| Sl. No. | Item Description |
| 1 | Part A- Cost of Material For 11KV DP Without AB Switch - 2 No. |
| 2 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all kind of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 3 | Supply & installation of Top Channel(GI) 100X50 X6mm, 9.56 KG/Mtr., each channel(GI) length 2.3 mtr.,2 no's channel(GI) required =(2x9.56x2.3). Complete in all respect as per the approved technical specification and direction of EIC. |
| 4 | Supply & installation of Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr.,each 0.280 mtr. length,6 no's required =(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 5 | Supply & installation of Double Pole Belting Channel(GI) 75X40X4.8mm.,7.14KG/Mtr.,each channel(GI) length 1.66 Mtr., 4 no's channel(GI) required = (7.14x1.66x4). Complete in all respect as per the approved technical specification and direction of EIC. |
| 6 | Supply and installation of 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle(GI) length 2.671 mtr.,4 nos angle(GI) required = (4.5x2.67x4).Complete in all respect as per the approved technical specification and direction of EIC. |
| 7 | Supply and installation of Danger Plate,2 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 8 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's= (2x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 9 | Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 10 | Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC. |
| 11 | Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC. |
| 12 | Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 13 | Supply & installation of GI Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 14 | Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., ( 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 5x2.36. Complete in all respect as per the approved technical specification and direction of EIC. |
| 15 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required = (2 x 3 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 16 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 8 no's =(8x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 17 | SITC of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 18 | Supply & installation of H W fitting(B&S) 70KN,3 Bolt Complete in all respect as per the approved technical specification and direction of EIC. |
| 19 | SITC of Disc insulator (B&S) 70KN polymer.Complete in all respect as per the approved technical specification and direction of EIC. |
| 20 | Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 21 | Supply & installation of IPC for 100 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 22 | Supply & installation of Spike (GI) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 23 | Supply & installation of Gl Nut, Bolt & Washer of different sizes (12.261 Kg each DP without AB Switch). Complete in all respect as per the approved technical specification and direction of EIC. |
| 24 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 25 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 26 | Part A- Cost of Civil Works. |
| 27 | Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing , Standard & as per the direction of EIC. |
| 28 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 29 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 30 | Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design.Complete in all respect as per the direction of EIC. |
| 31 | Part B- Cost of Material For 11KV DP With AB Switch - 5 No. |
| 32 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 33 | Supply & installation of Top Channel(GI) 100X50 X6mm, 9.56 KG/Mtr., each channel(GI) length 3 mtr.,2 no's channel(GI) required =(2x9.56x3). Complete in all respect as per the approved technical specification and direction of EIC. |
| 34 | Supply & installation of Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr.,each 0.280 mtr. length,6 no's reguired =(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 35 | Supply & installation of AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each channel(GI) length 3 Mtr., 2 no's channel(GI) required =(7.14x3x2).Complete in all respect as per the approved technical specification and direction of EIC. |
| 36 | Supply & installation of AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each channel(GI) length 0.35 mtr., 2 no's channel(GI) required =(9.56x2x0.35).Complete in all respect as per the approved technical specification and direction of EIC. |
| 37 | Supply & installation of Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr, each channel(GI) length 0.8 Mtr..1 no's channel(GI) required =(7.14x0.8x1).Complete in all respect as per the approved technical specification and direction of EIC. |
| 38 | Supply & installation of Double Pole Belting Channel(GI) 75X40X4.8mm.,7.14KG/Mtr.,each channel(GI) length 3.0 Mtr., 4 no's channel(GI) required = (7.14x3x4). Complete in all respect as per the approved technical specification and direction of EIC. |
| 39 | Supply and installation of 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle(GI) length 3.512 mtr.,4 nos angle(GI) required = (4x4.5x 3.512).Complete in all respect as per the approved technical specification and direction of EIC. |
