| 1 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge In cement mortar |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer- in charge 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead.Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil: |
| 4 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil |
| 5 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 mt in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil |
| 6 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement: 6 coarse sand) Quarry including all carriages. |
| 7 | Random Rubble masonry with hard stone in foundation and plinth Including leveling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement: 6 coarse sand) Quarry |
| 8 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 ement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete |
| 9 | Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) flush pointingwall |
| 10 | Supplying and filling of earth (including royalty) also including ramming and watering of the earth in layers not exceeding 20 cm. at site (earth measured in stacks will be reduced by 10% for payment |
| 11 | Carriage of materials from the approved sources to work site by mechnical Transport |
| 12 | Providing and fixing of CIB including photographs Please Enable Macros to View BoQ information |