignee within 30 days after issue of the letter of indent/award by the Engineer-in-Charge . |
| 67 | The firm shall arrange dispatch of offered pumps and motors to the consignee direct from the manufacturers /their authorized dealers of the pumping machinery for which the supply order/indent has been placed by the firm. The packing slip should indicate the details of materials in the package and material of construction of pumps and motors. |
| 68 | The shop test for the pumps and motors shall be carried out at manufacturers works in the presence of representative of the department as per IS-325-1978.The test performance certificate of the pumping machinery shall be arranged by the firm from the manufacturers and get it approved from the Engineer-in-charge before actual dispatch of the pumping machinery |
| 69 | The firm shall supply the recommended list of spares and quantities required for normal working of pumping machinery(2 years) from the manufacturers of the aforesaid equipment at the time of quoting rates and shall quote items rates for the same also. |
| 70 | The firm shall supply the manufacturers manual for the operation and maintenance of the pumping equipments. |
| 71 | The firm shall arrange operation and maintenance training to the operating staff for the pumping machinery (with out extra cost) for a period of 7 days i.e. during the testing period. |
| 72 | The firm shall supply layout drawing in respect of various components ,such as suction pipes, valves, cable trenches, control panel etc. |
| 73 | The wiring and installation of electric equipment shall be as per HPSEB rules and regulations and subjected to the approval of the Chief Electrical Inspector and or his authorized officer. Any defect pointed out shall be rectified by the firm without any extra cost. The wiring and installation of all electrical equipment shall be done by a licensed contractor of approved class of HPSEB authorities on their approved format (form D)for release of power connection by the firm without extra cost. |
| 74 | The temporary electric connection, if required during installation shall be arranged by the firm at its own cost and energy charges shall also be paid directly by the firm to the HPSEB. |
| 75 | Prices of all items shall be F.O.R. site of work inclusive of all leads and lifts and shall be inclusive of all charges of transportation, insurance, packing, taxes and duties such as sale tax, excise duty, local taxes etc. |
| 76 | The rates shall be quoted only on the format of schedule of quantities, which is attached with the tender document giving all specified data so desired therein. |
| 77 | The rates offered for the specified makes in the schedule of quantities only shall be considered .Rates quoted for part or non specified makes shall lead to rejection of the tender. |
| 78 | The location of site can be ascertained from the concerned Assistant Engineer, and the rates quoted by the firm shall be inclusive of all mechanical and manual transport within all leads and lifts to the site of work. |
| 79 | All the equipment/ material shall conform to the relevant BIS specifications, wherever applicable and in its absence to any accepted National/International standards. |
| 80 | All the equipments shall be guaranteed against any manufacturing defect including metallurgy and its performance for a period of 12 (twelve)months from the date of commissioning. Any defect, if noticed within the stipulated period shall be rectified by the firm at its own cost within 15 days of bringing the same to its notice. The guarantee clause shall be substantiated by a guarantee bond of a Nationalized Bank for an amount equal to the cost of pumping and electrical equipment (accessories included)pledged in the name of the Executive Engineer-in-Charge at the time of applying for refund of security deposits. The guarantee bond shall be released after the expiry of the guarantee period. |
| 81 | The installed pumping machinery and other allied accessories shall be tested daily for stipulated pumping hours in the NIT (20 Hours) for a period of seven days without extra cost. However the cost of electricity and water shall be borne by the department. |
| 82 | During the guarantee period efficiency of the pumping and the electric equipment should not vary beyond the range(+/-)2.5%. If during guarantee period, the efficiency falls beyond 2.5% to a maximum of 5%,1% cost of the pump set for 1% fall of the efficiency shall be deducted. In case of fall of efficiency beyond 5% the pump set shall be rejected and cost of the effected pump set recovered from the pledged Bank guarantee and or from the security deposit as the case may be. |
| 83 | 90% (Ninety percent) payment of the cost of pumping machinery and equipment less 10% security and other statutory recovery shall be made after receipt of complete pumping machinery i.e. pump and motors along with accessories received together at site of work in good condition. The balance 10% cost after deduction of the security and other recoveries shall be released after successful and satisfactory installation ,testing of entire equipment. Ten percent security deposits shall be released as stipulated in the agreement. |
| 84 | 90% (Ninety percent) installation charges shall be released after satisfactory installation of all the pumping and electrical equipment. Remaining 10% of installation charges shall be released after testing of the entire equipment . |