| 40 | Supply and installation of Danger Plate,2 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 41 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's= (2x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 42 | Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 43 | Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC. |
| 44 | Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC. |
| 45 | Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 46 | Supply & installation of GI Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 47 | Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36. Complete in all respect as per the approved technical specification and direction of EIC. |
| 48 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required = (2 x 3 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 49 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 8 no's =(8x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 50 | SITC of Lightning Arrester (12KV,10KA) (Station Class,class-2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 51 | SITC of AB Switch (11KV,400A, 3pole,50Hz). Complete in all respect as per the approved technical specification and direction of EIC. |
| 52 | SITC of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 53 | Supply & installation of H W fitting(B&S) 70KN,3 Bolt Complete in all respect as per the approved technical specification and direction of EIC. |
| 54 | SITC of Disc insulator (B&S) 70KN polymer.Complete in all respect as per the approved technical specification and direction of EIC. |
| 55 | Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 56 | Supply & installation of IPC for 100 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 57 | Supply & installation of Spike (GI) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 58 | Supply & installation of Gl Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch). Complete in all respect as per the approved technical specification and direction of EIC. |
| 59 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 60 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 61 | Part B- Cost of Civil Works. |
| 62 | Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing , Standard & as per the direction of EIC. |
| 63 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 64 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 65 | Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design.Complete in all respect as per the direction of EIC. |
| 66 | Part C- Cost of Materials for 11KV Cut Point With 180 Degree Angle - 3 No. |
| 67 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 68 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 2no's channel(GI) required =( 2x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 69 | Supply & installation of Fish Plate(GI) 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,8 no's required =(8x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 70 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel(GI) length 0.306 mtr. 2no's channel(GI) required =(2x9.56x0.306). Complete in all respect as per the approved technical specification and direction of EIC. |
| 71 | Supply and installation of Danger Plate,1 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 72 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 73 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 74 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 75 | Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 76 | Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the specification and direction of EIC. |
| 77 | Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 78 | Supply & installation of Earthing of support(Coil Type). Complete in all respect as per the approved technical specification and direction of EIC. |
| 79 | Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr- 2Mtr for connecting pole with coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 80 | Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 81 | Supply & installation of IPC for 100 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 82 | Supply & installation of Spike (GI) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 83 | Supply & installation of GI Nut, Bolt & Washer of different sizes (3.55 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 84 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 85 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 86 | Part C- Cost of Civil Works. |
| 87 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 88 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 89 | Part D- Cost of Materials for 11 KV Cut Point with 90 Degree Angle- 5 No. |
| 90 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 91 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 4no's channel(GI) required =( 4x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 92 | Supply & installation of Fish Plate(GI) 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,16 no's required =(16x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 93 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel(GI) length 0.306 mtr. 4no's channel(GI) required =(4x9.56x0.306). Complete in all respect as per the approved technical specification and direction of EIC. |
