| 1 | WPB 160x152 (30.44KG/Mtr.),13 mtr- with base plate 300x300x12 |
| 2 | 33KV F clamp |
| 3 | 33KV V cross arm(22Kg),GI |
| 4 | GI Back Clamp for V cross arm(33KV)(1.7 kg each) |
| 5 | 33 KV pin insulator polymer |
| 6 | HT Stay Set complete |
| 7 | 7/10 SWG GI Stay wire , Grade-2 |
| 8 | Stay Insulator |
| 9 | HT Stay Clamp (1.9 Kg / Pair) |
| 10 | Earthing Coil |
| 11 | 6SWG GI Wire for earthing |
| 12 | 148 mm sq. AAA Conductor |
| 13 | GI Nuts & Bolts of Assorted size |
| 14 | GI Barbed wire (Anti climbing device@3Kg. Per support) |
| 15 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 16 | Danger Board |
| 17 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 18 | Sundries (Pole Numbering, Zebra Paintinig, Binding wire etc) |
| 19 | WPB 160x152 (30.44KG/Mtr.),13 mtr- with base plate 300x300x12 |
| 20 | Top Pressure channel 100x50x6mm,(3.5Mx6Pc)(9.2kg/mtr) |
| 21 | Bracing Channel (75x40x6)mm,GI channel 4mtr long 2nos (6.8kg/mtr) |
| 22 | Bracing Angle (50x50x6)mm G.I angle for 4.5Meter long 2 Nos (4.5kg/Mtr) |
| 23 | Disc insulator(B&S)90 KN polymer |
| 24 | HW fitting(B&S) 90 KN,4 bolt |
| 25 | 34 KV pin insulator polymer |
| 26 | P G Clamp for 148mm2AAAC |
| 27 | Fish Plate 50X8 mm., 3.14kg/Mtr., each 0.280 mtr. Length |
| 28 | HT Stay Set complete |
| 29 | 7/10 SWG GI Stay wire , Grade-2 |
| 30 | Stay Insulator |
| 31 | HT Stay Clamp (1.9 Kg / Pair) |
| 32 | Earthing device / Support Coil type (GI) |
| 33 | No-8 GI Wire Dia 4.6mm 0.131Kg/mtr - 2mtr each pole connecting pole with Coil earthing. |
| 34 | Danger Board |
| 35 | GI Clamp for Danger Board GI Flat(25X3 @0.6 Kg/Mtr) 510 mm length(0.306 Kg/Piece) |
| 36 | G I Barbed Wire anticlimbimg device 3. kg per support |
| 37 | GI clamp for anti Climbing Devicev25X3 mm Flat (0.6 Kg /Mtr) Flat of 0.510 Mtr Length =4 No.s /Pole(1.22 KG /Pole) |
| 38 | GI nuts,bolts and washers |
| 39 | Sundrise (Pole Numbering, Zebra Painting and other accessories etc) |
| 40 | 11 Mtr long 160X152mm WPB pole |
| 41 | 11KV F Clamp 2.9 kg each |
| 42 | 11KV V Cross arm (10.2 Kg each) |
| 43 | G.I. Back clamp for V cross arm (11 KV) 0.85 each) |
| 44 | Disc Insulator (T&C) 45KN Polymer |
| 45 | Hardware (T&C) 45 KN |
| 46 | 11 KV Pin Insulator Polymer |
| 47 | 100x50x6mm GI channel for straight Cross arm 1.2Mtr &0.3Mtr (9.2Kg/Mtr) |
| 48 | HT Stay Set complete |
| 49 | 7/10 SWG GI Stay wire , Grade-2 |
| 50 | Stay Insulator |
| 51 | HT Stay Clamp (1.9 Kg / Pair) |
| 52 | Earthing Coil |
| 53 | 6SWG GI Wire for earthing |
| 54 | 80 mm sq. AAA Conductor |
| 55 | PG clamp for 80 mm² AAA conductor |
| 56 | GI Nuts & Bolts of Assorted size |
| 57 | GI Barbed wire (Anti climbing device@3Kg. Per support) |
| 58 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 59 | Danger Board |
| 60 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 61 | Sundries (Pole Numbering, Zebra Paintinig, Binding wire etc) |
| 62 | 8 Mtr long 300 Kg PSC pole |
| 63 | (3X35+1X25) mmsq AB Cable |
| 64 | (1X35+1X25)mmsq AB Cable |
| 65 | Pole clamp for I hook |
| 66 | Dead end Clamp |
| 67 | Eye hook for Dead end Clamp |
| 68 | Suspension Clamp with I hook for ABC |
| 69 | G.I. Nuts & Bolts of Assorted size |
| 70 | LT Stay Set |
| 71 | LTStay Insulator |
| 72 | LT Stay Clamp (1.40 Kg / Pair) |
| 73 | 7/12 SWG GI stay wire, Grade 2 |
| 74 | RCC Base Plate for support |
| 75 | Earthing Device Coil type (G.I.) |
| 76 | 6SWG GI Wire |
| 77 | GI Barbed wire (Anti climbing device@3Kg. Per support) |
| 78 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 79 | Danger Board |
| 80 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 81 | Sundries (Pole Zebra Painting, Binding tape and other accessories etc) |
| 82 | 11 Mtr long 160X152mm WPB pole |
| 83 | Earthing of support (coil type) |
| 84 | No.8 GI Wire (dia 4.6mm) 0.131Kg / Mtr 2Mtr for connecting pole with coil earthing |
| 85 | Top Pressure Channel 100x50x6 mm 2.8 mtr long 2Nos for top channel (@9.2kg/mtr) (Galvanized) |
| 86 | MS Channel 75x40x6 mm 2.8 mtr long 2Nos for bracing at DPs @6.8 Kg/mtr(Galvanized) |
| 87 | MS Angel 50x50x6mm 3.5mtr long 2Nos for cross bracing of DPs @4.5Kg/mtr (Galvanized) |
