|
| 1 | Supply of Rear View Mirror Outer |
| 2 | Supply of End Outline Marker Lamp |
| 3 | Supply of Mud Flap |
| 4 | Supply of Side Body Indicator |
| 5 | Supply of Tail Lamp |
| 6 | Supply of Lock Centre Flap |
| 7 | Supply of Striker Centre Flap |
| 8 | Supply of Assy Wiper Blade |
| 9 | Supply of Speed Sensor 12V/24V (8 Pulses) |
| 10 | Supply of Break Lineging Set |
| 11 | Supply of Clutch Master Cyl. 19.05 Dia |
| 12 | Supply of Assy. Front Blinker Lamp-RH-12V |
| 13 | Supply of Hex Bolt M10 X 110 |
| 14 | Supply of Spark Plug 697 CNG BSIV |
| 15 | Supply of Cicar Coil (With Top Conn) |
| 16 | Supply and Replacement of Brake fluid (dot-03) 500 ML |
| 17 | Supply of Silicon Tube |
| 18 | Supply of MISC. Items |
| 19 | Supply of Assy Oil Filter Element Spinon BS4 |
| 20 | Supply of Elem. Air Cleaner (Primary) : LP/LPT712 |
| 21 | Supply of Elem. Air Cleaner (Safety) : LP / LPT712 |
| 22 | Supply of Coolant Radicool |
| 23 | Supply of SAE 80W-90 Gear Oil |
| 24 | Supply of high-quality, multi-grade hypoid Rear Axle Oil |
| 25 | Supply of Front Leaf Addiation |
| 26 | Supply of Rear Leaf Addiaton |
| 27 | Supply of Leaf Pin |
| 28 | Supply of Center Bolt |
| 29 | Supply of mineral-based hydraulic fluid Steering Oil |
| 30 | Supply of Muzitol Engine Oil CI4 CNG 15W40 |
| 31 | Labour charges for Lift Oil Leakage Repairing |
| 32 | Complete electrical repair work including replacement of wiring, Cabin lamps, relays, fuse, sensors as reqd. |
| 33 | Labour charges for CNG Leakage Checking & Repairing |
| 34 | Labour charges for Bumper Repairing |
| 35 | Labour charges for Clutch Setting |
| 36 | Providing, fixing and reparing of Breaks System |
| 37 | Painting of Load Body out side & Chassis Frame & Other |
| 38 | Labour charges for Front and Rear Suspension Repairing |
| 39 | Labour charges for Cabin Touching & Painting |
| 40 | Labour charges for Washing & Greasing |
| 41 | Supply and fixing red and Yellow tape 10 meter / vehicle @250 |
| 42 | Labour charges for CNG Cylinder Hydrotesting, Leakage Repairing & Checking |
| 43 | Provide the fitness certificate as per RTO reciept for the period 2025-2026 with including all charges. (Payment will be paid as per reiciept) |
| 44 | Labour charges for Cylinder Testing Cleaning (Hydro Testing CNG Leakage Rparing and Replacement of Kit) etc. as required. |
| 45 | Providing pollution checking Certificate for the period 2025-2026 |
| 46 | Provision of Slogan writing slogan at vehicle |
| 47 | Labour charges for Engine Tuning & Checking |
| 48 | Labour charges for Both Side Supd Repairing |
| 49 | Charges for complete cabin minor repair with all doors locks, door handles, front grill including denting, welding & repairing wherever necessary with proper locking arrangement, all the rubber channel of door, glass, front and rear window glass etc as required. |
| 50 | Denting And Repairing Of Load Body And Fixing Of Metal Sheets Where Ever Necessary |
| 51 | Labour charges for Lift Repairing And Welding |
| 52 | Labour charges for Complete Engine Service |
| 53 | Labour charges for Mudguard Repairing |
| 54 | Labour charges for Break Repairing |
| 55 | Labour charges for Rupd Repairing Please Enable Macros to View BoQ information |