| 94 | Supply and installation of Danger Plate,1 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 95 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 96 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 97 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 98 | Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 99 | Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the approved technical specification and direction of EIC. |
| 100 | Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 101 | Supply & installation of Earthing of support(Coil Type). Complete in all respect as per the approved technical specification and direction of EIC. |
| 102 | Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr- 2Mtr for connecting pole with coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 103 | Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 104 | Supply & installation of IPC for 100 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 105 | Supply & installation of Spike (GI) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 106 | Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 107 | Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC. |
| 108 | Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC. |
| 109 | Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 110 | Supply & installation of GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 111 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 112 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 113 | Part D- Cost of Civil Works. |
| 114 | Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing , Standard & as per the direction of EIC. |
| 115 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 116 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 117 | Part E- Cost of Materials for 11 KV Pin Points With WPB - 2.72 CKM. |
| 118 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mtr)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. ComComplete in all respect as per the approved technical specification and direction of EIC. |
| 119 | Supply & installation of 11KV V cross Arm(GI) (10.2 Kg. each). Complete in all respect as per the approved technical specification and direction of EIC. |
| 120 | Supply & installation of Top bracket 100x50X6 mm Gl channel (2kg each).Complete in all respect as per the approved technical specification and direction of EIC. |
| 121 | Supply & installation of Danger Plate,1 no's. for each pole. Complete in all respect as per the approved technical specification and direction of EIC. |
| 122 | Supply & installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's =(1x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 123 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 124 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr Iength 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 125 | Supply & installation of 11 KV pin insulator polymer, 3 Nos. required for each support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 126 | Supply & installation of Earthing of Support Coil Type. Complete in all respect as per the approved technical specification and direction of EIC. |
| 127 | Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 128 | Supply & installation of GI Nut, Bolt & Washer of different sizes (1.45 Kg/ Pin Point). Complete in all respect as per the approved technical specification and direction of EIC. |
| 129 | Supply & Stringing of 100 SQ.MM AAAC XLPE Covered Conductor. Complete in all respect as per the approved technical specification and direction of EIC. |
| 130 | Supply & installation of Midspan joint for 100 SQ.MM AAAC XLPE Covered Conductor - 11 KV.Complete in all respect as per the approved technical specification and direction of EIC. |
| 131 | Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 132 | Supply & installation of Spike (GI) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 133 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 134 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 135 | Part E- Cost of Civil Works. |
| 136 | Concreting ratio 1:1.5:3 (500mmX500mm X1800mm) = 0.45Cu.mtr(Per pole).Complete in all respect as per the direction of EIC. |
| 137 | Couping ratio 1:1.5:3 with dimension (500X 500X450)= 0.1125 Cu mtr(Per pole).Complete in all respect as per the direction of EIC. |
| 138 | Part F- Cost of Supply Of Materials. |
| 139 | Supply of materials for 11kV, 3Core, 400sqmm Aluminium, XLPE insulation armoured UG cable with accessories. |
| 140 | Length of 11kV 3C, 400sqmm cable (Open trench) |
| 141 | Supply of 11kV, 3Core, 400sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA- 15kA) as per the approved technical specification and direction of EIC. |
| 142 | Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 400 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC. |