| 88 | 11KV Disc Insulator (B & S) 45KN Polymer |
| 89 | Hard Ware Fitting (B & S) 45 KN, 3 bolt |
| 90 | Fish Plate 50X8 mm., 3.14kg/Mtr., each 0.280 mtr. Length |
| 91 | HT stay set complete |
| 92 | HT Stay insulator |
| 93 | HT Stay Clamp(1.9 Kg/Pair) |
| 94 | 7/8 SWG G.I. Stay wire , Grade-2 |
| 95 | Black Paint |
| 96 | G.I. barbed wire @3KG Per Pole |
| 97 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 98 | Danger Plate |
| 99 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 100 | GI Nuts & Bolts of Assorted size |
| 101 | 1C x 300 mm² 11KV XLPE Cable(Armoured),A2XFY (70X4) |
| 102 | Heat shrinkable jointing kit for 1Cx300 mm² 11KV XLPE Cable(outdoor type) |
| 103 | Clamp for pipe |
| 104 | Lightning Arrester(12 KV,10 KA) Station Class |
| 105 | GI pipe Earthing 40mm dia mediun gauge 2.5mtr long |
| 106 | 25X3 mm GI Flat, 0.6Kg/Mtr, 15 Mtr per earthing |
| 107 | Sundries |
| 108 | 9 Mtr. Long 300 Kg PSC pole |
| 109 | Base Plate for support |
| 110 | Top Pressure channel (100x50x6)MM GI 2.8Mtr. long, 2Nos.(9.2kg/Mtr) |
| 111 | Bracing channel (75x40x6)MM GI 2.8Mtr. long, 2Nos.(6.8kg/Mtr) |
| 112 | Bracing angle (50x50x6) MM GI angle, 4.0 Mtr. long, 2Nos. (4.5kg/mtr) |
| 113 | LT Stay Set complete |
| 114 | LT Stay Insulator |
| 115 | LT Stay clamp |
| 116 | 7/12 SWG Stay Wire |
| 117 | LT Back clamp for Bracing Channel (0.85kg/No) |
| 118 | G.I pipe Earthing 40 mm dia medium gauge(3.25mm thick ness) 3 mtr long |
| 119 | No 25 x 6 mm GI flat for earthing |
| 120 | Pole clamp for I hook |
| 121 | Suspension Clamp with I hook for ABC |
| 122 | G.I. Nuts & Bolts of Assorted size |
| 123 | Earthing Device Coil type (G.I.) |
| 124 | No.8 GI Wire (dia 4.6mm) 0.131Kg / Mtr 2Mtr for connecting pole with coil earthing |
| 125 | Danger Board |
| 126 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 127 | GI Barbed wire (Anti climbing device@3Kg. Per support) |
| 128 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 129 | 1.1KV,4CX300mm2 XLPE insulated armoured cable |
| 130 | JT. KIT O/D 1.1KV XLPE 4X300 SQ.MM HS |
| 131 | Clamp for holding of Pipe |
| 132 | Sundries (Pole numbering, Zebra Painting, Binding wore and other accessories etc) |
| 133 | Stay concreting in ratio 1:2:4 (0.5x0.5x0.8)mtr . |
| 134 | Concreting of poles in ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.307Cu.mtr |
| 135 | Concreting of poles in ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.44Cu.mtr |
| 136 | Concreting of poles in ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.62Cu.mtr |
| 137 | Couping of poles in ratio 1:1.5:3 (500X500X475)= 0.11875 Cu mtr |
| 138 | Material for earthing including masonary work for earth pit, and cement plate cover including salt, Charcoal etc. |
| 139 | Dismantling of 9/8 Mtr. PCC/Joist Pole (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km /site store and refilling the pit with loose earth and ramming including removal and disposal of malba at proper location as per instruction of EIC. |
| 140 | Dismantling of 11/13 Mtr. Joist/WPB Pole- 150X150 mm/ 160X160 mm (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km /site store and refilling the pit with loose earth and ramming including removal and disposal of malba at proper location as per instruction of EIC. |
| 141 | Dismantling of ACSR/AAAC 80/100 mm2 from overhead line, recoiling, loading, transportation, unloading and staking at a proper place in safe position/site store |
| 142 | Dismantle-LT AB Cable with acces |
| 143 | Dismantling of Steel Structure ( Angle/ Channel/ Flat) and Nuts and Bolt including loading, transportation, unloading and staking of dismantled material at a proper place in safe position/BA site store |
| 144 | Supply & Laying of PIPE HDPE 110MM DIA PN8 , PE 80 through HDD method .Scope of work also includes making Trenchless ducts with 110 mm Dia HDPE pipe casing using HDD machine including supply of HDPE pipe as per IS 4984 |
| 145 | Supply & Laying/Mounting and fixing of HDPE Pipe -110 mm Dia ( PN-8,Grade PE-80)and sealing of the same for LT/HT Cables. Scope also includes providing and laying all required consumable etc. for collar fixing and sealing of Pipe. (Excavation is excluded) |
