| 1 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 2 | Dumping stone excluding cost of stones. |
| 3 | In Horizontal on level |
| 4 | On Slopes (Behind pitching) |
| 5 | Opening out old wire crates those and re-binding after filling. |
| 6 | Supply of Stone boulder (nallah) nominal size 225 mm |
| 7 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. |
| 8 | loading/unloading sand/earth filled bags in lorries/boats lead upto 50 Mtr |
| 9 | Unloading sand/earth filled bags for placing from boats/lorries |
| 10 | Placing in dry |
| 11 | Placing in Water |
| 12 | Engagement of Labourer (Skilled) |
| 13 | Engagement of Labourer (Unskilled) |
| 14 | Engagement of Boatman |
| 15 | Engagement of Boat (Capacity Upto 2.000 Cum) |
| 16 | Engagement of Cutting Saw Machine Including POL and Operator(Complete) |
| 17 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) |
| 18 | Supplying and Stacking of Stone Dust at Site Including Royality(Complete) |
| 19 | Supplying and Stacking of Sand at Site Including Royality(Complete) |
| 20 | Engagement of JCB including POL and driver complete for variou canal operations including removal of encroachments |
| 21 | Idle Chrages |
| 22 | Engagement of Poclain/L&T-220(Chain Driven ) Including POL and driver Complete. |
| 23 | Idle Chrages |
| 24 | Engagement of Poclain/L&T-110/70/60 (Chain Driven ) Including POL and driver Complete. |
| 25 | Idle Chrages |
| 26 | Hire Charges of Contract Carrier (vehicle) Like Sumo/Scorpio/Tawera during day or night alongwith licensed comercial driver for site inspection/Emergency Situations/ movement of officials within the Divisional jurisdiction including Driver and POL on need basis only within an average of 20Km's Journey or a Part thereof (complete). |
| 27 | For additional Lead of every Km beyond 20Km Lead |
| 28 | Providing wood work in frames of false ceiling, partitions, flumes etc, sawn and fixed in position including all sorts of carriages and other incidentals /accessories etc (Complete Job). Poplar Wood |
| 29 | Providing refreshment to supervisory staff for restoration of water during night /day or the participants of the Independence Day , Republic day or other official Functions complete job including packing at venue with following Menu : |
| 30 | Water Bottle One litre. |
| 31 | Boiled Egg. |
| 32 | Dal 50 g Pack. |
| 33 | Banana. |
| 34 | Tea Sugar each Cup. |
| 35 | Tea Namkeen each Cup. |
| 36 | Butter Toast |
| 37 | Bread Slice |
| 38 | Normal Chicken Biryani |
| 39 | Veg Fried Rice/Biryani Veg |
| 40 | Chicken Kanti With Naan |
| 41 | Mutton Kanti With Naan |
| 42 | Normal Mutton Kabab |
| 43 | Plain Rice Plate |
| 44 | Mutton (Rogan josh)/Rista/Gustaba etc. |
| 45 | Engagement of Contract Carrier for carriage of material within jurisdiction including Driver and (POL) if and when needed Upto an average lead of 20Km's Journey or a part thereof. (Complete)a) Tata Mobile Having a load carrying capacity of 1MT. |
| 46 | For additional Lead of every Km beyond 20Km Lead |
| 47 | Providing and fixing of ply board (BWR) with nails and screws etc, including all sorts of the carriages upto the site of work as per the direction and to the entire satisfaction of Engineer In Charge (Complete Job) |
| 48 | Carriage of material from Approved Source up to dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport |
| 49 | Crates for an avg. lead upto 01 Kms |
| 50 | Crates for an avg. lead upto 02 Kms |
| 51 | Crates for an avg. lead upto 03 Kms |
| 52 | Crates for an avg. lead upto 04 Kms |
| 53 | Crates for an avg. lead upto 05 Kms |
| 54 | Crates for an avg. lead beyond 5 Kms upto 10 Kms (per Km) |
| 55 | Crates from an avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 56 | Crates from an avg. lead beyond 20 Kms per additional Km |
| 57 | Sand/20mm Agg/Stone Dust for an average lead of upto 01 Kms |
| 58 | Sand/20mm Agg/Stone Dust for an average lead upto 02 Kms |
| 59 | Sand/20mm Agg/Stone Dust for an average lead upto 03 Kms |
| 60 | Sand/20mm Agg/Stone Dust for an average lead upto 04 Kms |
| 61 | Sand/20mm Agg/Stone Dust for an average lead upto 05 Kms |
| 62 | Sand/20mm Agg/Stone Dust for an average lead beyond 5 Kms upto 10 Kms (per Km) |
| 63 | Sand/20mm Agg/Stone Dust for an average lead beyond 10 Kms upto 20 Kms (per Km) |
| 64 | Sand/20mm Agg/Stone Dust for an average lead beyond 20 Kms per additional Km |
| 65 | Earth for an avg. lead of upto 01 Kms |
| 66 | Earth for an avg. lead upto 02 Kms |
| 67 | Earth for an avg. lead upto 03 Kms |
| 68 | Earth for an avg. lead upto 04 Kms |
| 69 | Earth for an avg. lead upto 05 Kms |
| 70 | Earth for an avg. lead beyond 5 Kms upto 10 Kms (per Km) |
| 71 | Earth for an avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 72 | Earth for an avg. lead beyond 20 Kms per additional Km |
| 73 | Empty Cement Bags for an avg. lead of upto 01 Kms |
| 74 | Empty Cement Bags for an avg. lead upto 02 Kms |
| 75 | Empty Cement Bags for an avg. lead upto 03 Kms |
| 76 | Empty Cement Bags for an avg. lead upto 04 Kms |
| 77 | Empty Cement Bags for an avg. lead upto 05 Kms |
| 78 | Empty Cement Bags for an avg. lead beyond 5 Kms upto 10 Kms (per Km) |
| 79 | Empty Cement Bags for an avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 80 | Empty Cement Bags for an avg. lead beyond 20 Kms per additional Km |
| 81 | Stone avg. lead of upto 1 Km |
| 82 | Stone avg. lead upto 2 Kms |
| 83 | Stone avg. lead upto 3 Kms |
| 84 | Stone avg. lead upto 4 Kms |
| 85 | Stone avg. lead upto 5 Kms |
| 86 | Stone avg. lead beyond 05 Kms upto 10 Kms (per Km) |
| 87 | Stone avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 88 | Stone avg. lead beyond 20 Kms per additional Km |
| 89 | Extra Carriage of material from dumping site to actual site of work, including loading, unloading and stacking etc. complete by manual labour |
| 90 | stones for an avg. lead upto 50 mtr. |
| 91 | stones for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 92 | Sand/20mm Agg/Stone Dust for an average lead upto 50Mtr |
| 93 | Sand/20mm Agg/Stone Dust for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 94 | Earth for an average lead upto 50Mtrs |
| 95 | Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 96 | Empty Cement bags for an average lead upto 50Mtrs |
| 97 | Empty Cement bags for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 98 | Crates for an average lead upto 50Mtrs |
| 99 | Crates for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 100 | Providing and fixing of Sign boards/ Flex banners of required size as per the directions of Engineer In-charge attached with light wieght square section Mild steel frame including all sorts of carraige complete. Please Enable Macros to View BoQ information |