| 143 | Supply of materials for High Density Polyethelene (HDPE) pipe 200mm diameter, PE 80- PN8 for laying of 11kV UG cable. as per the approved technical specification and direction of EIC. |
| 144 | Part F- Cost of Erection Of Materials. |
| 145 | Erection, Commissioning, Testing of 11kV new line by 3core, 400sqmm, aluminium, XLPE UG cable. |
| 146 | Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm XLPE insulation (extruded type) UG cable by open trench method. as per direction of EIC. |
| 147 | Erection of Straight through jointing Kits/ Outdoor termination kits/Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kits. as per direction of EIC. |
| 148 | Laying of 200mm dia PE 80-PN8, HDPE pipe inside open trench.as per direction of EIC. |
| 149 | Part F- Cost of Civil Works. |
| 150 | Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench |
| 151 | Earth work excavation of soil (1mtr. width X 1mtr. depth)- Route Length |
| 152 | Earth work excavation of soil. complete as per the direction of EIC. |
| 153 | Earth work excavation of hard rock. complete as per the direction of EIC. |
| 154 | Back flling with excavated soil outside and above the trench. complete as per the direction of EIC. |
| 155 | Damage of asphalt/tar road and other utilities andreconstructing to bring to its original shape after laying of cable in open trench (1mtr. width). complete as per the direction of EIC. |
| 156 | Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.) as per the direction of EIC. |
| 157 | Supply and erection of cable Route Marker along the cable route at an interval of 30 mtrs with civil works as per the direction of EIC. |
| 158 | Part G- Cost of meterial for Plinth mounted DSS (11/0.4 KV, 250 KVA DSS) - 01 Nos |
| 159 | Supply and Installation of WPB Pole 160x152 (11mtr long , 30.44KG/MTR)-DP(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58). Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC. |
| 160 | Supply and Installation of 9 Mtr long 300 KG PSC Pole. Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC. |
| 161 | Supply and Installation of Pole clamp for EYE hook for (XLPE Aerial bunched Cable). Complete in all respect as per the approved technical specification and direction of EIC. |
| 162 | Supply and Installation of EYE hook for XLPE Aerial bunched Cable. Complete in all respect as per the approved technical specification and direction of EIC. |
| 163 | Supply and Installation of Dead End Clamp suitable for messenger XLPE Aerial bunched Cable. Complete in all respect as per the approved specification and direction of EIC. |
| 164 | Supply and Installation of LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(Gl) (1000 mm long)(7. 14Kg./Mtr., 6 No's.) (Each 6x1.000 x7.14= 42.84 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 165 | Supply and Installation of Top Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 166 | Supply and Installation of Fish plate(GI) 50x6, 2.36kg/mtr ,each 0.280mtr length, 6 no's required=(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 167 | Supply and Installation of AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI)(3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg).Complete in all respect as per the approved technical specification and direction of EIC. |
| 168 | Supply and Installation of AB Switch Side Support Channel(GI) 100X50X6mm,9.56KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI)required =(9.56x2x0.35). Complete in all respect as per the approved technical specification and direction of EIC. |
| 169 | Supply and Installation of Channel(GI) Support for down Pipe 75X40X 4.8mm. 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1). Complete in all respect as per the approved technical specification and direction of EIC. |
| 170 | Supply and Installation of HG/ DO Fuse Mounting Channel(Gl) 75x40x4.8 mm Gl Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000 x7.14= 42.84 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 171 | Supply and Installation Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI)(810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 172 | Supply and Installation of Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long)(4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 173 | Supply and Installation of Double pole Belting Channel(GI) 75x40x4.8mm,7.14kg/mtr ,each channel(GI) length 3 mtr, 2 no's channel(GI) required= (7.14x3x2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 174 | Supply and Installation 50x50x6mm GI Bracing angle , 4.5kg/mtr, each angle(GI) lenth 3.512 mtr, 2 no's Angle(GI) required=(4.5x3.512x2) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 175 | Supply and Installation of 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For meshformation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutrai, (1.3+4.5)mtr. For DTR Body, 0.50 mtr for LTDB & AB Switch operating handle, 3 mtr, for Fencing) ( Each 65.6x 2.36= 154.81 Kg) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 176 | SITC of 250 KVA, 11/0.4 KV (Cu) Transformer with Tap changer BIS Energy Loss level II, Ammendment-4. Complete in all respect as per the approved technical specification and direction of EIC. |
