| 1 | Engagement of Labours for Site Clearance |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Providing & laying of 200mm Dia PVC pipes of prince make Grade B including excavation & refilling complete job as directed at site including carriages upto site of work. |
| 7 | Providing & laying of 100mm Dia PVC pipes of prince make Grade B including excavation & refilling complete job as directed at site including carriages upto site of work. |
| 8 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete welded |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Centring and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form work for Suspended floors, roofs, landings, balconies and access platforms Shelves (cast-in-situ) |
| 13 | Removal of Malba/Unhygienic material/mud from the site including its disposal beyond Municipal limits by Mechanical Transport including all carriages leads & lifts complete job as directed at site |
| 14 | Carriage of Mechenical Transport for sand |
| 15 | Carriage of Mechenical Transport for Stone Aggregate Please Enable Macros to View BoQ information |