| 1 | Development of tube well with suitable capacity of air compressor i/c lowering of the , necessary induction pipe or line i/c cost of fuel, hire charges of compressor etc as reqd. The development shall be considered complete when Gravel stop sinking, Discharge ceased to improve and the sand contents are not more than 10 PPM after 20,minutes of starting the pump complete as reqd. |
| 2 | Supplying, lowering, testing and commissioning of vertical type, multistage, totally enclosed water filled deep well submersible pumping set complete i/c connection etc. as reqd. Single Phase 1.5 HP having discharge of 72 LPM Approx. at 49 M Head. |
| 3 | Supply, Installation, testing and commissioning of cubical type control panel board for single phase & Three Phase submersible pumping set of following rating complete with contactor, relay, MCB, condenser, voltmeter, ammeter and indication lamp etc including connections etc as reqd. 1.5 HP (Single Phase) |
| 4 | P&F following sizes of PVC insulated & PVC sheathed copper conductor 3 core submersible cable confirming to IS.694/1990 etc. as reqd. 3x 2.5 sq.mm |
| 5 | Supply, lowering and fixing following size of G.I. Pipe (M-Class) i/c cutting threading on both sides etc. ISI marked etc as reqd. 32mm(Nominal Bore) |
| 6 | Rewinding of single/three phase AC motors of vertical type multi stage submersible pump set of following rating :- (a)single phase 1 and 1.5 HP |
| 7 | Replacement of following items for cubicle panel etc as required (a) Capacitor 36 mfd. |
| 8 | Lifting the existing submersible pump set with its all acessories from well and lowering the same along with all accessories for the depth up to 50 meter complete as required. |
| 9 | Supplying and fixing following rating, double pole, 240 V, isolator in the existing MCB DB complete with connections,testing and commissioning etc. as required.(a)40 Amp. |
| 10 | Repairing of the Pumping unit of 1/1.5/3 HP vertical type, multistage, submersible pump set by replacement of following accessories/parts etc compete as reqd.(a) Gun Metal Bush / Bearing. |
| 11 | (b) Pump Shaft. |
| 12 | (c) Impeller. |
| 13 | PART- B Comprehensive AMC (Annual Maintenance Contract) for repair and maintenance of Tube Wells installed at various Municipal Parks for depth of 50 meters to 100 meters. Cost for one Tube wells with submersible p/set etc of upto 1/1.5 HP Please Enable Macros to View BoQ information |