| 177 | SITC of LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 250 KVA S/S. Complete in all respect as per the approved technical specification and direction of EIC. |
| 178 | SITC of 55 SQ.MM. AAAC XLPE Covered Conductor.Complete in all respect as per the approved technical specification and direction of EIC. |
| 179 | SITC of 1 Cx 630 mm2 LT XLPE Cable(Un-Armoured). Complete in all respect as per the approved technical specification and direction of EIC. |
| 180 | Supply and Installation LT Cable Supporting Channel(GI) 100 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg./Mtr., 2 No's.) (Each2x2x9.56= 28.56 Kg) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 181 | Supply and Installation LT Cable Supproting Angle(GI). 50x50x6mm.Gl 4.5Kg./mtr., eachAngle(GI) length 2 mtr., 4 nos Angle(GI) required = (4.5x4x2) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 182 | Supply of 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured Aluminium UG cable from LTDB to Pole .Complete in all respect as per the approved technical specification and direction of EIC. |
| 183 | SITC of AB Switch (11KV,200A,3pole,50Hz). Complete in all respect as per the approved technical specification and direction of EIC. |
| 184 | SITC of DO. Fuse( 11KV,200A,3Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 185 | Supply and Installation of 20 AMP Fuse Link. Complete in all respect as per the approved technical specification and direction of EIC. |
| 186 | Supply and Installation of WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR. Complete in all respect as per the approved technical specification and direction of EIC. |
| 187 | Supply and Installation of POLYCARBONATE BIRD GUARD. Complete in all respect as per the approved technical specification and direction of EIC. |
| 188 | Supply and Installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 189 | Supply and Installation of HW Fitting(B&S)70KN, 3Bolt. Complete in all respect as per the approved technical specification and direction of EIC. |
| 190 | SITC of Lightning Arrester(12KV,10KA) (Station Class, class-2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 191 | Supply and Installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 192 | Supply and Installation of HT Stay set complete.Complete in all respect as per the approved technical specification and direction of EIC. |
| 193 | Supply and Installation of HT stay clamp(1.9kg/pair). Complete in all respect as per the approved technical specification and direction of EIC. |
| 194 | Supply and Installation of H.T. stay insulater Type-C .Complete in all respect as per the approved technical specification and direction of EIC. |
| 195 | Supply and Installation of 7/10 swg GI Stay wire, Grade- 2 (15Kg/Set). Complete in all respect as per the approved technical specification and direction of EIC. |
| 196 | Supply and Installation of 40 mm Nominal bore GI pipe (medium gauge) earthing devicewith 3 mtr .Long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 197 | Supply and Fixing of GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP). Complete in all respect as per the approved technical specification and direction of EIC. |
| 198 | Supply and Installation of GI Barbed wire/ Anticlimbing device (3Kg /Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 199 | Supply and Installation of Back Clamp for anticlimbing device 25x3 mm. Flat(GI), 0.59Kg /Mtr. Flat(GI)) of 0.510mtr length 8 no's= (8x0.59x0.510).Complete in all respect as per the approved technical specification and direction of EIC. |
| 200 | Supply and Installation of Danger plate 11 KV,2 nos .Complete in all respect as per the approved technical specification and direction of EIC. |
| 201 | Supply and Installation of Back clamp for danger plate 25x3mm, Flat(GI) 0.59kg/mtr, Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 202 | Supply and Installation of Name Plate. Complete in all respect as per the approved technical specification and direction of EIC. |
| 203 | Structure Numbering and Marking |
| 204 | Supply and Painting of Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background as per the direction of EIC. |
| 205 | Supply and Painting of Black Paint(GIS Numbering & Zebra Stripping) for numbering as per the direction of EIC. |
| 206 | Pat -G : Cost of Civil Work |
| 207 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm)=0.450Cu.mtr (Per Pole) (For WPB Pole).Complete in all respect as per the direction of EIC. |
| 208 | Couping ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX450mm)= 0.1125Cu.mtr(Per Pole). Complete in all respect as per the direction of EIC. |
| 209 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (3.5X2.5X0.1)=0.875 Cu. mtr.Complete in all respect as per the direction of EIC. |
| 210 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx 600mmx900mm) using 40mm BHG metal with all labor and material except stay set stay wire stay insulator.Complete in all respect as per the direction of EIC. |
| 211 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr Gl Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC. |