| 146 | Supply and Installation of cable Route marker including transportation from site/tent, excavation, refilling, disposing of malba, flooding with water, ramming/compacting of foundation as per standard specifications and drawing. |
| 147 | Excavation of cable trench length (3 mtr W X 3 mtr D) by providing all necessary tool, Manpower, pump etc suitable for HT & LT Cable laying. Scope also includes supply of neccessry barricades at the excavation site. |
| 148 | Provide all necessary Manpower, Tool, Tackles, Barricades, Dewatering pump, Gunny bags,Compressor for excavation (3 mtr W X 3 mtr D) in Hard Surface. |
| 149 | Back fill the cable excvation site with same earth (3 mtr W X 3 mtr D). Scope also includes provide of necessary Tools,Machinery & Manpower for the activity. |
| 150 | Supply all materials required for backfilling and has to carry out the job of backfilling with sand, as per DISCOM Standards |
| 151 | PCC (1:3:6(M-10 Grade)) below trench (Length 2800 mm, width 2800mm, thickness 75mm throughout) |
| 152 | Brick work Both Sides(2.8 mtr. L X 0.19 mtr W X 0.5 mtr D) with F.P.S. bricks of class designation 75mm in Cement mortar 1:4 (1 Cement : 4 Coarse sand) as per standard specifcation. Scope includes supply of all material |
| 153 | 15 mm cement plaster, All Sides (2.83+0.21 mtr. L X 0.5 mtr W) on the rough side of single brick wall of mix -1:4 (1 Cement : 4 Fine sand (50 % fine :50% coarse)) as per standard specification. Scope includes supply of all material. |
| 154 | Supply and erection of material for RCC partition slab 800mmx250mmx75mm (M-25 grade)- 12 Nos. with supply of all civil material (Cement, Sand & 10 to 12mm stone aggregate), with 8mm dia R/f cutting & bending etc. |
| 155 | Supply & Laying of PIPE HDPE 110MM DIA PN8 , PE 80 through HDD method .Scope of work also includes making Trenchless ducts with 110 mm Dia HDPE pipe casing using HDD machine including supply of HDPE pipe as per IS 4984 |
| 156 | Supply & Laying/Mounting and fixing of HDPE Pipe -110 mm Dia ( PN-8,Grade PE-80)and sealing of the same for LT/HT Cables. Scope also includes providing and laying all required consumable etc. for collar fixing and sealing of Pipe. (Excavation is excluded) |
| 157 | Supply and Installation of cable Route marker including transportation from site/tent, excavation, refilling, disposing of malba, flooding with water, ramming/compacting of foundation as per standard specifications and drawing. |
| 158 | Excavation of cable trench length (3 mtr W X 3 mtr D) by providing all necessary tool, Manpower, pump etc suitable for HT & LT Cable laying. Scope also includes supply of neccessry barricades at the excavation site. |
| 159 | Provide all necessary Manpower, Tool, Tackles, Barricades, Dewatering pump, Gunny bags,Compressor for excavation (3 mtr W X 3 mtr D) in Hard Surface. |
| 160 | Back fill the cable excvation site with same earth (3 mtr W X 3 mtr D). Scope also includes provide of necessary Tools,Machinery & Manpower for the activity. |
| 161 | Supply all materials required for backfilling and has to carry out the job of backfilling with sand, as per DISCOM Standards |
| 162 | PCC (1:3:6(M-10 Grade)) below trench (Length 2800 mm, width 2800mm, thickness 75mm throughout) |
| 163 | Brick work Both Sides(2.8 mtr. L X 0.19 mtr W X 0.5 mtr D) with F.P.S. bricks of class designation 75mm in Cement mortar 1:4 (1 Cement : 4 Coarse sand) as per standard specifcation. Scope includes supply of all material |
| 164 | 15 mm cement plaster, All Sides (2.83+0.21 mtr. L X 0.5 mtr W) on the rough side of single brick wall of mix -1:4 (1 Cement : 4 Fine sand (50 % fine :50% coarse)) as per standard specification. Scope includes supply of all material. |
| 165 | Supply and erection of material for RCC partition slab 800mmx250mmx75mm (M-25 grade)- 12 Nos. with supply of all civil material (Cement, Sand & 10 to 12mm stone aggregate), with 8mm dia R/f cutting & bending etc. N:B:. Salvage value @8% to be deducted from the contractor' bill. Please Enable Macros to View BoQ information |