|
| 1 | Clearing grass and removal of rubbish up to a distance of 50Mtr. Outside the periphery of the area etc. & L.W.cess to complete the item of work in all respect as per the direction of the Engineer-in-charge. (Excluding GST) |
| 2 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within a lead of 5.00km. on properly prepared and scientifically approved surface including spreading and leveling the earth in 22.5cm.in layers to make ready for watering and ordinary compaction with P.R.R.(8-10 Ton) including construction & maintenance of haul road with royalty & hire charges of P.R.R. and L.W.Cess to complete the item of work in all respect as per the direction of Engineer-in-charge.(Borrow area are to be arranged by the agency at his own cost & responsibility & measurement will be made after finished level section).Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) |
| 3 | Earth work for excavation of foundation in hard soil including dressing and leveling the bed and depositing the excavated materials away from the working area for filling at required places with all leads, lifts & delifts including all labour T&P L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge. (Excluding GST) |
| 4 | Filling , foundation & plinth with sand well watered and rammed including all labour T&P cost, carriage, royality & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge.Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) |
| 5 | Cement Concrete M-15 Grade using 40mm. size down graded crusher broken hard granite good quality chips free from weathered skin and any other deleterious materials using screened and washed coarsed sand from approved quarry and Portland cement of ISI standard and grade as approved by the Deptt. including watering for curing for speficied days and all labour T&P cost,carriage,royality & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge.Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) |
| 6 | Cement Concrete M-15 Grade using 20mm. size down graded crusher broken hard granite good quality chips free from weathered skin and any other deleterious materials using screened and washed coarsed sand from approved quarry and Portland cement of ISI standard and grade as approved by the Deptt. including watering for curing for speficied days and all labour T&P cost,carriage,royality & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge.Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) |
| 7 | Rigid smooth centering & shuttering for Cement concrete works including false work and dismantling them after required days of casting including all cost labour T&P carriage & L.W.cess to complete the item of work in all respect as per the direction of the Engineer-in-charge. (Excluding GST) |
| 8 | Supplying,fitting, fixing & laying 900mm. dia N.P-3 R.C.C. H.P.with collars jointed with cement mortar (1:3) including cost, carriage & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge. (Excluding GST) |
| 9 | Filling foundation & plinth with excavated materials at the required places including watering & ramming with all leads & lifts including an labour T&P & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge Including (Excluding GST) |
| 10 | Collecting & supplying of good quality laterite moorum & sand from approved quarry & stacking at work site in regular box heaps of size 1.50m.x1.50m.x0.50m. to be measured as 1.00 Cum for pre-measurement including cost, carriage, royality,L.W.Cess and conveying from stacks for admixing moorum & sand in ratio (70:30) and spreading admixed moorum & sand on road laying in layers to proper camber not exceeding 100mm.thick including all labour, watering and turfedging with all leads ,lifts and hire and running charges of PRR complete as per the direction of the Engineer-in-Charge Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) |
| 11 | Collecting & supplying of approved quality IRC GR-II(63mm to 45mm) of metal from approved quarry & stacking at work site in regular stacks of 1.50×1.50×0.50m. to be measured as one cum. for pre-measurement including cost , carriage, royality all materials including conveying from stacks laying spreading & compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing rolling with 3 whelled steel roller 8-10 Tonnes in stage to proper grade & camber, applying & brooming requisite type screening / binding materials to fill up the interstices of coarse aggregates watering & compacting to the required density as per clause 404 of MOSRT & H. specification of road & bridge works(5th Revision) including all labour T&P hire & running charges of all machineries & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-Charge.Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) |
| 12 | Collecting & supplying of approved quality IRC GR-III(53mm to 22.40mm) of metal from approved quarry & stacking at work site in regular stacks of 1.50×1.50×0.50m. to be measured as one cum. for pre-measurement including cost , carriage, royality all materials including conveying from stacks laying spreading & compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing rolling with 3 whelled steel roller 8-10 Tonnes in stage to proper grade & camber, applying & brooming requisite type screening / binding materials to fill up the interstices of coarse aggregates watering & compacting to the required density as per clause 404 of MOSRT & H. specification of road & bridge works(5th Revision) including all labour T&P hire & running charges of all machineries & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-Charge.Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) |
| 13 | Collecting & supplying of good quality laterite moorum from approved quarry & stacking at work site in regular box heaps of size 1.50m.x1.50m.x0.50m. to be measured as 1.00 Cum for pre-measurement including cost, carriage, royality,L.W.Cess and conveying from stacks for moorum and spreading on road laying in layers to proper camber not exceeding 100mm.thick including all labour, watering and turfedging with all leads ,lifts and hire and running charges of HRR complete as per the direction of the Engineer-in-ChargeIncluding Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) Please Enable Macros to View BoQ information |