| 212 | Construction of LTDB Plinth.Complete in all respect as per the approved specification and direction of EIC. |
| 213 | Construction of DTR Plinth.Complete in all respect as per the approved specification and direction of EIC. |
| 214 | Laying of 4 Cx 150 mm2 LT XLPE Cable.Complete in all respect as per direction of EIC. |
| 215 | Laying of 1.1kV cable from 400 to 1000 sqmm.Complete in all respect as per direction of EIC. |
| 216 | SITC and Erection of GI Fencing with Gate.Complete in all respect as per the approved specification and direction of EIC. |
| 217 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm)= 0.375Cu.mtr(Per Pole) (For PSC Pole).Complete in all respect as per the direction of EIC. |
| 218 | Supply of AL Lugs suitable for 400 sq mm cable/conductor,Crimping with cable and Fixing/ connecting include supply and erection of PVC Tape as per voltage requirement.Complete in all respect as per the direction of EIC. |
| 219 | Supply of AL Lugs suitable for 150 sq mm cable/ conductor rimping with cable and Fixing/ connecting include supply and erection of PVC Tape as per voltage requirement.Complete in all respect as per the direction of EIC. |
| 220 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly . Supply to be done as per TPCODL Spec and approved make dowells. |
| 221 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 222 | Part H- Cost of meterial for Plinth mounted DSS (11/0.4 KV, 500 KVA DSS) - 02 Nos |
| 223 | Supply and Installation of WPB Pole 160x152 (11mtr long , 30.44KG/MTR)-DP(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58). Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC. |
| 224 | Supply and Installation of 9 Mtr long 300 KG PSC Pole. Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC. |
| 225 | Supply and Installation of Pole clamp for EYE hook for (XLPE Aerial bunched Cable). Complete in all respect as per the approved technical specification and direction of EIC. |
| 226 | Supply and Installation of EYE hook for XLPE Aerial bunched Cable. Complete in all respect as per the approved technical specification and direction of EIC. |
| 227 | Supply and Installation of Dead End Clamp suitable for messenger XLPE Aerial bunched Cable. Complete in all respect as per the approved specification and direction of EIC. |
| 228 | Supply and Installation of LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(Gl) (1000 mm long)(7. 14Kg./Mtr., 6No's.) (Each 6x1.000 x7.14= 42.84 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 229 | Supply and Installation of Top Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 230 | Supply and Installation of Fish plate(GI) 50x6, 2.36kg/mtr ,each 0.280mtr length, 6 no's required=(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 231 | Supply and Installation of AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI)(3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg).Complete in all respect as per the approved technical specification and direction of EIC. |
| 232 | Supply and Installation of AB Switch Side Support Channel(GI) 100X50X6mm,9.56KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI)required =(9.56x2x0.35). Complete in all respect as per the approved technical specification and direction of EIC. |
| 233 | Supply and Installation of Channel(GI) Support for down Pipe 75X40X 4.8mm. 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1). Complete in all respect as per the approved technical specification and direction of EIC. |
| 234 | Supply and Installation of HG/ DO Fuse Mounting Channel(Gl) 75x40x4.8 mm Gl Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000 x7.14= 42.84 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 235 | Supply and Installation Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI)(810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 236 | Supply and Installation of Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long)(4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 237 | Supply and Installation of Double pole Belting Channel(GI) 75x40x4.8mm,7.14kg/mtr ,each channel(GI) length 3 mtr, 2 no's channel(GI) required= (7.14x3x2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 238 | Supply and Installation 50x50x6mm GI Bracing angle , 4.5kg/mtr, each angle(GI) lenth 3.512 mtr, 2 no's Angle(GI) required=(4.5x3.512x2) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 239 | Supply and Installation of 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For meshformation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutrai, (1.3+4.5)mtr. For DTR Body, 0.50 mtr for LTDB & AB Switch operating handle, 3 mtr, for Fencing) ( Each 65.6x 2.36= 154.81 Kg) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 240 | SITC of 500 KVA, 11/0.4 KV (Cu) Transformer with Tap changer BIS Energy Loss level II, Ammendment-4. Complete in all respect as per the approved technical specification and direction of EIC. |
| 241 | SITC of LT Distribution Box with MCCB, Aluminium Busbar for 4 Bay with kit kat fuse for 500 KVA S/S. Complete in all respect as per the approved technical specification and direction of EIC. |
