| 1 | Dismantling of Dawar road surfaces for laying of pipe line and house connection work including sorting out of serviceable materials and disposal of unserviceable materials. (Rate of Jal Nigam) |
| 2 | Earth work in soil mixed with kankar/shingle/moorum with lift upto 1.5m and lead upto 50m, filling, watering and ramming of excavated earth upto the trenches and disposal of surplus earth upto 50m.(Rate of Jal Nigam |
| 3 | Dismantling of interlocking tiles road surfaces for laying of pipe line and house connection work including sorting out of serviceable materials and disposal of unserviceable materials. (Rate of Jal Nigam) |
| 4 | Earth work in soil mixed with kankar/shingle/moorum with lift upto 1.5m and lead upto 50m, filling, watering and ramming of excavated earth upto the trenches and disposal of surplus earth upto 50m.(Rate of Jal Nigam) |
| 5 | Supply & Fixing of D.I 300/k-7 Pipe Confirming to ISI made working pressure including testing all complete. |
| 6 | Supply & fixing of pipe specials (Bend, Elbow, Tee, reducer, Shokit, endcap etc.) |
| 7 | Laying & Jointing of 300mm & 300mm D.I Pipe Line with all labour,T&P Complete.(Rate of Jal Nigam) |
| 8 | Inter connection in old existing pipe line to 110mm new layed pvc pipe line including Skilled Fitter, labour, T&P complete.(MR) |
| 9 | Nala Crossing Work in including labour t&p complete.Requare for proper completion of work. |
| 10 | Relaying of old tiles 80mm molded incl. labour, T&P complete. (PWD DSR S.No.-17 New Item page no.-56)2023 |
| 11 | Supply & laying of I shaped (zigzag) precast interlocking tiles of thickness 80mm including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work.(PWD S.no. 14, page no.54)2022 |
| 12 | Re-instatement of cc. road surfaces after laying of pipe line and house connection incl. supply of all materials, T&P etc, required for proper completion of work as per direction of eingineer-in-charge. the quantity of re-instatement has been increased by thirty percent in the view of additional damaged of dismantled road due to traffic / vehicle movement. (Jal Nigam Agra) |
| 13 | Barricading of site for public safety with all required Meterial, labour, T&P all complete |
| 14 | Site level & clean all malwa cartage including all labour T&P complete (MR) |
| 15 | Unseen Work During Laying of Pipe Line |
| 16 | GST 18% Please Enable Macros to View BoQ information |