| 242 | SITC of 55 SQ.MM. AAAC XLPE Covered Conductor.Complete in all respect as per the approved technical specification and direction of EIC. |
| 243 | SITC of 1 Cx 630 mm2 LT XLPE Cable(Un-Armoured). Complete in all respect as per the approved technical specification and direction of EIC. |
| 244 | Supply and Installation LT Cable Supporting Channel(GI) 100 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg./Mtr., 2 No's.) (Each2x2x9.56= 28.56 Kg) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 245 | Supply and Installation LT Cable Supproting Angle(GI). 50x50x6mm.Gl 4.5Kg./mtr., eachAngle(GI) length 2 mtr., 4 nos Angle(GI) required = (4.5x4x2) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 246 | Supply of 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured Aluminium UG cable from LTDB to Pole .Complete in all respect as per the approved technical specification and direction of EIC. |
| 247 | SITC of AB Switch (11KV,200A,3pole,50Hz). Complete in all respect as per the approved technical specification and direction of EIC. |
| 248 | SITC of DO. Fuse( 11KV,200A,3Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 249 | Supply and Installation of 30AMP Fuse Link. Complete in all respect as per the approved technical specification and direction of EIC. |
| 250 | Supply and Installation of WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR. Complete in all respect as per the approved technical specification and direction of EIC. |
| 251 | Supply and Installation of POLYCARBONATE BIRD GUARD. Complete in all respect as per the approved technical specification and direction of EIC. |
| 252 | Supply and Installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 253 | Supply and Installation of HW Fitting(B&S)70KN, 3Bolt. Complete in all respect as per the approved technical specification and direction of EIC. |
| 254 | SITC of Lightning Anester(12KV,10KA) (Station Class, class-2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 255 | Supply and Installation of 11 KV pin insutator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 256 | Supply and Installation of HT Stay set complete.Complete in all respect as per the approved technical specification and direction of EIC. |
| 257 | Supply and Installation of HT stay clamp(1.9kg/pair). Complete in all respect as per the approved technical specification and direction of EIC. |
| 258 | Supply and Installation of H.T. stay insulater Type-C .Complete in all respect as per the approved technical specification and direction of EIC. |
| 259 | Supply and Installation of 7/10 swg GI Stay wire, Grade- 2 (15Kg/Set). Complete in all respect as per the approved technical specification and direction of EIC. |
| 260 | Supply and Installation of 40 mm Nominal bore GI pipe (medium gauge) earthing devicewith 3 mtr .Long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 261 | Supply and Fixing of GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP). Complete in all respect as per the approved technical specification and direction of EIC. |
| 262 | Supply and Installation of GI Barbed wire/ Anticlimbing device (3Kg /Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 263 | Supply and Installation of Black Clamp for anticlimbing device 25x3 mm. Flat(GI), 0.59Kg /Mtr. Flat(GI)) of 0.510mtr length 8 no's= (8x0.59x0.510).Complete in all respect as per the approved technical specification and direction of EIC. |
| 264 | Supply and Installation of Danger plate 11 KV,2 nos .Complete in all respect as per the approved technical specification and direction of EIC. |
| 265 | Supply and Installation of Back clamp for danger plate 25x3mm, Flat(GI) 0.59kg/mtr, Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 266 | Supply and Installation of Name Plate. Complete in all respect as per the approved technical specification and direction of EIC. |
| 267 | Structure Numbering and Marking |
| 268 | Supply and Painting of Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background as per the direction of EIC. |
| 269 | Supply and Painting of Black Paint(GIS Numbering & Zebra Stripping) for numbering as per the direction of EIC. |
| 270 | Pat -H : Cost of Civil Work |
| 271 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm)=0.450Cu.mtr (Per Pole) (For WPB Pole).Complete in all respect as per the direction of EIC. |
| 272 | Couping ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX450mm)= 0.1125Cu.mtr(Per Pole). Complete in all respect as per the direction of EIC. |
| 273 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (3.5X3.5X0.1)=1.225 Cu. mtr.Complete in all respect as per the direction of EIC. |
| 274 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx 600mmx900mm) using 40mm BHG metal with all labor and material except stay set stay wire stay insulator.Complete in all respect as per the direction of EIC. |
| 275 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr Gl Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC. |
| 276 | Construction of LTDB Plinth.Complete in all respect as per the approved specification and direction of EIC. |
| 277 | Construction of DTR Plinth.Complete in all respect as per the approved specification and direction of EIC. |
| 278 | Laying of 4 Cx 150 mm2 LT XLPE Cable.Complete in all respect as per direction of EIC. |
| 279 | Laying of 1.1kV cable from 400 to 1000 sqmm.Complete in all respect as per direction of EIC. |
| 280 | SITC and Erection of GI Fencing with Gate.Complete in all respect as per the approved specification and direction of EIC. |
| 281 | Concreting ratio 1:1.5:3(M-20 Grade)(500mmX500mmX1500mm)= 0.375Cu.mtr(Per Pole) (For PSC Pole).Complete in all respect as per the direction of EIC. |
| 282 | Supply of AL Lugs suitable for 400 sq mm cable/conductor,Crimping with cable and Fixing/ connecting include supply and erection of PVC Tape as per voltage requirement.Complete in all respect as per the direction of EIC. |
| 283 | Supply of AL Lugs suitable for 150 sq mm cable/ conductor rimping with cable and Fixing/ connecting include supply and erection of PVC Tape as per voltage requirement.Complete in all respect as per the direction of EIC. |
| 284 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly . Supply to be done as per TPCODL Spec and approved make dowells. |
| 285 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 286 | Part I- Cost of meterial for LT line using 9 mtr pole and LT Cable of 4C x 95mm2 (P) + 1C x 95 mm2 (M) + 1 C x 16 mm2 (Street light) with accessories - 2.5 Km |
| 287 | Supply and Installation of 9 Mtr. long 300 Kg PSC Pole . Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC. |
| 288 | Supply and Installation of LT Stay set Complete. Complete in all respect as per the approved technical specification and direction of EIC. |
| 289 | Supply and Installation of 7/12 SWG Gl stay wire. Grade -2.Complete in all respect as per the approved technical specification and direction of EIC. |
| 290 | Supply and Installation of LT stay Clamp (1.40Kg/ pair).Complete in all respect as per the approved technical specification and direction of EIC. |
| 291 | Supply and Installation of LT Stay insulator. Complete in all respect as per the approved technical specification and direction of EIC. |
| 292 | LT Accessories with eye hook and Clamp |
| 293 | Supply and Installation of Pole clamp for EYE hook for (XLPE Aerial bunched Cable). Complete in all respect as per the approved technical specification and direction of EIC. |
| 294 | Supply and Installation EYE hook for XLPE Aerial bunched Cable. Complete in all respect as per the approved technical specification and direction of EIC. |
| 295 | Supply and Installation of Dead End Clamp suitable for messenger XLPE Aerial bunched Cable. Complete in all respect as per the approved technical specification and direction of EIC. |
| 296 | Supply and Installation of Suspension Clamp with EYE hook for ABC. Complete in all respect as per the approved technical specification and direction of EIC. |
| 297 | Supply and Stringing of 4Cx95 mm2 (P)+1Cx95 mm2(M)+1CX16 mm2(Street Light)(LT AB Cable). Complete in all respect as per the approved technical specification and direction of EIC. |
| 298 | Supply and Installation of 4 WAY SERVICE Distribution Box with kit kat fuse and Aluminium bus bar. Complete in all respect as per the approved technical specification and direction of EIC. |
| 299 | Supply and Installation of Insulated piercing connector. Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm. Complete in all respect as per the approved technical specification and direction of EIC. |
| 300 | Supply and Installation of GI Pipe Earthing (each 5th pole to earth). Complete in all respect as per the approved technical specification and direction of EIC. |
| 301 | SITC of Coil Earthing.Complete in all respect as per the approved technical specification and direction of EIC. |
| 302 | Supply and Installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.-2 Mtr. For connecting pole with Coil earthing.Complete in all respect as per the approved technical specification and direction of EIC. |
| 303 | Supply and Installation of Danger plate (LT). Complete in all respect as per the approved technical specification and direction of EIC. |
| 304 | Supply and Installation of Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 305 | Supply and Installation of GI barbed wire anticlimbing device 3 Kg Per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 306 | Supply and Installation of Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's= (4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 307 | Supply and Fixing of GI Nut, Bolt & Washer of different sizes (0.5 Kg/Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 308 | Supply and Painting of Black Paint(GIS Numbering & Zebra Stripping) as per Specification and the direction of EIC. |
| 309 | Supply and Painting of Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background as per Specification and the direction of EIC. |
| 310 | Pat -I : Cost of Civil Work |
| 311 | Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 312 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm)= 0.375 cum( Per pole). Complete in all respect as per the direction of EIC. |
| 313 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powdercalculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail